TxDOT contract A00188408 bid tabulation

Surfacing/Roadway Restoration, FM 2432 (SH 75 to FM 1484). Let by Texas DOT on May 2, 2025, Montgomery, Houston District. 5 bids received; low bid $4,090,557 by Vulcan Materials Asphalt and Construction, LLC, -18% against the engineer's estimate of $4,988,014.

Owner
Texas DOT
Letting
02 MAY 2025
Pay items
52
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Vulcan Materials Asphalt and Construction, LLC$4,090,557Low-18%
2Durwood Greene Construction Co.$4,397,565+8.0%-12%
3Texas Materials Group, Inc.$4,495,318+10%-10%
4Posillico Civil, Inc.$5,031,604+23%+1.0%
5Knife River Corporation - South$5,098,111+25%+2.0%
TxDOT contract A00188408: bids by rank

Engineer's estimate: $4,988,014.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Vulcan Materials Asphalt and Construction, LLC2. Durwood Greene Construction Co.3. Texas Materials Group, Inc.4. Posillico Civil, Inc.5. Knife River Corporation - South
1Backfill (type A) (134-7001)STA268$300.00$180.00$225.00$315.00$470.00$754.00
2SP mixes SP-D PG70-22 (344-7051)TON9,253$140.00$115.00$134.00$125.00$138.00$146.30
3SP mixes SP-D sac-A PG70-22 (344-7052)TON9,253$130.00$125.00$148.00$142.00$155.00$152.30
4Tack coat (344-7077)GAL6,734$3.00$4.75$3.00$3.75$5.00$4.00
5Flexible pavement structure repair(10") (351-7009)SY5,612$50.00$65.00$50.00$73.50$78.00$92.00
6Planing asphalt concrete pavement(0" to 2") (354-7032)SY16,946$9.75$4.00$5.00$8.75$2.19$7.00
7Planing asphalt concrete pavement(0" to 3") (354-7033)SY600$7.95$2.00$9.00$16.00$2.33$5.00
8Planing asphalt concrete pavement(3") (354-7052)SY13,819$2.65$2.75$3.00$4.00$1.86$3.50
9Planing asphalt concrete pavement (1.5") (354-7074)SY97,811$2.12$1.40$1.75$2.65$1.32$1.65
10Mobilization (500-7001)LS1$427,946$329,550$150,000$140,000$400,000$124,300
11Barricades, signs and traffic handling (502-7001)MO5$12,000$1,200.00$4,000.00$1,000.00$20,000$9,917.00
12Portable changeable message sign (503-7001)DAY150$170.00$56.00$100.00$84.00$110.00$272.00
13TMA (stationary) (505-7001)DAY104$375.00$173.08$350.00$250.00$345.00$577.00
14TMA (mobile operation) (505-7002)HR672$100.00$16.37$30.00$75.00$60.00$92.00
15Intersections (ACP) (530-7002)SY3,405$30.00$20.08$24.00$20.50$30.00$38.75
16Driveways (ACP) (530-7010)SY13,541$30.00$22.16$25.00$22.50$30.00$24.50
17Mill rumble strips (asphalt) (centerline) (533-7002)LF25,328$0.33$0.32$0.25$0.26$0.33$0.27
18Replace existing aluminum signs(type A) (636-7004)SF32$40.00$28.50$35.00$30.00$28.50$31.00
19Replace existing aluminum signs(type O) (636-7006)SF44.50$50.00$115.00$52.00$120.00$115.00$125.00
20Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH6$637.00$560.00$675.00$590.00$560.00$608.00
21Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH28$575.00$495.00$620.00$520.00$495.00$538.00
22Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH11$875.00$645.00$750.00$680.00$645.00$701.00
23Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH4$866.00$755.00$850.00$800.00$755.00$820.00
24Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH16$1,400.00$755.00$920.00$800.00$755.00$820.00
25Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,383.00$855.00$1,200.00$900.00$855.00$930.00
26Remove SM RD SN sup&AM (644-7073)EACH62$117.00$95.00$85.00$100.00$95.00$103.00
27Work zone pavement marking non-removing (W)4"(solid) (662-7004)LF159,573$0.41$0.30$0.32$0.32$0.25$0.33
28Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF4,941$0.87$0.41$0.43$0.45$0.40$0.45
29Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF1,932$4.30$2.99$3.20$3.15$4.04$3.25
30Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH66$117.00$100.00$110.00$105.50$73.03$109.00
31Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH3$141.00$140.00$150.00$147.50$116.24$152.00
32Work zone pavement marking non-removing (W)(RR crossing) (662-7024)EACH6$300.00$190.00$210.00$200.00$202.16$206.00
33Work zone pavement marking non-removing(W)(word) (662-7030)EACH42$127.00$105.00$120.00$110.00$82.23$114.00
34Work zone pavement marking non-removing (Y)4"(broken) (662-7033)LF6,240$0.44$0.30$0.32$0.32$0.30$0.33
35Work zone pavement marking non-removing (Y)4"(solid) (662-7035)LF143,187$0.39$0.30$0.32$0.32$0.25$0.33
36Work zone pavement marking non-removing (Y)12"(solid) (662-7040)LF2,313$2.35$1.98$2.20$2.00$2.02$2.15
37Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF222$2.20$1.25$1.35$1.32$3.03$1.30
38Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,647$4.60$1.25$1.35$1.32$1.52$1.30
39Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF644$8.80$6.18$7.00$6.50$7.83$6.70
40Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF771$7.57$6.18$7.00$6.50$7.83$6.70
41Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF53,191$1.47$0.85$0.90$0.90$1.06$0.92
42All-wther PM type I (Y)6"(solid)(100MIL) (666-7315)LF47,729$1.29$0.88$0.95$0.93$1.06$0.96
43All-wther PM type I (Y)6"(broken)(100MIL) (666-7316)LF2,080$1.39$0.88$0.95$0.90$1.52$0.96
44Prefabricated PM type C (W)(arrow) (668-7091)EACH22$267.00$235.00$250.00$250.00$353.79$255.00
45Prefabricated PM type C (W)(double arrow) (668-7093)EACH1$391.00$265.00$300.00$280.00$454.87$288.00
46Prefabricated PM type C (W)(word) (668-7103)EACH14$345.00$240.00$255.00$250.00$404.33$260.00
47Prefabricated PM type C (W)(RR crossing) (668-7108)EACH2$785.00$500.00$750.00$525.00$657.04$543.00
48Prefabricated PM type C (W)(bike arrow) (668-7113)EACH20$221.00$145.00$160.00$150.00$101.08$157.00
49Prefabricated PM type C (W)(bike symbol) (668-7115)EACH28$310.00$200.00$215.00$210.00$126.35$217.00
50Reflectorized pavement marker type I-C (672-7002)EACH82$7.27$6.01$7.00$6.50$6.32$6.50
51Reflectorized pavement marker type II-A-A (672-7004)EACH1,328$7.53$6.01$7.00$6.50$6.32$6.50
52Underseal course (3006-7001)GAL22,446$6.00$6.00$6.00$4.50$5.00$5.70
TxDOT contract A00188408: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy