TxDOT contract A00129807 bid tabulation
Surfacing/Roadway Restoration, FM 524 (UP Railroad to FM 521). Let by Texas DOT on April 3, 2025, Brazoria, Houston District. 6 bids received; low bid $1,714,183 by Vulcan Materials Asphalt and Construction, LLC, -16% against the engineer's estimate of $2,031,777.
- Owner
- Texas DOT
- Letting
- 03 APR 2025
- Pay items
- 58
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Vulcan Materials Asphalt and Construction, LLC | $1,714,183 | Low | -16% |
| 2 | Durwood Greene Construction Co. | $1,747,453 | +2.0% | -14% |
| 3 | Forde Construction Company, Inc. | $1,754,301 | +2.0% | -14% |
| 4 | Elite Kings Construction, LLC | $1,793,340 | +5.0% | -12% |
| 5 | Cornerstone Paving and Construction, L.L.C. | $1,813,469 | +6.0% | -11% |
| 6 | Texas Materials Group, Inc. | $2,336,250 | +36% | +15% |
Engineer's estimate: $2,031,777.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Vulcan Materials Asphalt and Construction, LLC | 2. Durwood Greene Construction Co. | 3. Forde Construction Company, Inc. | 4. Elite Kings Construction, LLC | 5. Cornerstone Paving and Construction, L.L.C. | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A or B) (134-7004) | STA | 208 | $344.00 | $207.00 | $200.00 | $337.00 | $100.00 | $415.00 | $385.00 |
| 2 | D-GR HMA type D sac-A PG70-22 (341-7049) | TON | 4,907 | $160.00 | $126.00 | $150.00 | $146.00 | $170.00 | $133.55 | $210.00 |
| 3 | Flexible pavement structure repair(4") (351-7003) | SY | 300 | $80.81 | $72.00 | $73.00 | $94.00 | $50.00 | $50.30 | $88.00 |
| 4 | Flexible pavement structure repair(8") (351-7007) | SY | 500 | $48.52 | $74.00 | $100.00 | $115.00 | $50.00 | $86.00 | $123.00 |
| 5 | Planing asphalt concrete pavement (1.5") (354-7074) | SY | 59,484 | $2.74 | $0.81 | $1.75 | $2.10 | $3.00 | $2.00 | $4.00 |
| 6 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 60 | $343.90 | $410.30 | $400.00 | $325.00 | $338.00 | $253.00 | $630.00 |
| 7 | Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292) | EACH | 2 | $1,800.00 | $950.00 | $1,600.00 | $1,900.00 | $700.00 | $3,375.00 | $2,300.00 |
| 8 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 4 | $2,100.00 | $1,250.00 | $1,800.00 | $2,070.00 | $1,700.00 | $3,410.00 | $2,500.00 |
| 9 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,900.00 | $2,500.00 | $2,300.00 | $2,370.00 | $2,000.00 | $4,065.00 | $3,300.00 |
| 10 | Clean existing culverts (480-7001) | EACH | 100 | $550.00 | $350.00 | $750.00 | $330.00 | $1,500.00 | $350.00 | $650.00 |
| 11 | Mobilization (500-7001) | LS | 1 | $184,707 | $160,000 | $125,000 | $140,000 | $25,000 | $160,000 | $125,000 |
| 12 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $10,500 | $19,300 | $3,500.00 | $2,000.00 | $1,488.10 | $5,000.00 | $1,850.00 |
| 13 | Portable changeable message sign (503-7001) | DAY | 122 | $100.00 | $56.00 | $300.00 | $125.00 | $280.00 | $65.00 | $193.00 |
| 14 | TMA (stationary) (505-7001) | DAY | 54 | $250.00 | $336.00 | $350.00 | $180.00 | $250.00 | $125.00 | $386.00 |
| 15 | TMA (mobile operation) (505-7003) | DAY | 10 | $283.50 | $336.00 | $250.00 | $180.00 | $350.00 | $150.00 | $386.00 |
| 16 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 20,155 | $1.03 | $0.52 | $0.38 | $0.30 | $0.76 | $0.15 | $0.40 |
| 17 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 245 | $13.84 | $14.40 | $22.00 | $21.00 | $15.00 | $14.60 | $14.00 |
| 18 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 160 | $32.50 | $25.86 | $24.00 | $21.00 | $15.00 | $28.00 | $19.00 |
| 19 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 275 | $36.60 | $30.76 | $24.00 | $21.00 | $15.00 | $21.00 | $19.00 |
| 20 | Electrical conductor (no.6) bare (620-7009) | LF | 655 | $1.69 | $3.00 | $2.50 | $2.40 | $2.00 | $2.20 | $3.00 |
| 21 | Electrical conductor (no.4) bare (620-7011) | LF | 25 | $3.16 | $3.20 | $6.00 | $5.30 | $2.00 | $2.55 | $12.00 |
| 22 | Electrical conductor (no.4) insulated (620-7012) | LF | 45 | $3.55 | $4.25 | $7.00 | $6.40 | $2.00 | $2.90 | $12.00 |
| 23 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 1,185 | $3.25 | $3.50 | $3.40 | $3.10 | $2.00 | $3.00 | $4.50 |
| 24 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $1,300.00 | $1,216.00 | $1,400.00 | $1,330.00 | $500.00 | $1,267.00 | $3,500.00 |
| 25 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $7,180.84 | $10,682 | $7,950.00 | $7,500.00 | $8,048.00 | $11,345 | $8,300.00 |
| 26 | Aluminum signs (type A) (636-7001) | SF | 31 | $31.80 | $43.00 | $32.00 | $30.00 | $16.17 | $78.00 | $59.00 |
| 27 | Replace existing aluminum signs(type A) (636-7004) | SF | 9 | $35.00 | $18.50 | $34.00 | $30.00 | $331.89 | $28.00 | $22.00 |
| 28 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 42 | $705.00 | $515.00 | $600.00 | $530.00 | $550.41 | $515.00 | $600.00 |
| 29 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 9 | $905.00 | $795.00 | $920.00 | $810.00 | $991.33 | $787.00 | $930.00 |
| 30 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $950.00 | $995.00 | $1,200.00 | $1,080.00 | $1,389.42 | $1,050.00 | $1,200.00 |
| 31 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $1,475.00 | $1,050.00 | $1,000.00 | $900.00 | $1,216.63 | $878.00 | $1,200.00 |
| 32 | Remove SM RD SN sup&AM (644-7073) | EACH | 49 | $155.00 | $100.00 | $65.00 | $56.50 | $130.00 | $55.00 | $117.00 |
| 33 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 7 | $30.00 | $35.00 | $30.00 | $22.50 | $36.75 | $22.00 | $41.00 |
| 34 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 14 | $95.00 | $75.00 | $130.00 | $120.00 | $85.29 | $112.00 | $88.00 |
| 35 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 103 | $10.00 | $3.00 | $11.00 | $6.30 | $7.00 | $5.00 | $7.00 |
| 36 | Work zone pavement marking removing (traffic BTN) type W (662-7058) | LF | 41,412 | $1.00 | $1.50 | $0.60 | $0.50 | $0.86 | $0.68 | $0.50 |
| 37 | Work zone pavement marking removing (traffic BTN) type Y (662-7060) | LF | 20,750 | $1.00 | $1.50 | $0.50 | $0.50 | $0.49 | $0.70 | $0.50 |
| 38 | Work zone pavement marking removing (W)(RR crossing) (662-7088) | EACH | 1 | $500.00 | $437.00 | $550.00 | $290.00 | $275.00 | $450.00 | $320.00 |
| 39 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 142 | $7.50 | $8.25 | $12.00 | $8.00 | $7.50 | $10.00 | $9.00 |
| 40 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 1 | $500.00 | $600.00 | $800.00 | $503.00 | $475.00 | $575.00 | $560.00 |
| 41 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 41,412 | $1.40 | $1.00 | $0.95 | $1.05 | $0.95 | $1.30 | $1.50 |
| 42 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 9,427 | $1.39 | $1.25 | $1.05 | $0.90 | $0.88 | $1.10 | $1.30 |
| 43 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 4,290 | $1.53 | $1.25 | $1.05 | $0.90 | $0.85 | $1.10 | $1.30 |
| 44 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 339 | $6.40 | $6.00 | $7.00 | $6.40 | $4.00 | $6.00 | $7.00 |
| 45 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $34,396 | $47,321 | $61,100 | $59,000 | $19,000 | $59,000 | $57,000 |
| 46 | Removing traffic signals (680-7004) | EACH | 1 | $6,260.00 | $6,139.00 | $3,700.00 | $3,600.00 | $4,000.00 | $3,500.00 | $7,000.00 |
| 47 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $295.00 | $227.00 | $360.00 | $345.00 | $30.00 | $286.00 | $400.00 |
| 48 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $299.15 | $227.00 | $360.00 | $345.00 | $30.00 | $289.00 | $400.00 |
| 49 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $297.50 | $227.00 | $360.00 | $345.00 | $30.00 | $286.00 | $400.00 |
| 50 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 8 | $238.00 | $201.00 | $250.00 | $238.00 | $152.25 | $146.00 | $265.00 |
| 51 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,290 | $3.19 | $3.45 | $3.40 | $3.30 | $3.00 | $3.35 | $4.00 |
| 52 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 2 | $12,500 | $14,415 | $15,700 | $15,000 | $4.00 | $15,222 | $17,000 |
| 53 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 2 | $14,458 | $16,239 | $17,300 | $16,500 | $4.00 | $16,760 | $18,700 |
| 54 | Ditch cleaning and reshaping (foot) (760-7001) | LF | 20,750 | $5.63 | $7.50 | $3.00 | $5.25 | $8.00 | $5.50 | $6.00 |
| 55 | Underseal course (3006-7001) | GAL | 19,035 | $6.90 | $4.25 | $4.00 | $4.10 | $3.00 | $8.50 | $4.50 |
| 56 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $8,531.75 | $10,775 | $10,200 | $9,800.00 | $8,066.40 | $10,700 | $9,000.00 |
| 57 | RVDS (presence det)(install only) (6008-7004) | EACH | 4 | $855.00 | $1,234.00 | $1,200.00 | $1,140.00 | $1,500.00 | $670.00 | $1,300.00 |
| 58 | RVDS (advance det)(install only) (6008-7005) | EACH | 4 | $905.00 | $1,293.00 | $1,200.00 | $1,140.00 | $1,000.00 | $670.00 | $1,300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.