TxDOT contract A00127561 bid tabulation
Widen Road - Add Lanes, SH 7 (SH 75 to HOUSTON COUNTY LINE). Let by Texas DOT on August 8, 2025, Leon, Bryan District. 4 bids received; low bid $21,287,953 by Big Creek Construction, LTD., -12% against the engineer's estimate of $24,159,203.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 103
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $21,287,953 | Low | -12% |
| 2 | Knife River Corporation - South | $23,414,382 | +10% | -3.0% |
| 3 | A. L. Helmcamp, Inc. | $25,472,895 | +20% | +5.0% |
| 4 | Vulcan Materials Asphalt and Construction, LLC | $29,526,604 | +39% | +22% |
Engineer's estimate: $24,159,203.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Knife River Corporation - South | 3. A. L. Helmcamp, Inc. | 4. Vulcan Materials Asphalt and Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 753 | $1,000.00 | $2,000.00 | $2,400.00 | $2,200.00 | $2,210.00 |
| 2 | Removing concrete (riprap) (104-7007) | CY | 86 | $90.00 | $50.00 | $125.00 | $200.00 | $77.42 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 120 | $30.00 | $20.00 | $12.00 | $45.00 | $40.00 |
| 4 | Remove (6") TRT/untrt base & asphalt pavement (105-7026) | SY | 39,399 | $9.00 | $5.00 | $4.75 | $5.00 | $3.95 |
| 5 | Excavation (roadway) (110-7001) | CY | 71,957 | $15.00 | $15.00 | $16.00 | $16.00 | $15.23 |
| 6 | Embankment (final)(DC)(type C) (132-7006) | CY | 14,374 | $20.00 | $15.00 | $5.00 | $8.00 | $44.06 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 113,161 | $1.00 | $1.00 | $0.50 | $1.25 | $3.16 |
| 8 | Hydro mulch seed (permanent_rural_sandy) (164-7017) | SY | 113,161 | $0.65 | $0.40 | $0.40 | $0.41 | $0.40 |
| 9 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 56,581 | $0.70 | $0.49 | $0.45 | $0.40 | $0.39 |
| 10 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 56,581 | $0.70 | $0.49 | $0.45 | $0.40 | $0.39 |
| 11 | Vegetative watering (168-7001) | TGL | 1,132 | $25.00 | $20.00 | $30.00 | $33.00 | $164.18 |
| 12 | Soil retention blankets (CL 1) (type B) (169-7043) | SY | 113,161 | $2.00 | $0.80 | $0.65 | $0.75 | $0.69 |
| 13 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 120,339 | $15.00 | $14.00 | $12.50 | $14.00 | $22.93 |
| 14 | Cement (275-7001) | TON | 1,492 | $266.00 | $210.00 | $200.00 | $240.00 | $215.00 |
| 15 | Cement TRT (existing material)(10") (275-7004) | SY | 120,339 | $4.00 | $3.00 | $1.00 | $2.30 | $3.71 |
| 16 | Prime coat (MC-30) (310-7004) | GAL | 22,093 | $8.50 | $5.00 | $5.00 | $5.60 | $6.08 |
| 17 | SP mixes SP-C PG64-22 (344-7009) | TON | 16,433 | $125.00 | $95.00 | $122.00 | $126.00 | $126.74 |
| 18 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 63,560 | $119.00 | $110.00 | $141.00 | $146.00 | $143.96 |
| 19 | Planing asphalt concrete pavement(2") (354-7051) | SY | 362,382 | $2.00 | $1.50 | $1.75 | $2.60 | $3.20 |
| 20 | Temporary special shoring (403-7001) | SF | 2,180 | $55.00 | $34.00 | $63.00 | $84.00 | $35.00 |
| 21 | Class C concrete (rail foundation) (420-7052) | CY | 130 | $1,100.00 | $650.00 | $760.00 | $1,200.00 | $1,000.00 |
| 22 | Retaining wall (cast-in-place) (423-7016) | SF | 4,839 | $90.00 | $130.00 | $81.00 | $120.00 | $165.00 |
| 23 | Riprap (concrete)(4 in) (432-7001) | CY | 354 | $900.00 | $770.00 | $820.00 | $740.00 | $750.00 |
| 24 | Riprap (mow strip)(4 in) (432-7013) | CY | 254 | $640.00 | $770.00 | $830.00 | $740.00 | $800.00 |
| 25 | Rail (type SSTR) (450-7024) | LF | 810 | $110.00 | $120.00 | $151.00 | $220.00 | $94.00 |
| 26 | Concrete box culvert (4 FT X 4 FT)(extend) (462-7060) | LF | 7 | $800.00 | $1,000.00 | $4,700.00 | $950.00 | $850.00 |
| 27 | Concrete box culvert (6 FT X 4 FT)(extend) (462-7067) | LF | 24 | $1,300.00 | $1,200.00 | $2,550.00 | $1,200.00 | $750.00 |
| 28 | Concrete box culvert (8 FT X 8 FT)(extend) (462-7080) | LF | 52 | $1,100.00 | $1,500.00 | $2,100.00 | $1,500.00 | $1,000.00 |
| 29 | RC pipe (CL III)(18 in) (464-7003) | LF | 2,640 | $100.00 | $60.00 | $60.00 | $53.00 | $60.00 |
| 30 | RC pipe (CL III)(24 in) (464-7005) | LF | 1,345 | $100.00 | $95.00 | $80.00 | $90.00 | $140.00 |
| 31 | RC pipe (CL III)(36 in) (464-7009) | LF | 76 | $250.00 | $180.00 | $170.00 | $170.00 | $250.00 |
| 32 | RC pipe (CL III)(48 in) (464-7011) | LF | 8 | $300.00 | $300.00 | $238.00 | $260.00 | $450.00 |
| 33 | RC pipe (CL IV)(18 in) (464-7019) | LF | 6 | $130.00 | $100.00 | $114.00 | $65.00 | $68.00 |
| 34 | RC pipe (CL IV)(24 in) (464-7021) | LF | 20 | $150.00 | $125.00 | $136.00 | $100.00 | $185.00 |
| 35 | RC pipe (CL IV)(36 in) (464-7024) | LF | 20 | $270.00 | $250.00 | $197.00 | $220.00 | $300.00 |
| 36 | Headwall (CH - PW - 0) (diameter= 18 in) (466-7099) | EACH | 2 | $10,000 | $5,500.00 | $20,200 | $5,300.00 | $4,000.00 |
| 37 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 7 | $10,000 | $7,000.00 | $21,100 | $6,900.00 | $5,500.00 |
| 38 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 3 | $16,000 | $12,000 | $22,400 | $12,000 | $10,500 |
| 39 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 1 | $23,000 | $15,000 | $26,000 | $15,000 | $15,000 |
| 40 | Headwall (CH - PW - S) (diameter= 30 in) (466-7118) | EACH | 1 | $9,500.00 | $11,000 | $21,870 | $11,000 | $7,500.00 |
| 41 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 1 | $13,000 | $22,000 | $23,900 | $15,000 | $15,000 |
| 42 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 1 | $28,000 | $33,000 | $26,000 | $23,000 | $19,000 |
| 43 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 2 | $43,000 | $60,000 | $42,600 | $47,000 | $55,000 |
| 44 | Headwall (CH-PW-S) (diameter 42 in) (mod) (466-7218) | EACH | 1 | $15,000 | $20,000 | $2,450.00 | $16,000 | $15,000 |
| 45 | Headwall (CH-PW-0)(diameter=36 in)(mod) (466-7221) | EACH | 1 | $15,000 | $19,000 | $4,200.00 | $15,000 | $14,000 |
| 46 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 6 | $1,450.00 | $850.00 | $1,475.00 | $780.00 | $800.00 |
| 47 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 138 | $1,600.00 | $900.00 | $1,410.00 | $850.00 | $900.00 |
| 48 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 8 | $2,100.00 | $1,300.00 | $2,000.00 | $1,300.00 | $2,000.00 |
| 49 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 68 | $2,500.00 | $1,500.00 | $1,885.00 | $1,500.00 | $2,500.00 |
| 50 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 2 | $4,000.00 | $5,500.00 | $4,540.00 | $5,300.00 | $4,000.00 |
| 51 | Set (type II) (36 in) (RCP) (6: 1) (C) (467-7367) | EACH | 2 | $6,000.00 | $8,000.00 | $6,100.00 | $7,900.00 | $5,000.00 |
| 52 | Clean existing culverts (480-7001) | EACH | 7 | $4,000.00 | $2,000.00 | $8,330.00 | $1,300.00 | $1,500.00 |
| 53 | Removing structure (set) (496-7004) | EACH | 183 | $600.00 | $300.00 | $540.00 | $110.00 | $550.00 |
| 54 | Removing structure (wingwall) (496-7005) | EACH | 1 | $3,100.00 | $2,000.00 | $2,620.00 | $1,100.00 | $1,200.00 |
| 55 | Removing structure (headwall) (496-7006) | EACH | 16 | $3,000.00 | $2,000.00 | $2,000.00 | $1,100.00 | $1,200.00 |
| 56 | Removing structure (pipe) (496-7007) | LF | 3,605 | $30.00 | $14.00 | $14.00 | $11.00 | $30.00 |
| 57 | Removing structure (box culvert) (496-7008) | LF | 18 | $300.00 | $200.00 | $1,300.00 | $80.00 | $450.00 |
| 58 | Mobilization (500-7001) | LS | 1 | $2,196,291 | $2,000,000 | $699,861 | $2,400,000 | $2,975,356 |
| 59 | Barricades, signs and traffic handling (502-7001) | MO | 30 | $17,000 | $3,000.00 | $13,700 | $11,940 | $48,061 |
| 60 | Portable changeable message sign (503-7002) | EACH | 16 | $10,000 | $5,000.00 | $3,000.00 | $10,000 | $1,000.00 |
| 61 | TMA (mobile operation) (505-7002) | HR | 560 | $50.00 | $80.00 | $1,000.00 | $60.00 | $65.00 |
| 62 | Rock filter dams (install) (type 2) (506-7002) | LF | 2,240 | $50.00 | $40.00 | $38.00 | $40.00 | $38.00 |
| 63 | Rock filter dams (remove) (506-7011) | LF | 2,240 | $15.00 | $5.00 | $15.50 | $11.00 | $11.00 |
| 64 | Construction exits (install) (type 1) (506-7020) | SY | 297 | $30.00 | $35.00 | $34.00 | $37.00 | $35.00 |
| 65 | Construction exits (remove) (506-7024) | SY | 297 | $10.00 | $6.00 | $13.50 | $12.00 | $11.00 |
| 66 | Temporary sediment control fence (install) (506-7039) | LF | 21,790 | $5.00 | $4.00 | $3.95 | $4.30 | $4.00 |
| 67 | Temporary sediment control fence (remove) (506-7041) | LF | 21,790 | $1.50 | $1.00 | $1.00 | $0.30 | $0.19 |
| 68 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,300 | $6.00 | $7.00 | $6.85 | $5.50 | $5.00 |
| 69 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,300 | $1.50 | $1.00 | $1.00 | $1.00 | $1.00 |
| 70 | Concrete curb (ribbon) (529-7028) | LF | 152 | $40.00 | $35.00 | $100.00 | $60.00 | $100.00 |
| 71 | Driveways (concrete) (530-7006) | SY | 95 | $120.00 | $135.00 | $170.00 | $130.00 | $250.00 |
| 72 | Driveways (ACP) (530-7010) | SY | 4,939 | $70.00 | $55.00 | $105.00 | $70.00 | $92.93 |
| 73 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 197,580 | $0.50 | $0.25 | $0.10 | $0.28 | $0.06 |
| 74 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 98,790 | $0.50 | $0.25 | $0.10 | $0.28 | $0.07 |
| 75 | Metal W-beam guard fence (timber post) (540-7001) | LF | 3,950 | $32.00 | $25.00 | $20.00 | $22.00 | $25.50 |
| 76 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 6 | $2,400.00 | $2,000.00 | $1,500.00 | $1,600.00 | $2,150.00 |
| 77 | Downstream anchor terminal section (540-7015) | EACH | 12 | $1,600.00 | $1,500.00 | $1,190.00 | $1,300.00 | $1,665.00 |
| 78 | Remove metal beam guard fence (542-7001) | LF | 2,828 | $9.00 | $3.00 | $2.00 | $2.20 | $3.00 |
| 79 | Guardrail end treatment (install) (544-7001) | EACH | 16 | $3,000.00 | $3,000.00 | $2,800.00 | $3,000.00 | $3,065.00 |
| 80 | Guardrail end treatment (remove) (544-7003) | EACH | 16 | $300.00 | $250.00 | $200.00 | $220.00 | $250.00 |
| 81 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 42 | $245.00 | $200.00 | $300.00 | $160.00 | $285.00 |
| 82 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 159 | $500.00 | $700.00 | $500.00 | $640.00 | $525.00 |
| 83 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $1,100.00 | $800.00 | $585.00 | $790.00 | $615.00 |
| 84 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 7 | $850.00 | $1,000.00 | $825.00 | $950.00 | $915.00 |
| 85 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 6 | $700.00 | $1,200.00 | $850.00 | $1,200.00 | $875.00 |
| 86 | Remove SM RD SN sup&AM (644-7073) | EACH | 176 | $110.00 | $120.00 | $75.00 | $110.00 | $115.00 |
| 87 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 26 | $35.00 | $30.00 | $18.00 | $25.00 | $35.50 |
| 88 | Install object marker assembly (OM-2Z)(WFLX)SRF(BI) (658-7061) | EACH | 27 | $80.00 | $100.00 | $75.00 | $40.00 | $185.00 |
| 89 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 24,705 | $1.50 | $0.25 | $0.20 | $0.22 | $0.33 |
| 90 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 159,610 | $1.00 | $0.20 | $0.18 | $0.20 | $0.31 |
| 91 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 7,478 | $1.00 | $1.50 | $1.00 | $1.00 | $1.50 |
| 92 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 3,465 | $3.00 | $1.30 | $1.20 | $1.25 | $0.82 |
| 93 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 14,390 | $1.70 | $1.05 | $0.95 | $1.00 | $0.95 |
| 94 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 92 | $13.00 | $10.00 | $7.00 | $7.50 | $6.98 |
| 95 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 14,795 | $1.00 | $0.82 | $0.75 | $0.80 | $0.82 |
| 96 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 196,420 | $1.00 | $0.70 | $0.60 | $0.65 | $0.68 |
| 97 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 227,948 | $1.00 | $0.70 | $0.60 | $0.65 | $0.68 |
| 98 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 16 | $240.00 | $300.00 | $215.00 | $230.00 | $225.00 |
| 99 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 14 | $350.00 | $350.00 | $275.00 | $290.00 | $315.00 |
| 100 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 14 | $300.00 | $325.00 | $235.00 | $250.00 | $235.00 |
| 101 | Reflectorized pavement marker type I-C (672-7002) | EACH | 1,320 | $6.00 | $6.00 | $5.00 | $5.50 | $6.08 |
| 102 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 6,246 | $7.00 | $5.00 | $4.00 | $4.30 | $6.08 |
| 103 | Bonding course (3007-7001) | GAL | 63,884 | $4.00 | $4.00 | $4.25 | $4.80 | $5.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.