TxDOT contract A00196020 bid tabulation
Surfacing/Roadway Restoration, IH 610 (South Wayside Drive to Scott Street). Let by Texas DOT on April 3, 2025, Harris, Houston District. 3 bids received; low bid $9,418,777 by Durwood Greene Construction Co., +5.0% against the engineer's estimate of $8,969,437.
- Owner
- Texas DOT
- Letting
- 03 APR 2025
- Pay items
- 43
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Durwood Greene Construction Co. | $9,418,777 | Low | +5.0% |
| 2 | Texas Materials Group, Inc. | $9,461,123 | 0.0% | +5.0% |
| 3 | Vulcan Materials Asphalt and Construction, LLC | $9,498,504 | +1.0% | +6.0% |
Engineer's estimate: $8,969,437.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Durwood Greene Construction Co. | 2. Texas Materials Group, Inc. | 3. Vulcan Materials Asphalt and Construction, LLC |
|---|---|---|---|---|---|---|---|
| 1 | D-GR HMA type D sac-B PG64-22 (341-7045) | TON | 8,781 | $110.00 | $150.00 | $146.75 | $130.00 |
| 2 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 18,495 | $180.00 | $205.00 | $210.00 | $187.00 |
| 3 | Plane & text asphalt concrete pavement(0" to 3") (354-7003) | SY | 53,173 | $5.00 | $3.50 | $3.95 | $3.35 |
| 4 | Plan & text concrete pavement(0" to 2") (354-7027) | SY | 3,604 | $15.00 | $25.00 | $16.50 | $36.00 |
| 5 | Full - depth repair CRCP (12") (361-7007) | CY | 2,009 | $1,400.00 | $1,050.00 | $1,475.00 | $1,425.00 |
| 6 | Mobilization (500-7001) | LS | 1 | $750,000 | $850,000 | $475,000 | $948,000 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $3,500.00 | $40,000 | $900.00 | $22,650 |
| 8 | Portable changeable message sign (503-7001) | DAY | 225 | $120.00 | $350.00 | $135.00 | $56.00 |
| 9 | TMA (stationary) (505-7001) | DAY | 366 | $250.00 | $350.00 | $275.00 | $251.00 |
| 10 | TMA (mobile operation) (505-7003) | DAY | 38 | $275.00 | $350.00 | $505.00 | $430.00 |
| 11 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 1,500 | $12.00 | $25.00 | $8.55 | $36.00 |
| 12 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 43,975 | $0.20 | $0.22 | $0.08 | $0.18 |
| 13 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 23,910 | $0.35 | $0.40 | $0.38 | $0.33 |
| 14 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 1,031 | $0.35 | $0.60 | $0.62 | $0.56 |
| 15 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 33,018 | $0.35 | $0.40 | $0.38 | $0.33 |
| 16 | Work zone pavement marking non-removing (W)12"(DOT) (662-7013) | LF | 408 | $1.70 | $1.40 | $1.40 | $1.28 |
| 17 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 1,394 | $2.00 | $1.40 | $1.40 | $1.28 |
| 18 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 4 | $150.00 | $100.00 | $97.23 | $89.00 |
| 19 | Work zone pavement marking non-removing (W)(entr gore) (662-7020) | EACH | 9 | $250.00 | $170.00 | $155.13 | $142.00 |
| 20 | Work zone pavement marking non-removing (W)(exit gore) (662-7021) | EACH | 7 | $250.00 | $375.00 | $309.16 | $283.00 |
| 21 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 4 | $95.00 | $100.00 | $97.23 | $89.00 |
| 22 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 33,301 | $0.35 | $0.40 | $0.36 | $0.33 |
| 23 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,846 | $2.00 | $3.00 | $0.60 | $2.90 |
| 24 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 1,665 | $2.00 | $3.00 | $0.76 | $3.24 |
| 25 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,439 | $1.10 | $2.00 | $1.61 | $1.47 |
| 26 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 1,394 | $3.25 | $3.50 | $2.91 | $2.66 |
| 27 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 4 | $245.00 | $175.00 | $163.87 | $150.00 |
| 28 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 4 | $250.00 | $230.00 | $218.49 | $200.00 |
| 29 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 7 | $400.00 | $400.00 | $382.36 | $350.00 |
| 30 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 7 | $725.00 | $575.00 | $540.76 | $495.00 |
| 31 | RE prof PM (W)6"(solid) raisd prof only (666-7279) | LF | 4,908 | $0.90 | $0.55 | $0.45 | $0.41 |
| 32 | RE prof PM (Y)6"(solid) raisd prof only (666-7280) | LF | 6,006 | $0.90 | $0.55 | $0.45 | $0.41 |
| 33 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 23,910 | $0.60 | $0.65 | $0.61 | $0.56 |
| 34 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 32,696 | $0.60 | $0.65 | $0.61 | $0.56 |
| 35 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 31,626 | $0.60 | $0.65 | $0.61 | $0.56 |
| 36 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,528 | $6.00 | $6.50 | $6.40 | $5.86 |
| 37 | Eliminating existing PM & markers (6") (677-7002) | LF | 10,812 | $1.50 | $0.45 | $0.47 | $0.43 |
| 38 | Eliminating existing PM & markers (12") (677-7006) | LF | 537 | $1.50 | $2.50 | $2.18 | $2.00 |
| 39 | Eliminating existing PM & markers (entr gore) (677-7016) | EACH | 2 | $400.00 | $130.00 | $109.25 | $100.00 |
| 40 | Eliminating existing PM & markers (exit gore) (677-7017) | EACH | 2 | $400.00 | $250.00 | $218.49 | $200.00 |
| 41 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 6,307 | $30.00 | $2.50 | $2.18 | $2.00 |
| 42 | Fiber reinforced polymer patching materials (721-7001) | LB | 1,000 | $20.00 | $19.00 | $16.40 | $16.55 |
| 43 | Underseal course (3006-7001) | GAL | 44,182 | $5.50 | $6.75 | $5.50 | $5.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.