TxDOT contract A00139797 bid tabulation
ACP OVERLAY, SH0035 (N. of 10th St to CR 691). Let by Texas DOT on March 5, 2025, Brazoria, Houston District. 6 bids received; low bid $1,892,569 by Environmental Allies, Inc., -7.5% against the engineer's estimate of $2,045,252.
- Owner
- Texas DOT
- Letting
- 05 MAR 2025
- Pay items
- 54
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Environmental Allies, Inc. | $1,892,569 | Low | -7.0% |
| 2 | Elite Kings Construction, LLC | $1,898,948 | 0.0% | -7.0% |
| 3 | Vulcan Materials Asphalt and Construction, LLC | $1,907,011 | +1.0% | -7.0% |
| 4 | Forde Construction Company, Inc. | $2,047,581 | +8.0% | 0.0% |
| 5 | Durwood Greene Construction Co. | $2,155,747 | +14% | +5.0% |
| 6 | Texas Materials Group, Inc. | $3,044,530 | +61% | +49% |
Engineer's estimate: $2,045,252.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Environmental Allies, Inc. | 2. Elite Kings Construction, LLC | 3. Vulcan Materials Asphalt and Construction, LLC | 4. Forde Construction Company, Inc. | 5. Durwood Greene Construction Co. | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 100 | $17.00 | $35.00 | $20.00 | $23.00 | $44.00 | $30.00 | $33.00 |
| 2 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 106.80 | $15.00 | $22.00 | $10.05 | $163.00 | $80.00 | $25.00 | $31.00 |
| 3 | Asphalt (AC-20-5TR) (316-7007) | GAL | 29,923 | $4.50 | $4.00 | $4.00 | $3.16 | $4.00 | $4.25 | $5.00 |
| 4 | Aggregate (type-PB or PL, GR-4)(sac-B) (316-7245) | CY | 125 | $200.00 | $260.00 | $205.00 | $670.00 | $550.00 | $440.00 | $1,100.00 |
| 5 | SP mixes SP-D sac-B PG76-22 (344-7065) | TON | 5,430 | $158.00 | $154.00 | $150.00 | $125.00 | $137.00 | $150.00 | $210.00 |
| 6 | Flexible pavement structure repair(14") (351-7013) | SY | 144 | $200.00 | $250.00 | $120.00 | $374.25 | $200.00 | $170.00 | $275.00 |
| 7 | Plane concrete pavement(0" to 1.5") (354-7065) | SY | 9,370 | $12.25 | $11.00 | $16.13 | $5.55 | $20.00 | $19.00 | $25.00 |
| 8 | Full - depth repair CRCP (10") (361-7005) | CY | 150 | $1,500.00 | $1,500.00 | $1,216.19 | $1,800.00 | $2,040.00 | $1,950.00 | $3,175.00 |
| 9 | Full - depth repair CRCP (13") (361-7008) | CY | 48 | $1,500.00 | $1,650.00 | $1,750.00 | $1,900.00 | $2,040.00 | $2,100.00 | $3,500.00 |
| 10 | Concrete structure repair (standard) (429-7009) | SF | 50 | $195.17 | $150.00 | $170.00 | $150.00 | $200.00 | $170.00 | $230.00 |
| 11 | Riprap (mow strip)(4 in) (432-7013) | CY | 17.60 | $792.74 | $900.00 | $600.00 | $1,136.00 | $1,070.00 | $1,400.00 | $2,100.00 |
| 12 | Adjusting manholes (479-7001) | EACH | 12 | $2,608.76 | $850.00 | $1,500.00 | $3,825.00 | $1,700.00 | $1,200.00 | $375.00 |
| 13 | Mobilization (500-7001) | LS | 1 | $170,575 | $100,000 | $25,000 | $183,000 | $75,000 | $150,000 | $150,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $10,000 | $1,750.00 | $15,000 | $6,050.00 | $13,000 | $5,000.00 | $7,100.00 |
| 15 | Portable changeable message sign (503-7001) | DAY | 146 | $157.84 | $120.00 | $200.00 | $56.00 | $150.00 | $250.00 | $170.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 80 | $450.00 | $235.00 | $350.00 | $336.00 | $250.00 | $350.00 | $320.00 |
| 17 | TMA (mobile operation) (505-7003) | DAY | 18 | $440.45 | $950.00 | $360.00 | $336.00 | $175.00 | $300.00 | $650.00 |
| 18 | Metal W-beam guard fence (timber post) (540-7001) | LF | 100 | $27.74 | $35.00 | $44.00 | $30.40 | $37.00 | $36.00 | $45.00 |
| 19 | Metal W-beam guard fence (steel post) (540-7002) | LF | 50 | $36.85 | $60.00 | $43.00 | $107.00 | $133.00 | $57.00 | $145.00 |
| 20 | Remove metal beam guard fence (542-7001) | LF | 125 | $3.73 | $6.00 | $4.00 | $3.50 | $6.00 | $10.00 | $8.00 |
| 21 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,414.93 | $3,500.00 | $2,800.00 | $3,350.00 | $4,900.00 | $3,750.00 | $5,000.00 |
| 22 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $354.27 | $275.00 | $1,500.00 | $500.00 | $610.00 | $300.00 | $380.00 |
| 23 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 175 | $16.50 | $27.00 | $19.20 | $12.00 | $12.50 | $14.00 | $16.00 |
| 24 | Electrical conductor (no.8) bare (620-7007) | LF | 175 | $2.30 | $6.00 | $2.41 | $1.95 | $2.00 | $2.50 | $5.00 |
| 25 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $1,500.00 | $4,000.00 | $1,831.00 | $1,400.00 | $1,450.00 | $1,600.00 | $1,520.00 |
| 26 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 16 | $43.48 | $35.00 | $40.45 | $31.00 | $12.00 | $35.00 | $53.00 |
| 27 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 5,160 | $1.90 | $0.65 | $2.00 | $0.35 | $0.40 | $0.38 | $1.00 |
| 28 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 3,000 | $0.57 | $0.55 | $2.00 | $0.35 | $0.40 | $0.38 | $1.00 |
| 29 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 1,285 | $0.87 | $0.75 | $1.20 | $0.70 | $0.75 | $0.75 | $1.10 |
| 30 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 615 | $2.00 | $2.00 | $2.21 | $1.50 | $1.55 | $2.00 | $2.50 |
| 31 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 670 | $6.15 | $5.00 | $9.00 | $3.00 | $3.10 | $5.00 | $4.75 |
| 32 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 5,160 | $0.57 | $0.65 | $0.79 | $0.35 | $0.40 | $0.38 | $1.00 |
| 33 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 40,592 | $0.56 | $0.50 | $0.72 | $0.35 | $0.40 | $0.38 | $1.00 |
| 34 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,285 | $2.03 | $1.75 | $1.50 | $1.00 | $1.05 | $1.20 | $1.00 |
| 35 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 615 | $3.88 | $4.00 | $4.51 | $3.00 | $3.10 | $3.50 | $4.75 |
| 36 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 670 | $10.21 | $10.00 | $11.96 | $6.00 | $6.20 | $7.00 | $10.00 |
| 37 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 5,160 | $4.19 | $1.50 | $1.36 | $1.25 | $1.30 | $1.50 | $2.00 |
| 38 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 5,160 | $0.52 | $1.00 | $1.04 | $0.60 | $0.62 | $0.64 | $1.00 |
| 39 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 3,000 | $1.00 | $1.00 | $1.23 | $0.60 | $0.62 | $0.64 | $1.00 |
| 40 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 5,160 | $0.77 | $1.00 | $1.06 | $0.60 | $0.62 | $0.64 | $1.00 |
| 41 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 40,592 | $0.53 | $0.80 | $1.27 | $0.60 | $0.62 | $0.64 | $1.00 |
| 42 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 38 | $274.37 | $300.00 | $250.00 | $250.00 | $258.00 | $275.00 | $400.00 |
| 43 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 12 | $343.84 | $400.00 | $250.00 | $350.00 | $360.00 | $375.00 | $530.00 |
| 44 | Reflectorized pavement marker type I-C (672-7002) | EACH | 130 | $7.95 | $6.75 | $9.00 | $6.00 | $6.20 | $7.00 | $10.00 |
| 45 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 450 | $7.82 | $6.75 | $7.26 | $6.00 | $6.20 | $7.00 | $10.00 |
| 46 | Eliminating existing PM & markers (plowable RPMS) (677-7031) | EACH | 600 | $6.00 | $2.00 | $1.00 | $10.00 | $10.30 | $10.00 | $16.00 |
| 47 | Fiber reinforced polymer patching materials (721-7001) | LB | 2,120 | $12.41 | $11.00 | $11.95 | $18.00 | $20.00 | $22.00 | $28.00 |
| 48 | Continuous grinding-concrete pavement (3017-7001) | SY | 4,305 | $10.00 | $11.50 | $10.00 | $15.86 | $16.00 | $17.50 | $23.00 |
| 49 | VIVDS prosr sys (install only) (6006-7009) | EACH | 4 | $1,300.00 | $950.00 | $3,885.00 | $750.00 | $770.00 | $850.00 | $302.00 |
| 50 | VIVDS cam assy (install only) (6006-7010) | EACH | 4 | $750.00 | $950.00 | $1,012.00 | $950.00 | $978.00 | $1,100.00 | $910.00 |
| 51 | VIVDS cabling (install only) (6006-7012) | LF | 460 | $2.22 | $13.00 | $2.55 | $1.85 | $2.00 | $2.50 | $4.00 |
| 52 | VIVDS pros cabinet equip (remove) (6006-7017) | EACH | 4 | $800.00 | $550.00 | $4.00 | $110.00 | $113.00 | $140.00 | $3.00 |
| 53 | VIVDS cam assy (remove) (6006-7018) | EACH | 24 | $500.00 | $550.00 | $80.00 | $150.00 | $155.00 | $180.00 | $3.00 |
| 54 | VIVDS cabling (remove) (6006-7020) | LF | 5,330 | $0.15 | $1.15 | $6.00 | $0.55 | $0.60 | $0.70 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.