TxDOT letting results, April 8, 2025
12 contracts let by Texas DOT on April 8, 2025, $3,298,868 in low bids, a median of 3.5 bidders per contract. On the 12 with an engineer's estimate, the low bid came in under it 10 times; median low bid -13% against the estimate.
- Owner
- Texas DOT
- Contracts
- 12
- Low bids, total
- $3,298,868
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00213095 | TRAFFIC CONTROL SERVICES, US0090 (Various Locations to Various Locations) | El Paso District | 1 | Apache Barricade & Sign | $1,049,000 | +82% | TxDOT | ||
| A00214509 | AGGREGATE, SH0150 (Various locations in the Livingston Area to Various locations in the Livingston Area) | Lufkin District | 1 | Arcosa LWS, LLC | $610,000 | -1.0% | TxDOT | ||
| A00214411 | REFLECTIVE PAVEMENT MARKINGS (LONG LINE), IH0020 (VARIOUS to VARIOUS) | Odessa District | 6 | Vizcaino, L.P. | $462,533 | $497,350 | +8.0% | -3.0% | TxDOT |
| A00213817 | TREE REMOVAL, SH0036 (Various to Various) | Bryan District | 3 | Icos Management, LLC | $428,730 | $441,750 | +3.0% | -18% | TxDOT |
| A00214595 | WINTER WEATHER MATERIAL, US0190 (Various to Various) | Bryan District | 2 | Touchstone Resources, LLC | $313,200 | $338,400 | +8.0% | +1.0% | TxDOT |
| A00214579 | EMULSION, IH0045 (Various to Various) | Bryan District | 4 | Wright Asphalt Products Company LLC | $96,000 | $106,400 | +11% | -19% | TxDOT |
| A00214566 | CUTBACK, SH0036 (Various to Various) | Bryan District | 3 | Martin Resource Management Corporation | $84,240 | $85,200 | +1.0% | -12% | TxDOT |
| A00214586 | ROCK/RIPRAP, IH0045 (Various to Various) | Bryan District | 5 | Southern Sourcing Solutions, LLC | $80,276 | $99,800 | +24% | -33% | TxDOT |
| A00214412 | PICNIC AREA MAINTENANCE, IH0020 (MM 24 to MM 25) | Odessa District | 2 | C&C Sosa Company, LLC | $72,640 | $166,000 | +129% | -4.0% | TxDOT |
| A00214408 | FLEXIBLE BASE, BI0010G (VARIOUS to VARIOUS) | Odessa District | 4 | Touchstone Resources, LLC | $42,000 | $52,450 | +25% | -14% | TxDOT |
| A00214410 | FLEXIBLE BASE, SL0338 (VARIOUS to VARIOUS) | Odessa District | 4 | Touchstone Resources, LLC | $30,250 | $36,472 | +21% | -21% | TxDOT |
| A00214409 | FLEXIBLE BASE, IH0020 (VARIOUS to VARIOUS) | Odessa District | 5 | Touchstone Resources, LLC | $30,000 | $31,200 | +4.0% | -29% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.