TxDOT contract A00191310 bid tabulation

Hazard Elimination & Safety, Various (Various locations in to the Lubbock District). Let by Texas DOT on March 5, 2025, Lubbock, Lubbock District. 5 bids received; low bid $1,428,552 by The Confidence Group, Inc, -15% against the engineer's estimate of $1,683,736.

Owner
Texas DOT
Letting
05 MAR 2025
Pay items
65
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1The Confidence Group, Inc$1,428,552Low-15%
2L&L Company$1,851,166+30%+10%
3TRP Infrastructure Services, LLC$1,854,883+30%+10%
4Pmi Pavement Marking, LLC$2,333,012+63%+39%
5Stripe-A-Zone, LLC$2,791,921+95%+66%
TxDOT contract A00191310: bids by rank

Engineer's estimate: $1,683,736.

Bid tabulation

LinePay itemUnitQuantityEstimate1. The Confidence Group, Inc2. L&L Company3. TRP Infrastructure Services, LLC4. Pmi Pavement Marking, LLC5. Stripe-A-Zone, LLC
1Mobilization (500-7001)LS1$5,000.00$0.01$200,000$124,000$120,286$325,000
2Barricades, signs and traffic handling (502-7001)MO6$1,000.00$0.17$1.00$2,500.00$7,500.00$1,000.00
3TMA (mobile operation) (505-7003)DAY540$10.00$1.00$1.00$160.00$1.00$100.00
4Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132)EACH20$500.00$56.65$400.00$190.00$153.85$800.00
5Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF69,735$0.70$0.65$0.80$0.77$0.70$0.95
6Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF21,800$0.80$0.75$0.80$0.80$0.93$0.98
7Reflectorized pavement marking type III (W)(8")(solid) (666-7239)LF24,120$0.90$0.91$1.00$1.60$1.21$1.10
8Reflectorized pavement marking type III (W)(12")(solid) (666-7242)LF4,590$3.00$1.14$2.00$4.95$3.97$5.95
9Reflectorized pavement marking type III (W)(12")(DOT) (666-7243)LF2,740$3.00$1.14$3.00$4.95$4.35$4.25
10Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF70,095$0.70$0.75$0.80$0.77$0.70$0.95
11Prefabricated PM type B (W)(6")(solid) (668-7009)LF260$9.50$8.98$0.80$7.00$5.65$8.95
12Prefabricated PM type B (W)(6")(broken)contrast (668-7012)LF3,830$12.00$8.98$12.00$10.75$9.92$14.50
13Prefabricated PM type B (W)(8")(solid) (668-7014)LF5,690$8.00$10.86$8.00$9.45$7.65$10.25
14Prefabricated PM type B (W)(8")(DOT) (668-7015)LF114$10.00$10.86$10.00$14.75$8.12$13.25
15Prefabricated PM type B (W)(8")(lane drop) (668-7016)LF40$20.00$11.86$20.00$11.25$8.04$13.25
16Prefabricated PM type B (W)(12")(solid) (668-7017)LF4,730$12.00$17.08$12.00$14.25$12.63$14.25
17Prefabricated PM type B (W)(24")(solid) (668-7021)LF1,308$21.00$20.00$21.00$29.00$23.64$23.50
18Prefabricated PM type B (W)(24")(solid)contrast (668-7022)LF1,106$24.00$28.00$30.00$37.00$28.03$33.75
19Prefabricated PM type B (W)(RR crossing) (668-7035)EACH2$500.00$720.00$3,000.00$2,200.00$550.13$1,500.00
20Prefabricated PM type B (W)(36")(yld tri) (668-7038)EACH78$60.00$21.39$60.00$85.00$121.44$100.00
21Prefabricated PM type B (Y)(6")(broken) (668-7049)LF40$7.00$6.80$8.00$7.95$5.74$10.25
22Prefabricated PM type B (Y)(6")(solid) (668-7051)LF4,900$7.00$6.80$7.00$7.00$5.50$8.95
23Prefabricated PM type B (Y)(12")(solid) (668-7054)LF980$20.00$12.12$13.00$14.25$12.23$14.25
24Prefabricated PM type B (W)(word)contrast (668-7060)EACH68$1,500.00$462.26$3,000.00$642.00$4,646.25$4,500.00
25Prefabricated PM type B (W)(arrow)contrast (668-7061)EACH83$1,200.00$461.07$1,500.00$603.00$2,726.76$2,750.00
26Prefabricated PM type B(W)(LN reduct arrw)CNTST (668-7062)EACH4$1,500.00$727.18$2,500.00$1,400.00$3,812.78$3,700.00
27Prefabricated PM type B (W)(double arrw)CNTST (668-7063)EACH22$1,700.00$589.92$2,500.00$925.00$3,673.27$3,700.00
28Prefabricated PM type B (W)(uturn arrow)CNTST (668-7064)EACH4$1,700.00$376.95$2,500.00$1,600.00$833.26$2,600.00
29Prefabricated PM type B (multi)(shield) (668-7071)EACH29$4,000.00$452.87$3,000.00$5,200.00$7,466.19$10,500
30Prefabricated PM type C (W)(6")(broken) (668-7077)LF1,570$5.50$5.75$7.00$4.00$5.07$4.75
31Prefabricated PM type C (W)(6")(solid) (668-7080)LF100$7.00$5.75$7.00$2.65$4.65$5.25
32Prefabricated PM type C (W)(8")(DOT) (668-7082)LF640$10.00$6.86$8.00$5.75$6.90$6.95
33Prefabricated PM type C (W)(8")(lane drop) (668-7083)LF80$14.00$6.86$10.00$4.55$5.74$7.95
34Prefabricated PM type C (W)(8")(solid) (668-7084)LF3,095$10.00$6.86$6.00$3.60$5.50$6.95
35Prefabricated PM type C (W)(12")(solid) (668-7087)LF190$14.00$17.08$7.00$5.65$6.75$10.25
36Prefabricated PM type C (W)(18")(solid) (668-7088)LF1,318$10.00$32.73$10.00$8.00$8.50$12.50
37Prefabricated PM type C (W)(24")(solid) (668-7089)LF10,004$15.00$27.19$14.00$10.75$12.38$14.95
38Prefabricated PM type C (W)(24")(solid)contrast (668-7090)LF968$35.00$37.48$20.00$12.25$14.64$22.50
39Prefabricated PM type C (W)(arrow) (668-7091)EACH154$200.00$201.24$200.00$204.00$170.08$250.00
40Prefabricated PM type C (W)(arrow)contrast (668-7092)EACH35$550.00$285.54$300.00$301.00$239.15$450.00
41Prefabricated PM type C (W)(double arrow) (668-7093)EACH19$350.00$303.87$350.00$327.00$362.98$550.00
42Prefabricated PM type C (W)(double arrow)contrast (668-7094)EACH13$750.00$352.45$450.00$430.00$422.36$595.00
43Prefabricated PM type C (W)(word) (668-7103)EACH28$250.00$257.41$400.00$298.00$251.29$295.00
44Prefabricated PM type C (W)(RR crossing) (668-7108)EACH16$250.00$560.25$550.00$879.00$551.36$500.00
45Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH2,356$35.00$71.25$30.00$67.00$47.98$40.00
46Prefabricated PM type C (Y)(6")(broken) (668-7121)LF120$5.50$5.75$8.00$4.10$5.08$4.75
47Prefabricated PM type C (Y)(6")(solid) (668-7123)LF16,934$8.00$5.75$5.00$2.75$4.67$4.00
48Prefabricated PM type C (Y)(8")(solid) (668-7124)LF1,720$10.00$6.24$6.00$3.75$5.50$7.95
49Prefabricated PM type C (Y)(12")(solid) (668-7125)LF310$14.00$7.50$10.00$5.85$6.62$10.25
50Eliminating existing PM & markers (4") (677-7001)LF169,094$0.40$0.26$0.45$0.45$0.52$0.95
51Eliminating existing PM & markers (6") (677-7002)LF4,170$0.60$0.42$0.60$0.45$0.62$0.95
52Eliminating existing PM & markers (8") (677-7004)LF35,609$0.80$0.80$0.80$0.90$0.72$1.05
53Eliminating existing PM & markers (10") (677-7005)LF1,480$3.00$1.02$1.75$2.15$1.59$1.50
54Eliminating existing PM & markers (12") (677-7006)LF19,292$2.00$0.82$2.00$2.15$2.04$2.50
55Eliminating existing PM & markers (18") (677-7007)LF1,078$3.00$1.11$2.50$100.00$2.40$3.25
56Eliminating existing PM & markers (24") (677-7008)LF8,257$4.00$1.30$4.00$3.00$4.71$4.00
57Eliminating existing PM & markers (arrow) (677-7009)EACH266$100.00$7.52$50.00$55.00$211.85$100.00
58Eliminating existing PM & markers (double arrow) (677-7010)EACH47$125.00$4.30$75.00$75.00$242.12$125.00
59Eliminating existing PM & markers (uturn arrow) (677-7012)EACH3$200.00$8.50$120.00$333.00$282.47$200.00
60Eliminating existing PM & markers (number) (677-7014)EACH9$240.00$8.50$100.00$100.00$282.87$200.00
61Eliminating existing PM & markers (word) (677-7015)EACH22$200.00$9.50$100.00$65.00$200.98$200.00
62Eliminating existing PM & markers (RR crossing) (677-7019)EACH16$300.00$16.04$200.00$275.00$564.94$300.00
63Eliminating existing PM & markers (med nose) (677-7021)EACH14$200.00$18.00$100.00$250.00$196.91$200.00
64Eliminating existing PM & markers (shield) (677-7022)EACH6$300.00$23.06$300.00$250.00$706.18$500.00
65Eliminating existing PM & markers (36")(yld tri) (677-7024)EACH2,396$30.00$21.56$20.00$35.00$55.93$30.00
TxDOT contract A00191310: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy