Aranda Brothers Construction Co., Inc.: TxDOT bid record
Aranda Brothers Construction Co., Inc. submitted 32 bids on Texas DOT contracts in the data, from 13 MAR 2020 to 08 JAN 2025, and was the low bidder on 4 of them (13%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $3,801,137
- Latest bid
- 08 JAN 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 15 | 3 | 20% |
| 2021 | 7 | 1 | 14% |
| 2022 | 5 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
| 2025 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 17 | 4 | 24% |
| Fort Worth District | 5 | 0 | 0% |
| Yoakum District | 5 | 0 | 0% |
| Dallas District | 2 | 0 | 0% |
| Pharr District | 2 | 0 | 0% |
| Beaumont District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Excavation (roadway) | 110-7001 | CY | 24 | 9 (38%) | $13.25 | $20.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 23 | 9 (39%) | $3,100.00 | $3,245.00 |
| Reinforced concrete slab (slab beam) | 422-7007 | SF | 9 | 9 (100%) | $16.75 | $26.00 |
| Cem stabil BKFL | 400-7010 | CY | 22 | 8 (36%) | $82.50 | $200.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 18 | 7 (39%) | $530.00 | $710.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 17 | 7 (41%) | $650.00 | $643.00 |
| Removing structure (pipe) | 496-7007 | LF | 12 | 7 (58%) | $10.00 | $24.00 |
| Broadcast seed (temporary) (warm) | 164-6009 | SY | 11 | 7 (64%) | $0.50 | $0.30 |
| Driveways (ACP) | 530-7010 | SY | 9 | 6 (67%) | $45.00 | $60.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 26 | 5 (19%) | $1.00 | $1.00 |
| Rock filter dams (remove) | 506-7011 | LF | 15 | 5 (33%) | $10.00 | $12.00 |
| Removing concrete (driveways) | 104-7011 | SY | 9 | 5 (56%) | $10.00 | $21.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Isi Contracting, Inc. | 14 | 7 of 14 |
| FNH Construction, LLC | 11 | 2 of 11 |
| Main Lane Industries LTD. | 10 | 7 of 10 |
| Ragle Construction, Inc. | 10 | 6 of 10 |
| Trevway, Inc. | 8 | 6 of 8 |
| Triple B Services LLP | 7 | 3 of 7 |
| Ed Bell Construction Company | 7 | 5 of 7 |
| Earth Builders, L.P. | 7 | 5 of 7 |
| Hodges and Son Construction Company, Inc. | 7 | 6 of 7 |
| B & MS Construction, Inc. | 6 | 1 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 JAN 2025 | A00181043 | Pharr District | Bridge Replacement, 1 MILE RD W (Mile 1 West Rd., NBI #: 211090AA0824001 to @ Main Supply Channel) | 3 of 4 | $3,030,168 | +19% |
| 07 JAN 2025 | A00188286 | Yoakum District | Bridge Replacement, FRANTZ RD (AT SAN BERNARD RIVER to STR# AA52-06-001 (FRANTZ RD)) | 4 of 9 | $1,999,363 | +15% |
| 06 MAR 2024 | 03243223 | Yoakum District | CR Bridge replacement from AT WEST SANDY CREEK to STR # AA02-22-001 (CR 221) | 4 of 8 | $2,900,849 | +5.0% |
| 06 MAR 2024 | 03243228 | Yoakum District | BU 59-R Bridge replacement from AT COLORADO RIVER RELIEF to STR #89-10-037 | 6 of 6 | $1,879,751 | +50% |
| 06 DEC 2023 | 12233212 | Houston District | FM 517 Highway improvement from FM 646 to IH 45 | 4 of 6 | $644,666 | +24% |
| 02 DEC 2022 | 12223219 | Yoakum District | CR Bridge replacement from AT WERTZNER CREEK to STR#AA01-79-001(HALSTEDT RD) | 6 of 9 | $1,988,834 | +15% |
| 03 NOV 2022 | 11223218 | Pharr District | FM 492 Bridge replacement from .25 MI N OF BUS 83 to @ EDINBURG MAIN CANAL | 5 of 5 | $3,151,699 | +64% |
| 03 NOV 2022 | 11223224 | Yoakum District | CR Bridge replacement from AT PIN OAK BRANCH to STR#AA03-80-001(TEINERT RD) | 3 of 8 | $1,394,996 | +4.0% |
| 04 AUG 2022 | 08223255 | Houston District | VA Construct new 5 ft sidewalks along city owned rds from VARIOUS LOCATIONS IN SOUTH HOUSTON | 3 of 9 | $1,232,234 | +11% |
| 30 JUN 2022 | 06223625 | Houston District | CR Bridge replacement from CR 144 AT AMERICAN CANAL | 3 of 3 | $3,939,754 | +15% |
| 12 OCT 2021 | 10211202 | Houston District | US0290 Bridge replacement from US 290 AT HEGAR ROAD to US 290 AT HEGAR ROAD | 5 of 5 | $406,253 | +50% |
| 05 AUG 2021 | 08213259 | Fort Worth District | CS Bridge replacement from KNIGHT RD. @ BRANCH OF ROCK CREEK | 4 of 4 | $1,333,265 | +45% |
| 05 AUG 2021 | 08213269 | Houston District | CS Replace bridge and approaches from LEE RD AT HCFCD DITCH | 1 of 2 | $599,801 | Low, 15% under the second |
| 04 AUG 2021 | 08213036 | Fort Worth District | SH 180 Construct pedestrian infrastructure from N. KENTUCKY AVE to BEACH ST. | 3 of 7 | $1,842,123 | +11% |
| 02 JUL 2021 | 07213243 | Houston District | CS Replace bridge and approaches from MCFARLAND RD AT DRAINAGE DITCH | 2 of 6 | $480,316 | +1.0% |
| 01 JUL 2021 | 07213044 | Houston District | CR Replace bridge and approaches from WILPITZ ROAD to AT BESSIES CREEK | 3 of 10 | $671,332 | +20% |
| 05 FEB 2021 | 02213211 | Houston District | FM 518 Construct curb ramps and signal improvements from FM 2351 to WHISPERING PINES AVE | 4 of 9 | $2,914,820 | +5.0% |
| 02 DEC 2020 | 12203015 | Dallas District | FM 66 Replace bridge and approaches from AT COFFEE BRANCH AND to MESQUITE BRANCH. | 15 of 16 | $3,579,286 | +44% |
| 05 NOV 2020 | 11203230 | Dallas District | CR Replace bridge and approaches from AT SOUTH AND NORTH DRAW | 12 of 14 | $1,203,760 | +43% |
| 04 NOV 2020 | 11203013 | Fort Worth District | BU 287P Construct pedestrian infrastructure from EAST ROSEDALE ST to EAST LOOP IH 820 FRONTAGE RD | 3 of 8 | $6,310,270 | +11% |
| 01 OCT 2020 | 10203015 | Houston District | VA Sidewalk and ada ramp construction from FARR ST: WALLER ST TO S OF TAYLOR S to WALLER ST: FM 362 TO FARR ST | 1 of 9 | $877,513 | Low, 5.0% under the second |
| 04 SEP 2020 | 09203218 | Houston District | FM 1488 Intersection improvements from AT IH 45 | 6 of 8 | $1,448,548 | +32% |
| 04 SEP 2020 | 09203224 | Houston District | IH 69 Prop. rt tn ln at w. clayton & u- turn at bf 1960 from WILL CLAYTON PARKWAY (EB) to BF 1960 | 2 of 8 | $445,994 | +13% |
| 03 SEP 2020 | 09203030 | Houston District | FM 2759 Construct noise barrier from MIDDLE BAYOU TO SANSBURY BLVD | 13 of 13 | $2,518,347 | +96% |
| 06 AUG 2020 | 08203252 | Fort Worth District | CR Bridge replacement from BRIAR CREEK to ON LIBERTY SCHOOL RD | 8 of 9 | $817,079 | +58% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.