Triple B Services LLP: TxDOT bid record
Triple B Services LLP submitted 28 bids on Texas DOT contracts in the data, from 08 APR 2020 to 08 MAR 2023, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $0
- Latest bid
- 08 MAR 2023
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 16 | 0 | 0% |
| 2021 | 9 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 22 | 0 | 0% |
| Beaumont District | 5 | 0 | 0% |
| Bryan District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 28 | 9 (32%) | $2,500.00 | $5,000.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 14 | 6 (43%) | $72.50 | $110.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 17 | 5 (29%) | $1.00 | $1.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 15 | 4 (27%) | $1.20 | $1.40 |
| Rock filter dams (remove) | 506-7011 | LF | 14 | 4 (29%) | $13.00 | $12.00 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 13 | 4 (31%) | $0.03 | $0.18 |
| Pedestrian detect push button (APS) | 688-7001 | EACH | 11 | 4 (36%) | $750.00 | $950.00 |
| Removing concrete (curb) | 104-7016 | LF | 10 | 4 (40%) | $3.83 | $10.00 |
| Trench excavation protection | 402-7001 | LF | 7 | 4 (57%) | $1.00 | $10.00 |
| Excavation (roadway) | 110-7001 | CY | 22 | 3 (14%) | $16.62 | $20.00 |
| Block sodding | 162-7002 | SY | 22 | 3 (14%) | $4.75 | $6.20 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 19 | 3 (16%) | $500.00 | $710.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Isi Contracting, Inc. | 18 | 12 of 18 |
| Main Lane Industries LTD. | 17 | 12 of 17 |
| Angel Brothers Holdings Corp. | 11 | 7 of 11 |
| Harper Brothers Construction LLC | 11 | 6 of 11 |
| FNH Construction, LLC | 10 | 2 of 10 |
| Ragle Construction, Inc. | 10 | 7 of 10 |
| Ser Construction Partners, LLC | 9 | 7 of 9 |
| James Construction Group, LLC | 8 | 8 of 8 |
| Aranda Brothers Construction Co., Inc. | 7 | 4 of 7 |
| Lindsey Construction, Inc. | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAR 2023 | 03233238 | Houston District | US 290 Drainage improvements from AT HEGAR ROAD AND FIELD STORE ROAD | 3 of 9 | $672,879 | +58% |
| 04 AUG 2022 | 08223255 | Houston District | VA Construct new 5 ft sidewalks along city owned rds from VARIOUS LOCATIONS IN SOUTH HOUSTON | 9 of 9 | $1,926,000 | +74% |
| 03 MAR 2022 | 03223004 | Houston District | FM 1960 Intersection improvements from AT ELDRIDGE PARKWAY | 5 of 8 | $16,884,255 | +15% |
| 07 OCT 2021 | 10214015 | Houston District | SH0288 Remove and replace existing pavement from AT CR 220 | 3 of 3 | $1,141,000 | +46% |
| 05 AUG 2021 | 08213210 | Beaumont District | US 90 Hazard elimination & safety from AT FM 1413 | 8 of 9 | $33,834,999 | +36% |
| 04 AUG 2021 | 08213010 | Houston District | FM 1097 Reconstruct & widen from 2 to 4 lanes from WEST OF BLUEBERRY HILLS to LAKE CONROE HILLS | 4 of 7 | $17,894,747 | +11% |
| 04 AUG 2021 | 08213016 | Houston District | SH 36 Widen to 4-lane divided rural from 0.5 MI S OF THE BRAZOS RIVER to FM 1495 | 4 of 4 | $11,349,000 | +27% |
| 01 JUL 2021 | 07213004 | Houston District | SH 105 Highway improvement from FM 2854 to IH 45 | 5 of 7 | $11,888,644 | +21% |
| 04 JUN 2021 | 06213224 | Houston District | SH 225 Reconstruct richey and pasadena blvd intersection from N. ALLEN-GENOA RD to PASADENA BLVD | 2 of 4 | $1,987,367 | +16% |
| 05 MAR 2021 | 03213225 | Houston District | PR 72 State park improvements from WEST OF PILANT SLOUGH | 2 of 4 | $455,303 | +18% |
| 05 FEB 2021 | 02213211 | Houston District | FM 518 Construct curb ramps and signal improvements from FM 2351 to WHISPERING PINES AVE | 9 of 9 | $3,752,018 | +35% |
| 05 FEB 2021 | 02213218 | Bryan District | FM 2821 Intersection improvements, rt & lt turn lanes from AT ROSENWALL ROAD | 8 of 10 | $2,834,589 | +34% |
| 04 NOV 2020 | 11203008 | Houston District | CS Reconstruct roadway from BUFFALO SPEEDWAY; BISSONNET to HOLCOMBE | 7 of 9 | $28,576,669 | +23% |
| 04 SEP 2020 | 09203215 | Houston District | US 290 Construct u-turn from EAST OF FM 362 to WEST OF FM 362 | 10 of 12 | $6,391,354 | +39% |
| 04 SEP 2020 | 09203218 | Houston District | FM 1488 Intersection improvements from AT IH 45 | 3 of 8 | $1,255,535 | +14% |
| 04 SEP 2020 | 09203224 | Houston District | IH 69 Prop. rt tn ln at w. clayton & u- turn at bf 1960 from WILL CLAYTON PARKWAY (EB) to BF 1960 | 4 of 8 | $488,888 | +23% |
| 03 SEP 2020 | 09203012 | Houston District | FM 1314 Construct drainage culverts&replace concrete pvmn from 0.125 MILES SOUTH OF CALHOUN RD to 0.528 MILES SOUTH OF CALHOUN RD | 12 of 13 | $5,424,887 | +61% |
| 06 AUG 2020 | 08203253 | Beaumont District | SH 146 Sft- safety improvement projects from IH 10 to FM 1405 | 5 of 5 | $1,898,371 | +70% |
| 05 AUG 2020 | 08203011 | Beaumont District | FM 565 Reconstruct and realign existing roadway from 0.305 MI WEST OF FM 2354 to 0.018 MI EAST OF FM 1405 | 3 of 6 | $8,232,718 | +22% |
| 05 AUG 2020 | 08203040 | Houston District | VA Construct turn lanes on various roads from VARIOUS LOCATIONS | 6 of 6 | $2,018,934 | +26% |
| 05 AUG 2020 | 08203058 | Beaumont District | CR Bridge from AT GAYLOR CREEK 1.1 MI NE | 4 of 5 | $988,323 | +27% |
| 08 JUL 2020 | 07203005 | Houston District | FM 1488 Widening of a non-freeway from WALLER COUNTY LINE to FM 1774 IN MAGNOLIA | 5 of 7 | $33,159,921 | +11% |
| 04 JUN 2020 | 06203010 | Houston District | FM 2218 Widen from 2 lanes to 4-lane divided from SH 36 to IH 69 | 8 of 10 | $44,299,212 | +21% |
| 08 MAY 2020 | 05203205 | Houston District | CS Widening to a 4-lane divided roadway from EAST OF BELTWAY 8 to EAST OF TALLOWOOD ROAD | 4 of 7 | $22,835,397 | +12% |
| 08 MAY 2020 | 05203226 | Houston District | FM 518 Construction of a 10' wide shared used path from FM 270 to SOUTH SHORE BOULEVARD & FM 518 | 2 of 11 | $2,326,434 | +8.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.