Sefbo Pipeline Bridge, Incorporated: TxDOT bid record
Sefbo Pipeline Bridge, Incorporated submitted 37 bids on Texas DOT contracts in the data, from 02 DEC 2020 to 28 JUN 2023, and was the low bidder on 6 of them (16%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,354,734
- Latest bid
- 28 JUN 2023
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 1 | 20% |
| 2021 | 28 | 5 | 18% |
| 2023 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 11 | 0 | 0% |
| Brownwood District | 5 | 2 | 40% |
| San Antonio District | 5 | 0 | 0% |
| Tyler District | 3 | 2 | 67% |
| Yoakum District | 3 | 2 | 67% |
| Austin District | 3 | 0 | 0% |
| Bryan District | 3 | 0 | 0% |
| Dallas District | 2 | 0 | 0% |
| Childress District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 36 | 7 (19%) | $3,250.00 | $5,000.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 17 | 6 (35%) | $2,436.00 | $3,245.00 |
| Excavation (roadway) | 110-7001 | CY | 14 | 5 (36%) | $12.53 | $20.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 11 | 5 (45%) | $1,402.50 | $2,140.00 |
| Conduit (PVC) (schedule 80) (2") (bore) | 618-7055 | LF | 8 | 5 (63%) | $13.72 | $27.00 |
| Removing traffic signals | 680-7004 | EACH | 7 | 5 (71%) | $2,991.04 | $5,000.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 22 | 4 (18%) | $1.54 | $1.00 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 8 | 4 (50%) | $6.34 | $8.00 |
| Conduit (PVC) (schedule 80) (2") | 618-7054 | LF | 7 | 4 (57%) | $9.98 | $15.34 |
| Curb ramps (type 7) | 531-7010 | EACH | 5 | 4 (80%) | $1,240.22 | $2,500.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 12 | 3 (25%) | $22.91 | $5.00 |
| Ground box type D (162922)W/apron | 624-7008 | EACH | 10 | 3 (30%) | $1,029.99 | $1,441.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 10 | 2 of 10 |
| 3LW Civil LLC | 7 | 2 of 7 |
| FNH Construction, LLC | 6 | 1 of 6 |
| Third Coast Services LLC | 6 | 2 of 6 |
| Highway 19 Construction LLC | 5 | 1 of 5 |
| Altus Construction LLC | 5 | 2 of 5 |
| Citylynx, Inc. | 5 | 4 of 5 |
| Traf-Tex, Inc. | 5 | 4 of 5 |
| Isi Contracting, Inc. | 5 | 2 of 5 |
| SB Contractors LLC | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 JUN 2023 | 06233641 | Houston District | CS Bridge replacement from BACA STREET AT HCFCD DITCH | 3 of 3 | $935,820 | +14% |
| 02 JUN 2023 | 06233246 | Bryan District | CR Bridge replacement from ON BOYD RD to AT POOLES CREEK | 2 of 3 | $707,229 | +6.0% |
| 01 JUN 2023 | 06233036 | Bryan District | CS Bridge replacement from ON CR 325 (LOCAL - TRINITY STREET) to AT TOWN BRANCH | 2 of 5 | $809,715 | +25% |
| 01 JUN 2023 | 06233037 | Bryan District | CR Bridge replacement from ON CR 147 to AT BIG ELM CREEK | 3 of 6 | $973,602 | +26% |
| 06 MAY 2021 | 05213225 | San Antonio District | RM 32 Bridge replacement from AT CARPER CREEK | 6 of 11 | $1,405,494 | +35% |
| 05 MAY 2021 | 05213022 | Dallas District | FM 637 Bridge replacement from AT DRAW (0.3 MI NW OF IH 35E) | 6 of 9 | $3,008,643 | +11% |
| 05 MAY 2021 | 05213034 | San Antonio District | CR Bridge replacement from CR 545 @ BRIER BRANCH CREEK | 11 of 11 | $771,911 | +84% |
| 08 APR 2021 | 04213214 | Houston District | SL 8 Landscape development from NORTH GARDEN STREET to HOLLISTER ROAD | 4 of 5 | $6,105,186 | +63% |
| 08 APR 2021 | 04213220 | Yoakum District | CR Bridge replacement from AT TINSLEY CREEK to STR # AA03-84-001(CR 384) | 1 of 12 | $1,049,085 | Low, 3.0% under the second |
| 08 APR 2021 | 04213221 | Brownwood District | SH 36 Improve guardrail to design standards, s.e.t.'s from 0.003 MI. W. OF E MILLS ST IN to COMANCHE C/L, ETC. | 2 of 6 | $2,417,401 | +15% |
| 08 APR 2021 | 04213225 | San Antonio District | VA Traffic signal improvements from DISTRICTWIDE TRAFFIC CNTRL FY 2021 | 4 of 4 | $2,142,584 | +33% |
| 08 APR 2021 | 04213228 | San Antonio District | VA Highway improvement from VARIOUS LOCATIONS DISTRICTWIDE | 5 of 5 | $2,027,672 | +121% |
| 08 APR 2021 | 04213231 | Brownwood District | US 377 Safety treat fixed objects & rumble strips from FM 45 to MCCULLOCH C/L | 7 of 7 | $1,362,304 | +45% |
| 08 APR 2021 | 04213232 | Austin District | SL 1 Construction of new ramp & intersection improvemt from DUVAL ROAD to 0.8 MILES WEST OF DUVAL ROAD | 5 of 5 | $2,220,234 | +46% |
| 07 APR 2021 | 04213004 | Houston District | SH 99 Landscape development from BOUDREAUX to SPRING CREEK (HARRIS/MONTGOMERY C/L | 6 of 6 | $5,657,693 | +138% |
| 07 APR 2021 | 04213009 | Yoakum District | CR Replace bridge and approaches from CR 403 AT WILLOW CREEK, ETC | 2 of 7 | $1,293,583 | +4.0% |
| 07 APR 2021 | 04213025 | Austin District | VA Landscape development from VARIOUS ON IH 35, FM 1460 & US 79 to IN WILLIAMSON COUNTY | 4 of 4 | $663,287 | +130% |
| 07 APR 2021 | 04213027 | Austin District | CS Rehabilitate bridge from ON POST HILL ST AT GAMELS BRANCH to STR# B00320001 | 2 of 10 | $199,870 | +15% |
| 07 APR 2021 | 04213028 | Brownwood District | SH 36 Intersection improvement from SH 36 AT US 67 & SH 16 AT FM 8 | 1 of 5 | $199,254 | Low, 5.0% under the second |
| 07 APR 2021 | 04213031 | Brownwood District | SH 16 Intersection improvement from SH 16 AT US 84 & SM 3425 AT SH 206 | 1 of 6 | $187,585 | Low, 2.0% under the second |
| 05 MAR 2021 | 03213216 | Tyler District | CR Bridge replacement from CR 2918 AT STEVE CREEK RELIEF to STR#AA2918101, 1.25 MI S OF FM 1256 | 10 of 10 | $2,382,443 | +91% |
| 04 MAR 2021 | 03213017 | Waco District | US 84 Upgrade mbgf from SH 317 to OAK CREEK DRIVE | 4 of 10 | $2,002,168 | +8.0% |
| 04 MAR 2021 | 03213030 | Houston District | FM 518 Bridge repairs from AT CHIGGER CREEK & COWART CREEK | 6 of 8 | $3,644,989 | +92% |
| 05 FEB 2021 | 02213211 | Houston District | FM 518 Construct curb ramps and signal improvements from FM 2351 to WHISPERING PINES AVE | 2 of 9 | $2,835,102 | +2.0% |
| 05 FEB 2021 | 02213216 | Houston District | SH 6 Safety lighting from HARRIS COUNTY LINE to VOSS ROAD | 7 of 10 | $2,198,411 | +11% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.