Diamond Surface, Inc.: TxDOT bid record

Diamond Surface, Inc. submitted 15 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 02 SEP 2026, and was the low bidder on 3 of them (20%). When it was not low, its total sat a median +27% above the low bid.

Owner
Texas DOT
Low bid volume
$5,500,845
Latest bid
02 SEP 2026
Data through
19 NOV 2026
15Bids
3Low bids
20Win rate, percent
+27%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
2020200%
20214125%
2022100%
20234250%
2024100%
2026300%
Diamond Surface, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
El Paso District5240%
Fort Worth District400%
Dallas District300%
Waco District11100%
Atlanta District100%
Houston District100%
Diamond Surface, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO158 (53%)$3,255.00$5,000.00
Portable changeable message sign503-7002EACH114 (36%)$6,224.40$10,000
Next gen concrete surface grind of concrete pavement3012-6002SY64 (67%)$7.09$7.55
Continuous diamond grinding concrete pavement3004-6001SY113 (27%)$4.78$5.40
Work zone pavement marking non-removing (W)6"(broken)662-7005LF63 (50%)$0.45$0.42
TMA (stationary)505-7001DAY122 (17%)$339.07$230.00
Pavement surface preparation for marking (6")678-7002LF122 (17%)$0.14$0.18
TMA (mobile operation)505-7003DAY62 (33%)$996.88$291.17
Reflectorized pavement marker type II-C-R672-7006EACH131 (8%)$6.25$5.00
Pavement surface preparation for marking (8")678-7004LF61 (17%)$0.23$0.20
Pavement surface preparation for marking (4")678-7001LF51 (20%)$0.13$0.15
Reflectorized pavement marking with retroreflectivity requirements type I (W)6"(broken)(090MIL)666-6305-007LF51 (20%)$1.44$0.83
Diamond Surface, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Interstate Improvement, Inc.95 of 9
Penhall Company73 of 7
Emery Sapp & Son'S Inc.75 of 7
Select Maintenance, L.L.C.75 of 7
O. Trevino Construction, LLC66 of 6
Roadworx, Inc.51 of 5
FNH Construction, LLC30 of 3
Ed Bell Construction Company21 of 2
Northeastern Pavers, LLC11 of 1
Texas Materials Group, Inc.11 of 1
Diamond Surface, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
02 SEP 2026A00220228Fort Worth DistrictReconstruct Existing Roadway, US 287 (FM 157 to Heritage Pkwy)4 of 7$3,858,768+47%
05 MAR 2026A00217917Houston DistrictSurfacing/Roadway Restoration, IH 10 (FM 1489 to FM 359)4 of 4$377,640+26%
05 MAR 2026A00210419Fort Worth DistrictPreventive Maintenance, SH 171 (W Owens St to South of BB Fielder Rd)4 of 4$2,323,830+88%
05 JUN 202406243044El Paso DistrictVA Preventive maintenance from EL PASO COUNTYWIDE to EL PASO COUNTYWIDE3 of 3$1,344,557+28%
28 JUN 202306233627El Paso DistrictIH 10 Preventive maintenance from 1.04 MI W OF FM 793 to 0.54 MI W OF FM 7931 of 3$1,536,930Low, 12% under the second
01 JUN 202306233025Dallas DistrictSH 78 Repair roadway from COLLIN COUNTY LINE to SPRING CREEK PARKWAY IN WYLIE2 of 6$1,806,080+4.0%
07 MAR 202303233030Waco DistrictIH 35 Resurface roadway from 0.55 MI SOUTH OF FM 2837 to FM 28371 of 3$1,969,296Low, 16% under the second
07 MAR 202303233038Atlanta DistrictUS 59 Diamond grinding 4-lane highway from 4.0 MI SOUTH OF FM 2328 (S) to SH 115 of 7$2,776,953+26%
30 JUN 202206223632El Paso DistrictIH 10 Preventive maintenance from 0.22 MI E OF EL PASO/HUDSPETH CL to 1.54 MI W OF KNOX AVE2 of 3$1,913,252+1.0%
04 NOV 202111213214Dallas DistrictSH 289 Rehabilitate existing roadway from IH 635 to COLLIN COUNTY LINE5 of 7$2,764,083+22%
05 AUG 202108213265Dallas DistrictIH 45 Hazard elimination & safety from 1 MILE SOUTH OF IH 20 to OVERTON RD5 of 7$2,048,793+23%
01 JUL 202107213039El Paso DistrictIH 10 Preventive maintenance from 1.54 MI N OF FM 793 to FM 7935 of 5$1,922,020+75%
07 APR 202104213033El Paso DistrictIH 10 Hazard elimination & safety from 2.13 MI E OF FM 34 to 11.172 MI E OF FM 341 of 5$1,994,619Low, 7.0% under the second
07 MAY 202005203008Fort Worth DistrictIH 820 Resurface roadway from IH 820/IH 20 SPLIT to WESTPOINT BLVD2 of 6$4,235,997+33%
06 FEB 202002203003Fort Worth DistrictVA Preventive maintenance from VARIOUS LOCATIONS IN JOHNSON COUNTY6 of 7$15,092,276+61%
Diamond Surface, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy