TxDOT contract A00210419 bid tabulation
Preventive Maintenance, SH 171 (W Owens St to South of BB Fielder Rd). Let by Texas DOT on March 5, 2026, Parker, Fort Worth District. 4 bids received; low bid $1,234,417 by O. Trevino Construction, LLC, -47% against the engineer's estimate of $2,323,830.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 44
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | O. Trevino Construction, LLC | $1,234,417 | Low | -47% |
| 2 | Emery Sapp & Son'S Inc. | $1,392,432 | +13% | -40% |
| 3 | Select Maintenance, L.L.C. | $1,604,554 | +30% | -31% |
| 4 | Diamond Surface, Inc. | $2,323,830 | +88% | 0.0% |
Engineer's estimate: $2,323,830.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. O. Trevino Construction, LLC | 2. Emery Sapp & Son'S Inc. | 3. Select Maintenance, L.L.C. | 4. Diamond Surface, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Full - depth repair CRCP (9") (361-7004) | CY | 125 | $989.00 | $1,220.00 | $500.00 | $1,281.25 | |
| 2 | Full - depth repair CRCP (11") (361-7006) | CY | 125 | $875.00 | $972.00 | $1,240.00 | $500.00 | $1,263.75 |
| 3 | Cleaning and sealing existing joints (438-7001) | LF | 31,378 | $15.00 | $2.45 | $3.60 | $4.00 | $3.00 |
| 4 | Mobilization (500-7001) | LS | 1 | $211,257 | $120,000 | $247,000 | $160,000 | $619,717 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $16,000 | $24,525 | $2,420.00 | $45,000 | $7,500.00 |
| 6 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $5,000.00 | $7,000.00 | $23,750 | $6,224.40 |
| 7 | TMA (stationary) (505-7001) | DAY | 28 | $160.00 | $175.00 | $625.00 | $300.00 | $676.56 |
| 8 | TMA (mobile operation) (505-7003) | DAY | 44 | $172.00 | $780.00 | $625.00 | $300.00 | $1,800.00 |
| 9 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 100 | $4.00 | $15.00 | $12.00 | $20.00 | $15.00 |
| 10 | Biodegradable erosion control logs (remove) (506-7046) | LF | 100 | $3.00 | $4.00 | $12.00 | $1.00 | $12.50 |
| 11 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 2 | $665.00 | $750.00 | $400.00 | $781.25 | |
| 12 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 15,338 | $1.00 | $0.70 | $0.80 | $0.78 | $0.82 |
| 13 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 6,831 | $1.00 | $0.75 | $0.85 | $0.78 | $0.88 |
| 14 | Reflectorized pavement marking type III (W)(8")(solid) (666-7239) | LF | 10,095 | $1.00 | $1.10 | $1.20 | $1.15 | $1.25 |
| 15 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 1,771 | $4.25 | $4.80 | $4.50 | $5.00 | |
| 16 | Reflectorized pavement marking type III (W)(24")(solid) (666-7244) | LF | 4,560 | $9.00 | $7.50 | $8.40 | $13.00 | $8.75 |
| 17 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 27,379 | $1.00 | $0.70 | $0.80 | $0.78 | $0.82 |
| 18 | Reflectorized pavement marking type III (Y)(12")(solid) (666-7252) | LF | 257 | $4.00 | $4.25 | $4.80 | $4.50 | $5.00 |
| 19 | Reflectorized pavement marking type III (Y)(24")(solid) (666-7253) | LF | 119 | $7.50 | $8.40 | $13.00 | $8.75 | |
| 20 | Reflectorized pavement marking type III (W)(arrow) (666-7254) | EACH | 69 | $280.00 | $234.00 | $263.00 | $250.00 | $275.00 |
| 21 | Reflectorized pavement marking type III (W)(word) (666-7257) | EACH | 68 | $310.00 | $260.50 | $300.00 | $275.00 | $306.25 |
| 22 | Reflectorized pavement marking type III (W)(36" yld tri) (666-7260) | EACH | 8 | $80.00 | $80.00 | $90.00 | $75.00 | $93.75 |
| 23 | Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262) | LF | 6,828 | $1.00 | $1.25 | $1.40 | $0.89 | $1.44 |
| 24 | Pavement sler 6" (666-7347) | LF | 56,376 | $1.00 | $0.11 | $0.15 | $0.01 | $0.13 |
| 25 | Pavement sler 8" (666-7348) | LF | 10,095 | $1.00 | $0.21 | $0.25 | $0.02 | $0.25 |
| 26 | Pavement sler 12" (666-7350) | LF | 2,028 | $1.00 | $0.85 | $1.00 | $0.05 | $1.00 |
| 27 | Pavement sler 24" (666-7352) | LF | 4,679 | $2.00 | $1.10 | $1.20 | $0.09 | $1.25 |
| 28 | Pavement sler (arrow) (666-7353) | EACH | 69 | $65.00 | $11.00 | $13.50 | $1.00 | $12.50 |
| 29 | Pavement sler (word) (666-7354) | EACH | 68 | $100.00 | $13.00 | $13.50 | $1.00 | $15.00 |
| 30 | Pavement sler (RR crossing) (666-7364) | EACH | 2 | $21.50 | $25.00 | $65.00 | $25.00 | |
| 31 | Pavement sler (yld tri) (666-7365) | EACH | 8 | $30.00 | $2.15 | $2.40 | $1.00 | $2.50 |
| 32 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 898 | $4.00 | $5.50 | $6.00 | $6.20 | $6.25 |
| 33 | Eliminating existing PM & markers (12") (677-7006) | LF | 3,147 | $4.00 | $1.85 | $2.10 | $4.00 | $2.19 |
| 34 | Eliminating existing PM & markers (24") (677-7008) | LF | 188 | $3.10 | $3.50 | $6.00 | $3.63 | |
| 35 | Pavement surface preparation for marking (6") (678-7002) | LF | 56,376 | $1.00 | $0.11 | $0.15 | $0.01 | $0.13 |
| 36 | Pavement surface preparation for marking (8") (678-7004) | LF | 10,095 | $2.00 | $0.30 | $0.30 | $0.02 | $0.32 |
| 37 | Pavement surface preparation for marking (12") (678-7006) | LF | 2,028 | $1.00 | $0.55 | $0.60 | $0.15 | $0.63 |
| 38 | Pavement surface preparation for marking (24") (678-7008) | LF | 4,679 | $15.00 | $1.10 | $1.20 | $0.25 | $1.25 |
| 39 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 69 | $200.00 | $16.00 | $18.00 | $10.00 | $18.75 |
| 40 | Pavement surface preparation for marking (word) (678-7016) | EACH | 68 | $190.00 | $22.00 | $24.00 | $10.00 | $25.00 |
| 41 | Pavement surface preparation for marking (RR crossing) (678-7020) | EACH | 2 | $60.00 | $65.00 | $15.00 | $68.75 | |
| 42 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 8 | $30.00 | $11.00 | $12.00 | $2.00 | $12.50 |
| 43 | Spalling repair (hydraulic cement) (720-7001) | CF | 100 | $260.00 | $305.00 | $480.00 | $425.00 | $393.75 |
| 44 | Continuous grinding-concrete pavement (3017-7001) | SY | 77,648 | $11.00 | $5.75 | $5.00 | $9.14 | $11.51 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.