TxDOT contract A00199763 bid tabulation
Hazard Elimination & Safety, FM 1423 (BUS 83S to CR 3677 /End of State Maintenance). Let by Texas DOT on July 1, 2025, Hidalgo, Pharr District. 6 bids received; low bid $3,406,133 by Texas Cordia Construction, LLC, -16% against the engineer's estimate of $4,068,431.
- Owner
- Texas DOT
- Letting
- 01 JUL 2025
- Pay items
- 84
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Cordia Construction, LLC | $3,406,133 | Low | -16% |
| 2 | Rovan Texas, L.L.C. | $3,546,657 | +4.0% | -13% |
| 3 | Ioc Company LLC | $3,642,334 | +7.0% | -10% |
| 4 | P & C Oil Field Service LLC | $3,745,994 | +10% | -8.0% |
| 5 | Earthworks Enterprise | $4,225,053 | +24% | +4.0% |
| 6 | Foremost Paving, Inc. | $4,645,620 | +36% | +14% |
Engineer's estimate: $4,068,431.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Cordia Construction, LLC | 2. Rovan Texas, L.L.C. | 3. Ioc Company LLC | 4. P & C Oil Field Service LLC | 5. Earthworks Enterprise | 6. Foremost Paving, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 72 | $2,500.00 | $1,500.00 | $3,831.73 | $3,250.00 | $1,000.00 | $1,396.49 | $4,700.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 248 | $15.00 | $10.00 | $27.64 | $50.97 | $50.00 | $16.64 | $51.15 |
| 3 | Remove (4") TRT/untrt base & asphalt pavement (105-7024) | SY | 4,891 | $15.00 | $12.00 | $4.24 | $6.50 | $23.00 | $23.14 | $4.15 |
| 4 | Excavation (roadway) (110-7001) | CY | 4,816 | $9.00 | $52.00 | $27.56 | $25.00 | $15.25 | $23.92 | $39.95 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 140 | $10.00 | $20.00 | $22.16 | $25.00 | $85.25 | $20.17 | $114.97 |
| 6 | Backfill (type A) (134-7001) | STA | 72 | $250.00 | $470.00 | $551.57 | $500.00 | $625.00 | $877.43 | $348.58 |
| 7 | Compost manuf topsoil (4") (161-7002) | SY | 23,349 | $2.50 | $2.00 | $7.83 | $0.75 | $12.25 | $10.65 | $7.81 |
| 8 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 23,349 | $0.50 | $1.00 | $0.68 | $0.50 | $0.70 | $0.78 | $0.51 |
| 9 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 20,510 | $0.40 | $1.00 | $0.62 | $0.36 | $0.60 | $0.72 | $0.37 |
| 10 | Vegetative watering (168-7001) | TGL | 824 | $12.00 | $46.00 | $69.84 | $37.02 | $48.00 | $11.09 | $48.43 |
| 11 | FL BS (roadway del)(type E GR 4)(final pos) (247-7277) | CY | 3,379 | $27.50 | $55.00 | $59.40 | $41.00 | $99.00 | $176.59 | $48.74 |
| 12 | Lime (com or QK)(slurry) (260-7005) | TON | 337 | $245.00 | $350.00 | $374.06 | $270.00 | $340.00 | $424.76 | $466.56 |
| 13 | Lime TRT (existing material)(12") (260-7009) | SY | 13,626 | $3.00 | $7.00 | $5.71 | $7.00 | $10.25 | $20.20 | $12.53 |
| 14 | Cement (275-7001) | TON | 114 | $200.00 | $200.00 | $220.38 | $200.00 | $215.00 | $248.32 | $272.08 |
| 15 | Cement TRT (new base)(10") (275-7012) | SY | 12,162 | $7.20 | $7.00 | $6.40 | $5.00 | $11.50 | $0.84 | $11.81 |
| 16 | Salvage,haul & stockpile reclaimed asphalt PV (1 to 3") (305-7034) | SY | 4,891 | $3.00 | $9.00 | $5.85 | $6.50 | $5.00 | $6.95 | $9.05 |
| 17 | Prime coat (MC-30) (310-7004) | GAL | 2,447 | $4.75 | $7.00 | $6.50 | $6.00 | $7.60 | $5.53 | $8.77 |
| 18 | Asphalt (tier II) (316-7266) | GAL | 3,670 | $4.00 | $6.00 | $4.69 | $6.00 | $7.25 | $4.22 | $19.27 |
| 19 | Aggregate (type-B GR-4P sac-B) (316-7267) | CY | 98 | $75.00 | $300.00 | $377.05 | $230.00 | $240.00 | $328.28 | $109.39 |
| 20 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 3,462 | $130.00 | $130.00 | $140.34 | $145.00 | $155.00 | $164.66 | $179.75 |
| 21 | Plane & text asphalt concrete pavement(1.5") (354-7018) | SY | 2,918 | $5.00 | $6.00 | $9.04 | $10.00 | $5.00 | $4.16 | $12.85 |
| 22 | Struct excavation (special) (400-7005) | CY | 530 | $75.00 | $125.00 | $97.13 | $75.00 | $98.00 | $58.81 | $71.40 |
| 23 | Cem stabil BKFL (400-7010) | CY | 320 | $113.00 | $115.00 | $90.94 | $75.00 | $150.00 | $150.30 | $173.40 |
| 24 | Trench excavation protection (402-7001) | LF | 826 | $1.75 | $8.00 | $4.77 | $0.10 | $3.00 | $4.57 | $0.11 |
| 25 | Class A concrete (collar) (420-7008) | EACH | 1 | $1,410.00 | $5,000.00 | $3,003.84 | $2,500.00 | $2,800.00 | $2,940.66 | $2,040.00 |
| 26 | Riprap (concrete)(5 in) (432-7002) | CY | 283 | $389.00 | $550.00 | $484.38 | $650.00 | $407.00 | $643.68 | $816.00 |
| 27 | Riprap (stone protection)(12 in) (432-7041) | CY | 36 | $175.00 | $200.00 | $330.66 | $500.00 | $320.00 | $379.87 | $224.40 |
| 28 | CMP (gal steel 12 in) (460-7001) | LF | 56 | $80.00 | $140.00 | $90.76 | $250.00 | $67.00 | $70.58 | $122.40 |
| 29 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 26 | $350.00 | $1,390.00 | $550.85 | $1,500.00 | $590.00 | $1,045.57 | $1,632.00 |
| 30 | RC pipe (CL III)(18 in) (464-7003) | LF | 672 | $101.00 | $130.00 | $93.28 | $150.00 | $97.00 | $182.98 | $137.70 |
| 31 | RC pipe (CL IV)(18 in) (464-7019) | LF | 130 | $84.00 | $140.00 | $101.90 | $175.00 | $110.00 | $193.43 | $142.80 |
| 32 | Headwall (CH - PW - 0) (diameter= 18 in) (466-7099) | EACH | 2 | $13,000 | $20,360 | $11,265 | $10,000 | $7,765.00 | $3,920.90 | $15,300 |
| 33 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 2 | $15,700 | $21,620 | $13,518 | $15,000 | $13,000 | $3,920.90 | $15,300 |
| 34 | Set (type I)(S= 3 FT)(HW= 2 FT)(3:1)(C) (467-7036) | EACH | 1 | $1,500.00 | $1,080.00 | $6,518.33 | $15,000 | $10,250 | $3,071.36 | $13,260 |
| 35 | Set (type I)(S= 3 FT)(HW= 2 FT)(4:1)(C) (467-7037) | EACH | 1 | $8.00 | $1,120.00 | $7,420.37 | $15,000 | $10,250 | $3,398.11 | $13,260 |
| 36 | Set (type II) (12 in) (CMP) (6: 1) (P) (467-7288) | EACH | 2 | $975.00 | $2,110.00 | $1,888.03 | $1,500.00 | $15,500 | $2,091.14 | $1,428.00 |
| 37 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 58 | $1,150.00 | $1,650.00 | $1,552.64 | $1,500.00 | $1,200.00 | $2,352.54 | $1,428.00 |
| 38 | Clean existing culverts (480-7001) | EACH | 3 | $5,000.00 | $5,910.00 | $1,144.16 | $2,000.00 | $1,500.00 | $1,960.45 | $3,060.00 |
| 39 | Removing structure (set) (496-7004) | EACH | 11 | $350.00 | $500.00 | $1,011.20 | $500.00 | $425.00 | $980.22 | $612.00 |
| 40 | Removing structure (wingwall) (496-7005) | EACH | 6 | $4,500.00 | $3,170.00 | $1,348.26 | $2,000.00 | $3,500.00 | $1,633.71 | $3,060.00 |
| 41 | Removing structure (pipe) (496-7007) | LF | 1,045 | $18.00 | $11.00 | $26.98 | $30.00 | $26.00 | $52.28 | $35.70 |
| 42 | Mobilization (500-7001) | LS | 1 | $368,161 | $200,000 | $153,596 | $350,000 | $155,000 | $51,027 | $350,000 |
| 43 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $8,000.00 | $1,000.00 | $12,179 | $5,000.00 | $1,050.00 | $4,607.05 | $6,400.00 |
| 44 | Portable changeable message sign (503-7002) | EACH | 6 | $10,520 | $160.00 | $2,137.46 | $16,500 | $6,800.00 | $15,095 | $4,104.92 |
| 45 | TMA (stationary) (505-7001) | DAY | 50 | $150.00 | $180.00 | $422.42 | $150.00 | $150.00 | $196.04 | $169.58 |
| 46 | TMA (mobile operation) (505-7003) | DAY | 50 | $150.00 | $250.00 | $738.94 | $300.00 | $100.00 | $634.12 | $0.01 |
| 47 | Construction exits (install) (type 2) (506-7021) | SY | 312 | $15.00 | $30.00 | $29.29 | $30.00 | $34.00 | $58.14 | $23.21 |
| 48 | Construction exits (remove) (506-7024) | SY | 312 | $4.00 | $11.00 | $12.42 | $10.00 | $12.00 | $25.31 | $20.46 |
| 49 | Temporary sediment control fence (install) (506-7039) | LF | 400 | $4.10 | $10.00 | $7.60 | $10.00 | $7.00 | $8.82 | $6.63 |
| 50 | Temporary sediment control fence (remove) (506-7041) | LF | 400 | $1.20 | $2.00 | $3.38 | $5.00 | $3.25 | $3.92 | $3.06 |
| 51 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 420 | $5.20 | $10.00 | $8.62 | $5.00 | $6.00 | $10.00 | $7.04 |
| 52 | Biodegradable erosion control logs (remove) (506-7046) | LF | 420 | $1.30 | $3.00 | $3.38 | $1.00 | $3.00 | $3.92 | $3.06 |
| 53 | Constructing detours (type 2) (508-7004) | SY | 7,617 | $207.00 | $39.00 | $65.47 | $50.00 | $66.50 | $63.64 | $77.58 |
| 54 | One-way traffic control (flagger cont) (510-7001) | HR | 844 | $40.00 | $320.00 | $35.17 | $115.00 | $72.00 | $109.52 | $235.46 |
| 55 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 180 | $50.00 | $64.00 | $102.69 | $35.00 | $100.00 | $59.86 | $60.03 |
| 56 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $58.00 | $140.00 | $114.24 | $35.00 | $97.00 | $51.81 | $47.97 |
| 57 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 180 | $8.00 | $28.00 | $24.75 | $10.00 | $12.00 | $9.86 | $33.03 |
| 58 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 40 | $8.00 | $100.00 | $24.74 | $10.00 | $12.00 | $11.23 | $18.09 |
| 59 | Driveways (concrete) (530-7006) | SY | 236 | $80.00 | $110.00 | $157.70 | $250.00 | $120.00 | $114.38 | $159.99 |
| 60 | Driveways (ACP) (530-7010) | SY | 2,173 | $50.00 | $41.00 | $54.18 | $130.00 | $76.00 | $46.07 | $88.65 |
| 61 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 14,201 | $0.17 | $0.30 | $0.44 | $0.29 | $0.25 | $0.52 | $0.88 |
| 62 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 7,139 | $0.22 | $0.40 | $0.52 | $0.38 | $0.30 | $0.52 | $1.51 |
| 63 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 18 | $315.00 | $630.00 | $394.26 | $350.00 | $350.00 | $496.55 | $357.00 |
| 64 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 2 | $400.00 | $790.00 | $450.59 | $400.00 | $400.00 | $926.75 | $408.00 |
| 65 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 2 | $590.00 | $1,900.00 | $732.20 | $650.00 | $775.00 | $1,958.07 | $663.00 |
| 66 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 8 | $825.00 | $970.00 | $929.33 | $825.00 | $950.00 | $1,019.43 | $841.50 |
| 67 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 3 | $915.00 | $1,100.00 | $1,098.30 | $975.00 | $1,400.00 | $1,280.82 | $994.50 |
| 68 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,160.00 | $1,290.00 | $1,295.43 | $1,150.00 | $1,800.00 | $1,437.66 | $1,173.00 |
| 69 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 8 | $73.00 | $390.00 | $168.97 | $150.00 | $114.00 | $196.05 | $153.00 |
| 70 | Remove delin & object marker assms (658-7078) | EACH | 10 | $11.00 | $130.00 | $28.16 | $25.00 | $36.00 | $32.67 | $25.50 |
| 71 | Work zone pavement marking non-removing (W)(RR crossing) (662-7024) | EACH | 2 | $228.00 | $450.00 | $506.91 | $450.00 | $475.00 | $758.04 | $459.00 |
| 72 | Work zone pavement marking removing (W)6"(DOT) (662-7066) | LF | 825 | $2.50 | $1.00 | $1.35 | $1.20 | $1.00 | $2.48 | $1.23 |
| 73 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 15,104 | $0.60 | $0.50 | $0.38 | $0.34 | $0.50 | $1.24 | $0.35 |
| 74 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 20 | $11.50 | $16.00 | $18.02 | $16.00 | $16.50 | $18.04 | $16.32 |
| 75 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 11,924 | $1.20 | $1.00 | $0.81 | $0.72 | $0.75 | $1.24 | $0.74 |
| 76 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 6,695 | $0.75 | $0.50 | $0.47 | $0.42 | $0.50 | $1.24 | $0.43 |
| 77 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 14,201 | $0.50 | $1.00 | $0.86 | $0.76 | $0.80 | $0.97 | $0.78 |
| 78 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 1,510 | $0.50 | $1.00 | $1.24 | $1.10 | $1.20 | $1.05 | $1.13 |
| 79 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 2,979 | $0.55 | $1.00 | $1.24 | $1.10 | $1.20 | $1.05 | $1.13 |
| 80 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 1 | $600.00 | $750.00 | $844.85 | $750.00 | $800.00 | $836.45 | $765.00 |
| 81 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 572 | $5.00 | $8.00 | $8.45 | $7.50 | $7.75 | $6.27 | $7.65 |
| 82 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,036 | $0.40 | $0.35 | $0.39 | $0.35 | $0.50 | $1.57 | $0.36 |
| 83 | Eliminating existing PM & markers (24") (677-7008) | LF | 11 | $3.00 | $4.00 | $4.51 | $4.00 | $4.00 | $10.46 | $4.08 |
| 84 | Bonding course (3007-7001) | GAL | 1,979 | $3.40 | $7.00 | $7.74 | $5.00 | $8.00 | $4.22 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.