TxDOT contract A00193142 bid tabulation
Hazard Elimination & Safety, US 290 (0.275 MI W of FM 973 to 0.189 MI E of FM 973). Let by Texas DOT on August 5, 2026, Travis, Austin District. 6 bids received; low bid $8,579,439 by Joe Bland Construction LLC, +8.2% against the engineer's estimate of $7,928,494.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 198
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Joe Bland Construction LLC | $8,579,439 | Low | +8.0% |
| 2 | Texas Materials Group, Inc. | $8,910,812 | +4.0% | +12% |
| 3 | Hunter Industries, LTD. | $8,987,526 | +5.0% | +13% |
| 4 | Aaron Concrete Contractors, LLC | $9,078,157 | +6.0% | +15% |
| 5 | Posillico Civil, Inc. | $9,403,875 | +10% | +19% |
| 6 | STX Civil | $9,465,248 | +10% | +19% |
Engineer's estimate: $7,928,494.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Joe Bland Construction LLC | 2. Texas Materials Group, Inc. | 3. Hunter Industries, LTD. | 4. Aaron Concrete Contractors, LLC | 5. Posillico Civil, Inc. | 6. STX Civil |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 41 | $1,025.00 | $725.00 | $6,600.00 | $437.00 | $3,755.00 | $703.30 | |
| 2 | Removing concrete (pavement) (104-7001) | SY | 226 | $25.00 | $45.00 | $72.60 | $26.00 | $32.00 | $20.38 | |
| 3 | Removing concrete (mowstrip) (104-7003) | SY | 914 | $15.00 | $20.00 | $36.00 | $29.70 | $13.00 | $12.00 | $13.35 |
| 4 | Excavation (roadway) (110-7001) | CY | 9,698 | $20.00 | $22.00 | $39.43 | $42.90 | $24.00 | $15.00 | $13.41 |
| 5 | Embankment (final)(OC)(type B) (132-7003) | CY | 841 | $30.00 | $10.00 | $13.50 | $42.90 | $11.00 | $30.00 | $28.85 |
| 6 | Embankment (final)(OC)(type C1) (132-7007) | CY | 5,260 | $50.00 | $50.00 | $60.00 | $64.93 | $68.00 | $45.00 | $92.65 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 13,169 | $2.50 | $1.50 | $7.15 | $3.30 | $4.00 | $5.00 | $4.48 |
| 8 | Hydro mulch seed (permanent_urban_clay) (164-7020) | SY | 13,169 | $0.75 | $0.50 | $0.75 | $0.55 | $1.00 | $0.70 | $0.64 |
| 9 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 6,585 | $1.25 | $0.50 | $0.60 | $0.44 | $0.47 | $0.45 | $0.51 |
| 10 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 6,585 | $1.25 | $0.50 | $0.60 | $0.44 | $0.47 | $0.25 | $0.51 |
| 11 | Vegetative watering (168-7001) | TGL | 527 | $35.00 | $75.00 | $89.00 | $36.30 | $50.00 | $80.00 | $44.76 |
| 12 | FL BS (compacted in place)(type A GR 5)(final pos) (247-7179) | CY | 4,702 | $65.00 | $80.00 | $103.00 | $82.28 | $97.00 | $60.00 | $88.89 |
| 13 | Prime coat (multi option) (310-7015) | GAL | 2,575 | $6.00 | $4.00 | $5.00 | $6.60 | $5.00 | $5.00 | $2.25 |
| 14 | D-GR HMA type-B PG64-22 (341-7001) | TON | 6,372 | $87.50 | $134.00 | $125.00 | $111.10 | $116.00 | $138.50 | $125.00 |
| 15 | D-GR HMA type D PG76-22 (341-7056) | TON | 1,064 | $115.00 | $190.00 | $154.00 | $121.00 | $148.00 | $185.00 | $180.00 |
| 16 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 771 | $158.00 | $167.00 | $138.60 | $173.00 | $190.00 | $152.00 | |
| 17 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 10,942 | $155.00 | $195.00 | $173.25 | $167.20 | $169.00 | $195.00 | $185.00 |
| 18 | Flexible pavement structure repair(4") (351-7003) | SY | 11,802 | $40.00 | $40.00 | $39.01 | $37.00 | $38.00 | $42.00 | |
| 19 | Planing asphalt concrete pavement (1.5") (354-7074) | SY | 109,653 | $2.50 | $1.85 | $2.20 | $2.00 | $4.00 | $4.08 | |
| 20 | Plan asphalt concrete pavement (0"-1.5" edge mill) (354-7099) | SY | 8,351 | $3.00 | $1.50 | $2.20 | $1.00 | $3.60 | $8.59 | |
| 21 | Cut & restoring pavement (400-7006) | SY | 33 | $550.00 | $267.00 | $249.66 | $371.00 | $430.00 | $29.09 | |
| 22 | Cem stabil BKFL (400-7010) | CY | 208 | $170.00 | $250.00 | $235.65 | $255.00 | $220.00 | $158.56 | |
| 23 | Trench excavation protection (402-7001) | LF | 772 | $6.00 | $1.00 | $42.24 | $6.00 | $15.00 | $8.70 | |
| 24 | Temporary special shoring (403-7001) | SF | 325 | $25.00 | $39.00 | $65.68 | $135.00 | $30.00 | $14.49 | |
| 25 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $325.00 | $500.00 | $384.98 | $443.00 | $400.00 | $447.55 | |
| 26 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $675.00 | $600.00 | $549.97 | $632.00 | $740.00 | $639.36 | |
| 27 | Class A concrete (collar) (420-7008) | EACH | 4 | $1,150.00 | $2,100.00 | $2,504.73 | $2,140.00 | $2,600.00 | $3,059.01 | |
| 28 | Class C concrete (rail foundation) (420-7052) | CY | 11 | $1,525.00 | $800.00 | $1,000.84 | $907.00 | $1,000.00 | $1,268.31 | |
| 29 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 25 | $130.00 | $210.00 | $1,147.07 | $523.00 | $515.00 | $450.00 | |
| 30 | Riprap (concrete)(5 in) (432-7002) | CY | 327 | $615.00 | $525.00 | $635.00 | $471.17 | $929.00 | $600.00 | $604.61 |
| 31 | Riprap (mow strip)(4 in) (432-7013) | CY | 135 | $700.00 | $690.00 | $650.00 | $697.81 | $683.00 | $630.00 | $681.17 |
| 32 | Riprap (stone type R)(dry)(18 in) (432-7024) | CY | 153 | $220.00 | $215.00 | $210.00 | $223.66 | $219.00 | $200.00 | $165.72 |
| 33 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 944 | $65.00 | $60.00 | $44.00 | $66.00 | $19.00 | $60.00 | |
| 34 | Rail (type SSTR) (450-7024) | LF | 185 | $100.00 | $145.00 | $94.00 | $121.27 | $102.00 | $210.00 | $139.48 |
| 35 | Retrofit rail (type SSTR) (451-7024) | LF | 868 | $110.00 | $123.00 | $161.69 | $128.00 | $175.00 | $185.97 | |
| 36 | Concrete box culvert (8 FT X 4 FT)(extend) (462-7076) | LF | 10 | $1,575.00 | $1,400.00 | $3,420.89 | $2,483.00 | $3,500.00 | $1,361.45 | |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 116 | $110.00 | $88.00 | $166.05 | $161.00 | $138.00 | $96.18 | |
| 38 | RC pipe (CL III)(24 in) (464-7005) | LF | 739 | $130.00 | $123.00 | $209.24 | $200.00 | $136.00 | $125.21 | |
| 39 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 3 | $6,750.00 | $9,200.00 | $10,614 | $5,148.00 | $5,500.00 | $6,675.50 | |
| 40 | Inlet (complete)(pcu)(3FT)(both) (465-7032) | EACH | 3 | $10,000 | $6,890.00 | $8,625.86 | $10,866 | $9,000.00 | $11,839 | |
| 41 | Inlet (complete)(PMBD)(4FT) (465-7045) | EACH | 5 | $11,650 | $14,300 | $16,343 | $10,771 | $10,000 | $13,766 | |
| 42 | Inlet (complete)(PSL)(FG)(3FTX5FT-3FTX5FT) (465-7130) | EACH | 1 | $7,500.00 | $6,490.00 | $13,964 | $9,030.00 | $7,000.00 | $10,245 | |
| 43 | Inl(CMP)(pazd-CZ)(FG)(3FTX3FT-3FTX3FT) (465-7163) | EACH | 1 | $6,500.00 | $5,800.00 | $12,227 | $7,189.00 | $8,000.00 | $9,362.56 | |
| 44 | Inl(CMP)(pazd-CZ)(FG)(4FTX4FT-4FTX4FT) (465-7165) | EACH | 1 | $8,750.00 | $7,500.00 | $13,843 | $9,479.00 | $9,000.00 | $12,679 | |
| 45 | Wingwall (FW - 0) (HW=5 FT) (466-7147) | EACH | 1 | $15,000 | $19,000 | $22,252 | $28,791 | $25,000 | $16,512 | |
| 46 | Wingwall (PW - 1) (HW=13 FT) (466-7183) | EACH | 1 | $65,000 | $95,000 | $175,000 | $125,968 | $213,329 | $30,000 | $93,528 |
| 47 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 1 | $2,500.00 | $2,500.00 | $3,733.29 | $2,814.00 | $3,000.00 | $2,332.33 | |
| 48 | Adjusting inlets (cap) (479-7006) | EACH | 2 | $2,700.00 | $1,500.00 | $4,700.00 | $2,877.26 | $5,867.00 | $1,300.00 | $318.67 |
| 49 | Clean existing culverts (480-7001) | EACH | 2 | $5,200.00 | $4,250.00 | $3,500.00 | $3,147.89 | $18,141 | $2,500.00 | $3,267.52 |
| 50 | Removing structure (set) (496-7004) | EACH | 1 | $2,000.00 | $250.00 | $1,880.96 | $814.00 | $800.00 | $662.47 | |
| 51 | Removing structure (pipe) (496-7007) | LF | 8 | $215.00 | $50.00 | $77.08 | $70.00 | $52.82 | $26.67 | |
| 52 | Removing structure (box culvert) (496-7008) | LF | 6 | $250.00 | $295.00 | $100.00 | $256.68 | $295.00 | $45.00 | $99.95 |
| 53 | Mobilization (500-7001) | LS | 1 | $718,450 | $300,000 | $225,000 | $681,383 | $577,970 | $800,000 | $741,517 |
| 54 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $9,000.00 | $4,000.00 | $25,000 | $7,239.88 | $12,625 | $3,000.00 | $4,671.87 |
| 55 | Portable changeable message sign (503-7002) | EACH | 4 | $9,000.00 | $2,125.00 | $15,000 | $17,860 | $21,353 | $13,000 | $14,000 |
| 56 | TMA (stationary) (505-7001) | DAY | 39 | $300.00 | $255.00 | $350.00 | $297.67 | $405.00 | $275.00 | $300.00 |
| 57 | TMA (mobile operation) (505-7003) | DAY | 37 | $175.00 | $1,575.00 | $500.00 | $416.74 | $410.00 | $1,419.97 | $325.00 |
| 58 | Rock filter dams (install) (type 2) (506-7002) | LF | 275 | $50.00 | $40.00 | $41.25 | $44.00 | $45.00 | $47.95 | |
| 59 | Rock filter dams (remove) (506-7011) | LF | 275 | $20.00 | $12.00 | $22.00 | $23.00 | $27.00 | $25.57 | |
| 60 | Construction exits (install) (type 1) (506-7020) | SY | 111 | $40.00 | $35.00 | $35.75 | $38.00 | $33.00 | $41.56 | |
| 61 | Construction exits (remove) (506-7024) | SY | 111 | $15.00 | $15.00 | $14.85 | $16.00 | $15.00 | $17.26 | |
| 62 | Temporary sediment control fence (install) (506-7039) | LF | 1,704 | $3.50 | $5.00 | $5.00 | $3.02 | $3.00 | $3.50 | $3.52 |
| 63 | Temporary sediment control fence (remove) (506-7041) | LF | 1,704 | $1.00 | $1.00 | $2.00 | $1.04 | $1.00 | $1.00 | $1.21 |
| 64 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 440 | $9.00 | $7.00 | $4.34 | $5.00 | $5.00 | $5.05 | |
| 65 | Biodegradable erosion control logs (remove) (506-7046) | LF | 440 | $1.00 | $1.00 | $0.99 | $1.00 | $0.95 | $1.15 | |
| 66 | Constructing detours (508-7001) | SY | 211 | $115.00 | $275.00 | $225.00 | $221.04 | $216.00 | $320.00 | $301.16 |
| 67 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 740 | $90.00 | $78.54 | $48.70 | $43.00 | $55.00 | $82.98 | |
| 68 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 80 | $120.00 | $52.54 | $82.33 | $19.00 | $149.00 | $82.99 | |
| 69 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 200 | $15.00 | $23.00 | $28.16 | $9.00 | $15.00 | $29.35 | |
| 70 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 80 | $15.00 | $97.00 | $38.17 | $9.00 | $100.00 | $29.35 | |
| 71 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 740 | $10.00 | $44.00 | $17.85 | $43.00 | $18.00 | $32.16 | |
| 72 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 80 | $10.00 | $18.00 | $32.56 | $19.00 | $19.93 | $31.89 | |
| 73 | PTB (fur&inst)(SSCB or CSB)(type 1)or(steel) (512-7085) | LF | 6,180 | $75.00 | $57.65 | $42.94 | $47.00 | $75.00 | $65.00 | |
| 74 | PTB (move)(SSCB or CSB)(type 1)or(steel) (512-7086) | LF | 3,090 | $12.50 | $15.00 | $19.00 | $17.20 | $19.00 | $9.00 | $11.88 |
| 75 | PTB (remove)(SSCB or CSB)(type 1)or(steel) (512-7088) | LF | 6,180 | $15.00 | $10.00 | $19.00 | $13.03 | $19.00 | $16.00 | $8.23 |
| 76 | Permanent CTB (single slope) (type 1) (54 ) (514-7009) | LF | 863 | $100.00 | $61.00 | $155.92 | $144.00 | $199.00 | $179.33 | |
| 77 | Concrete curb & gutter (type I) (529-7008) | LF | 1,611 | $35.00 | $25.00 | $107.07 | $45.85 | $30.00 | $34.00 | $47.35 |
| 78 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,725 | $35.00 | $30.00 | $24.00 | $26.95 | $29.00 | $35.00 | $31.33 |
| 79 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $2,000.00 | $2,150.00 | $1,850.00 | $2,639.88 | $2,218.00 | $2,500.00 | $2,429.57 |
| 80 | Downstream anchor terminal section (540-7015) | EACH | 3 | $1,525.00 | $1,600.00 | $1,484.93 | $1,576.00 | $1,500.00 | $1,726.27 | |
| 81 | Remove metal beam guard fence (542-7001) | LF | 1,637.50 | $2.50 | $2.00 | $4.00 | $1.65 | $2.00 | $2.00 | $1.92 |
| 82 | Remove downstream anchor terminal (542-7003) | EACH | 4 | $250.00 | $145.00 | $400.00 | $137.49 | $146.00 | $150.00 | $159.84 |
| 83 | Cable barrier system (install)(TL-4) (543-7002) | LF | 340 | $35.00 | $55.00 | $33.55 | $36.00 | $40.00 | $39.00 | |
| 84 | Cable barrier terminal sec (install)(TL-4) (543-7018) | EACH | 2 | $6,500.00 | $2,600.00 | $6,324.71 | $6,711.00 | $7,000.00 | $7,352.64 | |
| 85 | Cable barrier (remove) (543-7037) | LF | 1,790 | $1.00 | $7.00 | $0.82 | $1.00 | $0.85 | $0.96 | |
| 86 | Cable barrier terminal section (remove) (543-7038) | EACH | 4 | $395.00 | $650.00 | $384.98 | $409.00 | $450.00 | $447.55 | |
| 87 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,250.00 | $4,100.00 | $3,400.00 | $3,987.32 | $4,231.00 | $4,500.00 | $4,635.36 |
| 88 | Guardrail end treatment (remove) (544-7003) | EACH | 3 | $300.00 | $160.00 | $400.00 | $153.99 | $163.00 | $150.00 | $179.02 |
| 89 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 10 | $1,500.00 | $625.00 | $3,250.00 | $604.97 | $642.00 | $790.00 | $2,999.79 |
| 90 | Crash cushion attenuator (remove) (545-7004) | EACH | 11 | $1,500.00 | $415.00 | $1,500.00 | $401.48 | $426.00 | $500.00 | $1,199.40 |
| 91 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 2 | $32,500 | $28,000 | $31,624 | $33,557 | $36,000 | $30,271 | |
| 92 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 11 | $7,750.00 | $8,569.07 | $7,534.65 | $7,995.00 | $8,500.00 | $9,683.70 | |
| 93 | Conduit (HDPE) (2") (618-7009) | LF | 270 | $18.00 | $20.00 | $11.00 | $13.00 | $13.00 | $12.79 | |
| 94 | Conduit (HDPE) (3") (618-7013) | LF | 350 | $20.00 | $28.00 | $18.70 | $22.00 | $25.00 | $21.74 | |
| 95 | Conduit (HDPE) (3") bore (618-7014) | LF | 1,095 | $55.00 | $33.00 | $27.50 | $32.00 | $36.00 | $31.97 | |
| 96 | Electrical conductor (no.8) bare (620-7007) | LF | 1,655 | $2.25 | $2.00 | $1.87 | $2.00 | $2.00 | $2.17 | |
| 97 | Electrical conductor (no.8) insulated (620-7008) | LF | 2,820 | $2.50 | $2.00 | $2.09 | $2.00 | $3.00 | $2.43 | |
| 98 | Electrical conductor (no.6) bare (620-7009) | LF | 65 | $2.50 | $5.00 | $2.42 | $3.00 | $3.00 | $2.81 | |
| 99 | Electrical conductor (no.6) insulated (620-7010) | LF | 130 | $3.50 | $5.00 | $2.69 | $3.00 | $3.00 | $3.13 | |
| 100 | Ground box type D (162922)W/apron (624-7008) | EACH | 7 | $2,050.00 | $1,900.00 | $1,869.91 | $2,150.00 | $2,200.00 | $2,173.82 | |
| 101 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 1 | $7,675.00 | $9,500.00 | $8,579.61 | $9,865.00 | $9,500.00 | $9,974.01 | |
| 102 | Aluminum signs (type A) (636-7001) | SF | 110 | $55.00 | $47.00 | $24.20 | $47.00 | $30.00 | $47.31 | |
| 103 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 8 | $800.00 | $750.00 | $780.96 | $759.00 | $1,020.00 | $907.89 | |
| 104 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 28 | $950.00 | $777.00 | $934.96 | $875.00 | $1,220.00 | $1,086.91 | |
| 105 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $1,125.00 | $1,463.00 | $1,092.25 | $992.00 | $1,425.00 | $1,269.77 | |
| 106 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,375.00 | $1,600.00 | $1,336.44 | $1,089.00 | $1,300.00 | $1,553.65 | |
| 107 | Remove SM RD SN sup&AM (644-7073) | EACH | 36 | $70.00 | $1,258.00 | $68.20 | $88.00 | $75.00 | $79.28 | |
| 108 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 8 | $30.00 | $34.00 | $27.50 | $23.00 | $30.00 | $50.00 | |
| 109 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015) | EACH | 23 | $35.00 | $34.00 | $33.00 | $35.00 | $36.00 | $52.00 | |
| 110 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 8 | $30.00 | $34.00 | $27.50 | $23.00 | $32.00 | $51.00 | |
| 111 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 17 | $30.00 | $34.00 | $27.50 | $23.00 | $35.00 | $55.00 | |
| 112 | Install delineator assembly (D-SY)SZ 1(BRF)GF1 (658-7034) | EACH | 16 | $35.00 | $34.00 | $33.00 | $35.00 | $30.00 | $60.00 | |
| 113 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 1 | $115.00 | $520.00 | $109.99 | $204.00 | $160.00 | $65.00 | |
| 114 | Install delineator assembly (D-DY)SZ 1(yflx)GNDHH (658-7146) | EACH | 1 | $285.00 | $520.00 | $274.99 | $204.00 | $160.00 | $75.00 | |
| 115 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 1,620 | $3.50 | $1.50 | $1.25 | $1.04 | $1.00 | $0.95 | $1.53 |
| 116 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 7,907 | $1.50 | $1.00 | $0.75 | $1.04 | $1.00 | $1.00 | $0.93 |
| 117 | Work zone pavement marking removing (W)8"(DOT) (662-7070) | LF | 294 | $5.00 | $2.00 | $1.75 | $2.34 | $5.00 | $2.20 | $5.72 |
| 118 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 17,370 | $1.50 | $1.50 | $1.25 | $1.88 | $2.00 | $2.20 | $1.97 |
| 119 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 263 | $15.00 | $12.00 | $10.00 | $5.86 | $5.00 | $5.50 | $5.11 |
| 120 | Work zone pavement marking removing (W)(arrow) (662-7082) | EACH | 50 | $220.00 | $225.00 | $200.00 | $57.44 | $96.00 | $68.00 | $105.69 |
| 121 | Work zone pavement marking removing (W)(double arrow) (662-7083) | EACH | 5 | $225.00 | $350.00 | $300.00 | $82.06 | $128.00 | $75.00 | $140.66 |
| 122 | Work zone pavement marking removing (W)(word) (662-7092) | EACH | 47 | $275.00 | $225.00 | $200.00 | $57.44 | $112.00 | $55.00 | $122.76 |
| 123 | Work zone pavement marking removing (W)36"(yld tri) (662-7094) | EACH | 27 | $75.00 | $40.00 | $35.00 | $17.58 | $37.00 | $16.00 | $40.92 |
| 124 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 16,664 | $2.00 | $1.00 | $0.75 | $1.04 | $1.00 | $1.00 | $0.93 |
| 125 | Work zone pavement marking removing (Y)24"(solid) (662-7105) | LF | 18 | $15.00 | $12.00 | $10.00 | $4.69 | $5.00 | $4.10 | $5.12 |
| 126 | Work zone pavement marking removing (Y)(med nose) (662-7111) | EACH | 4 | $75.00 | $450.00 | $400.00 | $117.23 | $134.00 | $110.00 | $147.05 |
| 127 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 5,968 | $2.25 | $1.50 | $1.75 | $1.00 | $1.60 | $0.64 | |
| 128 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,496 | $2.25 | $1.50 | $1.75 | $1.00 | $0.75 | $0.64 | |
| 129 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 182 | $1.25 | $1.00 | $1.17 | $1.00 | $1.05 | $1.47 | |
| 130 | Reflectorized pavement marking type I (W)6"(lane drop)(090MIL) (666-7011) | LF | 1,272 | $1.25 | $1.00 | $0.70 | $1.00 | $0.65 | $1.60 | |
| 131 | Reflectorized pavement marking type I (W)8"(lane drop)(090MIL) (666-7020) | LF | 918 | $1.25 | $1.00 | $1.06 | $2.00 | $0.95 | $1.79 | |
| 132 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 16,068 | $1.00 | $0.80 | $1.00 | $1.00 | $0.90 | $1.15 | |
| 133 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 345 | $3.50 | $3.25 | $2.34 | $4.00 | $2.20 | $4.86 | |
| 134 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 1,504 | $7.50 | $6.50 | $7.61 | $9.00 | $7.00 | $9.72 | |
| 135 | Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041) | EACH | 85 | $175.00 | $150.00 | $187.57 | $152.00 | $180.00 | $166.23 | |
| 136 | Reflectorized pavement marking type I(W)(double arrow)(090MIL) (666-7044) | EACH | 11 | $285.00 | $250.00 | $232.12 | $222.00 | $220.00 | $242.96 | |
| 137 | Reflectorized pavement marking type I(W)(lane drop arrow)(090MIL) (666-7059) | EACH | 2 | $395.00 | $350.00 | $439.62 | $303.00 | $400.00 | $332.47 | |
| 138 | Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065) | EACH | 84 | $200.00 | $175.00 | $205.16 | $187.00 | $220.00 | $204.60 | |
| 139 | Ref pavement marking type I(W)36"(yld tri)(090MIL) (666-7089) | EACH | 38 | $40.00 | $35.00 | $44.55 | $67.00 | $45.00 | $72.89 | |
| 140 | Reflectorized pavement marking type I (Y)12"(solid)(090MIL) (666-7116) | LF | 74 | $4.00 | $3.25 | $4.69 | $4.00 | $4.20 | $4.86 | |
| 141 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 8,980 | $0.25 | $0.20 | $0.33 | $0.33 | $0.30 | $0.36 | |
| 142 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 182 | $0.25 | $0.20 | $0.33 | $1.00 | $0.30 | $1.41 | |
| 143 | Reflectorized pavement marking type II (W) 6" (lane drop) (666-7174) | LF | 1,272 | $0.25 | $0.20 | $0.33 | $1.00 | $0.30 | $1.02 | |
| 144 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 24,277 | $0.25 | $0.20 | $0.33 | $0.23 | $0.40 | $0.26 | |
| 145 | Reflectorized pavement marking type II (W) 8" (lane drop) (666-7178) | LF | 918 | $0.50 | $0.30 | $0.47 | $1.00 | $0.40 | $0.90 | |
| 146 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 16,068 | $0.50 | $0.30 | $0.46 | $0.44 | $0.45 | $0.49 | |
| 147 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 345 | $2.00 | $1.50 | $1.17 | $2.00 | $1.10 | $1.69 | |
| 148 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 1,504 | $3.50 | $3.00 | $2.23 | $3.00 | $2.00 | $3.39 | |
| 149 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 85 | $55.00 | $50.00 | $46.89 | $96.00 | $50.00 | $104.86 | |
| 150 | Reflectorized pavement marking type II (W) (double arrow) (666-7187) | EACH | 11 | $115.00 | $99.00 | $64.48 | $99.00 | $60.00 | $108.69 | |
| 151 | Reflectorized pavement marking type II (W) (LN reduct arrow) (666-7192) | EACH | 2 | $165.00 | $147.00 | $105.51 | $163.00 | $100.00 | $179.02 | |
| 152 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 84 | $55.00 | $50.00 | $64.48 | $111.00 | $70.00 | $121.48 | |
| 153 | Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201) | EACH | 38 | $18.00 | $15.00 | $11.72 | $37.00 | $12.00 | $40.92 | |
| 154 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 25,442 | $0.25 | $0.20 | $0.33 | $0.23 | $0.30 | $0.26 | |
| 155 | Reflectorized pavement marking type II (Y) 12" (solid) (666-7215) | LF | 74 | $1.75 | $1.50 | $1.17 | $2.00 | $1.00 | $1.69 | |
| 156 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 24,192 | $1.00 | $0.79 | $0.81 | $1.00 | $0.80 | $1.14 | |
| 157 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 21,636 | $1.00 | $0.79 | $0.81 | $1.00 | $0.70 | $1.14 | |
| 158 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 8,980 | $0.75 | $0.54 | $0.64 | $1.00 | $0.70 | $0.83 | |
| 159 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 85 | $0.75 | $0.54 | $0.64 | $1.00 | $0.60 | $0.77 | |
| 160 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 3,806 | $0.75 | $0.54 | $0.64 | $1.00 | $0.60 | $0.77 | |
| 161 | Reflectorized pavement marker type I-C (672-7002) | EACH | 228 | $4.00 | $3.50 | $4.57 | $5.00 | $4.00 | $5.11 | |
| 162 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 179 | $4.00 | $3.50 | $4.57 | $5.00 | $4.00 | $5.11 | |
| 163 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,488 | $4.00 | $3.50 | $4.57 | $5.00 | $5.00 | $5.11 | |
| 164 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,362 | $1.25 | $1.00 | $0.81 | $1.00 | $0.75 | $0.68 | |
| 165 | Eliminating existing PM & markers (6") (677-7002) | LF | 4,489 | $1.25 | $1.00 | $0.82 | $1.00 | $0.75 | $0.68 | |
| 166 | Eliminating existing PM & markers (8") (677-7004) | LF | 3,711 | $3.00 | $1.25 | $1.00 | $1.17 | $1.00 | $1.05 | $1.47 |
| 167 | Eliminating existing PM & markers (24") (677-7008) | LF | 281 | $15.00 | $6.00 | $5.00 | $3.52 | $3.00 | $3.20 | $3.52 |
| 168 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 13 | $115.00 | $100.00 | $64.48 | $47.00 | $65.00 | $51.15 | |
| 169 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 1 | $165.00 | $150.00 | $87.92 | $64.00 | $80.00 | $70.33 | |
| 170 | Eliminating existing PM & markers (word) (677-7015) | EACH | 13 | $115.00 | $100.00 | $64.48 | $53.00 | $65.00 | $57.54 | |
| 171 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $11,350 | $8,500.00 | $9,459.57 | $10,876 | $11,500 | $10,997 | |
| 172 | Removing traffic signals (680-7004) | EACH | 1 | $3,500.00 | $8,500.00 | $5,829.73 | $6,703.00 | $6,500.00 | $6,777.22 | |
| 173 | Temporary traffic signals (681-7001) | EACH | 1 | $12,500 | $8,500.00 | $9,239.58 | $10,624 | $11,000 | $10,741 | |
| 174 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 10 | $325.00 | $350.00 | $373.98 | $430.00 | $500.00 | $434.77 | |
| 175 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 7 | $325.00 | $350.00 | $373.98 | $430.00 | $400.00 | $434.76 | |
| 176 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 10 | $325.00 | $350.00 | $373.98 | $430.00 | $500.00 | $434.77 | |
| 177 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 6 | $325.00 | $350.00 | $373.98 | $430.00 | $500.00 | $434.77 | |
| 178 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 10 | $325.00 | $350.00 | $373.98 | $430.00 | $500.00 | $434.77 | |
| 179 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 6 | $325.00 | $350.00 | $373.98 | $430.00 | $500.00 | $434.77 | |
| 180 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 15 | $180.00 | $160.00 | $197.99 | $228.00 | $210.00 | $230.17 | |
| 181 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 1 | $250.00 | $170.00 | $208.99 | $240.00 | $220.00 | $242.95 | |
| 182 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 4,095 | $2.25 | $3.00 | $2.14 | $2.00 | $3.00 | $2.49 | |
| 183 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 505 | $3.50 | $3.00 | $2.64 | $3.00 | $3.00 | $3.07 | |
| 184 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 1 | $17,775 | $17,500 | $17,269 | $19,856 | $20,000 | $20,076 | |
| 185 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $18,000 | $18,000 | $17,489 | $20,109 | $20,000 | $20,332 | |
| 186 | Ins traffic signal PL AM(S)2 arm(50-28')lum (686-7179) | EACH | 1 | $45,000 | $39,000 | $42,788 | $49,197 | $44,969 | $49,742 | |
| 187 | Ins traffic signal PL AM(S)2 arm(65-28')lum (686-7263) | EACH | 1 | $47,950 | $41,500 | $46,638 | $53,624 | $47,000 | $54,218 | |
| 188 | Bridge joint replacement (header) (785-7013) | LF | 4 | $2,650.00 | $750.00 | $824.96 | $527.00 | $800.00 | $6,000.00 | |
| 189 | Underseal course (3006-7001) | GAL | 25,821 | $4.00 | $4.00 | $6.00 | $5.34 | $8.00 | $4.50 | $5.00 |
| 190 | Bonding course (3007-7001) | GAL | 2,320 | $6.00 | $4.25 | $4.50 | $3.74 | $5.00 | $5.00 | $7.00 |
| 191 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 10 | $1,250.00 | $7,750.00 | $1,400.00 | $1,044.95 | $9,207.00 | $4,000.00 | $800.00 |
| 192 | ITS com CBL (ethernet) (6005-7001) | LF | 130 | $4.50 | $3.00 | $1.48 | $2.00 | $1.98 | $1.73 | |
| 193 | VIVDS prosr sys (6006-7001) | EACH | 1 | $13,500 | $15,000 | $12,979 | $14,924 | $15,000 | $15,089 | |
| 194 | VIVDS cam assy FXD LNS (6006-7002) | EACH | 6 | $4,275.00 | $0.01 | $4,179.81 | $4,806.00 | $5,000.00 | $4,859.14 | |
| 195 | VIVDS CNTRL software (6006-7005) | EACH | 1 | $350.00 | $15,000 | $725.97 | $835.00 | $750.00 | $843.96 | |
| 196 | VIVDS cabling (6006-7007) | LF | 1,625 | $2.25 | $3.00 | $1.59 | $2.00 | $2.00 | $1.85 | |
| 197 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $9,650.00 | $8,500.00 | $8,689.60 | $9,991.00 | $10,000 | $10,102 | |
| 198 | Installation of cellular modem (6015-7001) | EACH | 1 | $175.00 | $750.00 | $934.96 | $1,075.00 | $1,000.00 | $1,086.91 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.