TxDOT contract A00186409 bid tabulation

Bridge Replacement, YORKTOWN BLVD (3.7 MI E OF FM 2444 to .). Let by Texas DOT on April 8, 2026, Nueces, Corpus Christi District. 5 bids received; low bid $21,281,902 by Ragle Construction, Inc., +35% against the engineer's estimate of $15,784,448.

Owner
Texas DOT
Letting
08 APR 2026
Pay items
77
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ragle Construction, Inc.$21,281,902Low+35%
2J E Construction Services, LLC$22,417,226+5.0%+42%
3Orion Construction, LLC$24,198,000+14%+53%
4Copasa Inc$27,146,162+28%+72%
5Anderson Columbia Co., Inc.$27,970,212+31%+77%
TxDOT contract A00186409: bids by rank

Engineer's estimate: $15,784,448.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ragle Construction, Inc.2. J E Construction Services, LLC3. Orion Construction, LLC4. Copasa Inc5. Anderson Columbia Co., Inc.
1Preparing row (100-7002)STA16.60$600.00$120,000$14,880$121,585$163,531$5,000.00
2Excavation (roadway) (110-7001)CY10,578$8.25$25.50$16.00$16.00$15.50$7.50
3Embankment (final)(OC)(type C) (132-7005)CY5,130$36.75$19.00$18.00$16.00$15.00$10.00
4Hydro mulch seed (permanent_urban_sandy) (164-7019)SY1,047$0.75$2.50$3.00$3.00$3.85$3.00
5Vegetative watering (168-7001)TGL9$20.00$116.00$35.00$750.00$1,000.00$172.00
6Soil retention blankets (CL 1) (type B) (169-7043)SY1,450$2.00$4.00$7.00$4.60$1.20$4.50
7FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176)CY1,629$98.50$91.00$146.00$110.00$100.00$135.00
8Lime (com or QK)(slurry) or QK(dry) (260-7001)TON117$425.00$355.30$342.00$375.00$453.33$438.00
9Lime TRT (existing material)(8") (260-7007)SY4,071$8.00$7.40$10.00$10.00$9.60$14.00
10Cement (275-7001)TON35$236.00$350.00$228.00$365.00$321.33$261.00
11Cement TRT (new base)(6") (275-7010)SY2,556$2.75$6.00$7.00$9.50$8.67$7.00
12Prime coat (MC-30) (310-7004)GAL383$5.25$6.70$8.00$7.00$6.50$12.00
13Asphalt (HFRS-2) (316-7013)GAL498$4.00$20.00$8.00$6.00$5.00$4.50
14Aggregate (type-PB, GR-3 or 3S)(sac-B) (316-7209)CY12$82.00$500.00$634.00$1,300.00$1,084.89$674.00
15D-GR HMA type-B PG64-22 (341-7001)TON351$107.00$192.00$191.00$280.00$226.86$166.00
16D-GR HMA type D PG76-22 (341-7056)TON562$107.50$230.00$279.00$290.00$234.42$225.00
17Tack coat (341-7082)GAL127$4.00$11.00$16.00$4.50$3.75$4.50
18Concrete pavement (CRCP) (10") (360-7004)SY2,452$101.75$105.00$101.00$125.00$100.00$147.00
19Cem stabil BKFL (400-7010)CY146$157.00$177.00$122.00$500.00$220.00$171.00
20Temporary special shoring (403-7001)SF3,502$31.75$97.00$98.00$60.00$38.00$105.00
21Sheet piling (AZ-40) (407-7021)SF28,133$75.00$59.00$79.00$72.50$111.37$66.00
22Prestressed concrete pil (24 in SQ) (409-7004)LF6,846$200.00$187.00$383.00$235.00$356.71$283.00
23Class C concrete (abutment) (420-7012)CY67.20$2,000.00$1,150.00$1,970.00$2,250.00$2,766.13$5,240.00
24Class C concrete (cap) (420-7022)CY444$2,000.00$900.00$2,201.00$2,250.00$2,993.62$4,590.00
25Class C concrete (miscellaneous) (420-7067)CY117.20$1,200.00$775.00$1,590.00$2,000.00$1,452.83$2,130.00
26Reinforced concrete slab (422-7001)SF72,800$30.00$28.00$33.00$32.00$34.28$52.85
27Bridge median (422-7011)SF3,640$20.00$26.00$12.00$18.00$8.85$47.00
28Approach slab (422-7013)CY149.20$1,000.00$675.00$1,542.00$1,400.00$1,585.09$1,260.00
29Prestressed concrete girder (TX28) (425-7001)LF9,035.17$200.00$172.00$277.00$300.00$272.89$311.00
30Riprap (concrete)(6 in) (432-7003)CY274$675.00$626.00$716.00$600.00$520.00$776.00
31Riprap (mow strip)(4 in) (432-7013)CY6$633.00$872.00$819.00$750.00$500.00$895.00
32Riprap (stone protection)(18 in) (432-7043)CY193$200.00$256.00$369.00$400.00$355.00$271.00
33STR steel (miscellaneous non-bridge) (442-7007)LB1,988$25.00$19.00$28.00$22.00$25.00$17.00
34Rail (type C221) (450-7032)LF3,720$200.00$107.00$138.00$150.00$116.62$199.00
35Rail (type PR11) (450-7044)LF961$125.00$87.00$107.00$100.00$84.23$166.00
36Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF480$280.00$187.00$241.00$225.00$206.00$263.00
37Removing structure (bridge 500 - 999 FT length) (496-7011)EACH1$80,000$1,600,000$929,789$900,000$259,000$1,687,000
38Mobilization (500-7001)LS1$850,000$2,100,000$2,017,349$2,100,000$2,714,616$2,800,500
39Barricades, signs and traffic handling (502-7001)MO33$6,050.00$15,500$6,230.00$10,000$40,000$6,270.00
40Portable changeable message sign (503-7002)EACH2$8,500.00$17,500$15,531$35,000$15,000$31,800
41TMA (stationary) (505-7001)DAY170$155.00$287.00$349.00$700.00$582.35$402.00
42Construction exits (install) (type 1) (506-7020)SY400$38.00$48.00$49.00$60.00$62.00$21.00
43Construction exits (remove) (506-7024)SY400$12.00$20.00$10.00$14.00$32.00$7.50
44Construction perimeter fence (506-7034)LF2,682$5.50$7.00$6.00$8.00$6.25$5.00
45Temporary sediment control fence (install) (506-7039)LF2,803$5.00$5.99$7.00$8.00$3.85$6.00
46Temporary sediment control fence (remove) (506-7041)LF2,803$1.50$2.00$3.00$1.00$2.00$1.50
47Biodegradable erosion control logs (install) (8") (506-7043)LF60$6.00$20.00$11.00$12.00$8.25$11.00
48Biodegradable erosion control logs (remove) (506-7046)LF60$2.00$5.00$3.00$2.50$3.25$2.50
49Constructing detours (508-7001)SY1,972$82.00$150.00$116.00$180.00$121.67$106.00
50Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF3,847$27.50$41.30$43.00$95.00$105.00$23.00
51Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF100$55.00$50.00$44.00$100.00$105.00$23.00
52Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF6,525$11.00$9.00$15.00$10.50$7.50$13.00
53Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF220$12.00$11.00$16.00$10.50$7.50$13.00
54Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF3,847$11.00$21.00$14.00$20.00$20.00$15.00
55Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF100$20.00$30.00$15.00$20.00$20.00$15.00
56Concrete curb (type II) (529-7002)LF443$31.25$16.00$9.00$37.00$25.00$24.00
57Concrete sidewalks (4") (531-7001)SY1,172$75.00$57.00$69.00$110.00$76.00$94.00
58Concrete median (536-7002)SY1,008$69.00$75.00$104.00$112.00$78.00$107.00
59Metal W-beam guard fence (timber post) (540-7001)LF200$26.00$25.50$31.00$40.00$52.00$39.00
60Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,500.00$2,000.00$3,511.00$3,000.00$2,300.00$2,880.00
61Remove metal beam guard fence (542-7001)LF1,668$3.00$5.00$5.00$4.00$15.00$8.00
62Guardrail end treatment (install) (544-7001)EACH4$3,409.00$3,375.00$4,144.00$5,100.00$4,600.00$5,270.00
63Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH11$945.00$925.00$960.00$1,250.00$918.00$1,210.00
64Remove SM RD SN sup&AM (644-7073)EACH10$110.00$55.00$270.00$75.00$75.00$72.00
65Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH18$70.00$45.00$51.00$61.00$56.00$59.00
66Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH6$35.00$45.00$68.00$81.00$56.00$78.00
67Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF3,520$0.50$0.52$1.00$0.75$0.75$0.70
68Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF3,520$0.60$0.52$1.00$0.75$0.75$0.70
69Work zone pavement marking removing (W)6"(solid) (662-7068)LF15,113$0.75$0.36$1.00$0.50$1.50$0.45
70Work zone pavement marking removing (Y)6"(solid) (662-7100)LF7,694$0.90$0.36$1.00$0.50$1.50$0.45
71Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF301$7.50$5.00$6.00$7.00$10.00$6.50
72Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF3,320$0.50$1.85$2.00$2.60$1.50$2.50
73Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF4,354$0.50$1.85$2.00$2.60$1.50$2.50
74Reflectorized pavement marker type II-A-A (672-7004)EACH111$4.00$7.50$8.00$10.00$5.50$9.80
75Pavement surface preparation for marking (6") (678-7002)LF7,674$0.50$0.10$0.50$0.14$0.50$0.15
76Pavement surface preparation for marking (24") (678-7008)LF111$1.00$0.50$0.50$0.70$2.00$0.65
77Temporary construction access (4006-7001)LS1$2,750,000$4,500,000$4,153,949$4,500,000$4,288,791$6,000,000
TxDOT contract A00186409: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy