TxDOT contract A00176646 bid tabulation
Bridge Replacement, OCEAN DR (On Ocean Drive to At Cayo Del Oso Bridge). Let by Texas DOT on May 6, 2026, Nueces, Corpus Christi District. 7 bids received; low bid $14,868,485 by Anderson Columbia Co., Inc., +5.9% against the engineer's estimate of $14,038,391.
- Owner
- Texas DOT
- Letting
- 06 MAY 2026
- Pay items
- 75
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $14,868,485 | Low | +6.0% |
| 2 | J E Construction Services, LLC | $16,091,852 | +8.0% | +15% |
| 3 | McMillen, Inc. | $16,945,201 | +14% | +21% |
| 4 | Orion Construction, LLC | $17,320,000 | +16% | +23% |
| 5 | Ragle Construction, Inc. | $17,943,556 | +21% | +28% |
| 6 | Copasa Inc | $20,053,645 | +35% | +43% |
| 7 | Reytec Construction Resources, Inc. | $20,619,504 | +39% | +47% |
Engineer's estimate: $14,038,391.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Anderson Columbia Co., Inc. | 2. J E Construction Services, LLC | 3. McMillen, Inc. | 4. Orion Construction, LLC | 5. Ragle Construction, Inc. | 6. Copasa Inc |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 13 | $10,000 | $1,480.00 | $49,630 | $25,000 | $115,000 | $135,000 | $154,259 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 1,721 | $20.00 | $18.00 | $29.00 | $30.00 | $80.00 | $15.00 | $17.25 |
| 3 | Removing stab base & asphalt pavement(12"-27") (105-7130) | SY | 7,832 | $15.00 | $12.00 | $12.00 | $14.00 | $40.00 | $9.00 | $33.33 |
| 4 | Excavation (roadway) (110-7001) | CY | 4,961 | $15.00 | $11.00 | $18.00 | $30.00 | $22.00 | $23.00 | $18.67 |
| 5 | Embankment (final)(OC)(type C) (132-7005) | CY | 2,349 | $35.00 | $15.00 | $14.00 | $55.00 | $38.00 | $14.00 | $29.33 |
| 6 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 3,504 | $0.40 | $1.50 | $5.00 | $2.00 | $2.00 | $1.50 | $1.50 |
| 7 | Broadcast seed (temporary_warm) (164-7005) | SY | 876 | $0.20 | $3.95 | $3.00 | $5.00 | $3.60 | $3.50 | $3.50 |
| 8 | Broadcast seed (temporary_cool) (164-7006) | SY | 876 | $0.20 | $3.95 | $3.00 | $5.00 | $3.60 | $3.50 | $3.50 |
| 9 | Vegetative watering (168-7001) | TGL | 197 | $100.00 | $50.00 | $38.00 | $65.00 | $100.00 | $65.00 | $25.00 |
| 10 | Soil ret BLKT(SL_mod_sand_long) (169-7004) | SY | 3,504 | $1.10 | $1.75 | $4.00 | $2.00 | $2.30 | $1.65 | $1.65 |
| 11 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 28 | $35.00 | $50.00 | $41.00 | $260.00 | $200.00 | $350.00 | $133.33 |
| 12 | Prime coat (MC-30) (310-7004) | GAL | 1,794 | $5.25 | $7.70 | $9.00 | $7.00 | $7.50 | $8.00 | $7.00 |
| 13 | Asphalt(AC-15P, HFRS-2P or CRS-2P) (316-7070) | GAL | 8,451 | $4.00 | $4.00 | $9.00 | $5.00 | $5.50 | $7.00 | $5.00 |
| 14 | Aggregate (type-PB, GR-3 or 3S)(sac-B) (316-7209) | CY | 81 | $500.00 | $240.00 | $782.00 | $290.00 | $350.00 | $175.00 | $290.00 |
| 15 | Aggregate (type-PB, GR-4S or 4)(sac-B) (316-7212) | CY | 197 | $500.00 | $263.00 | $761.00 | $285.00 | $340.00 | $175.00 | $285.00 |
| 16 | D-GR HMA type-B sac-B PG70-22 (341-7007) | TON | 2,467 | $86.00 | $127.00 | $144.00 | $207.00 | $245.00 | $142.00 | $206.17 |
| 17 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 903 | $104.00 | $153.00 | $158.00 | $230.00 | $275.00 | $163.00 | $230.06 |
| 18 | Tack coat (341-7082) | GAL | 897 | $8.00 | $3.90 | $8.00 | $5.00 | $5.70 | $10.24 | $5.00 |
| 19 | Cem stabil BKFL (400-7010) | CY | 190 | $157.00 | $129.00 | $154.00 | $235.00 | $400.00 | $150.00 | $150.00 |
| 20 | Temporary special shoring (403-7001) | SF | 2,052 | $50.00 | $62.00 | $62.00 | $86.00 | $165.00 | $171.00 | $71.22 |
| 21 | Temporary special shoring (cofferdam) (403-7002) | SF | 2,100 | $50.00 | $35.00 | $184.00 | $68.00 | $60.00 | $105.00 | $64.45 |
| 22 | Prestressed concrete pil (18 in SQ) (409-7002) | LF | 252 | $220.00 | $232.00 | $178.00 | $457.00 | $190.00 | $118.00 | $145.27 |
| 23 | Prestressed concrete pil (24 in SQ) (409-7004) | LF | 7,194 | $250.00 | $213.00 | $191.00 | $200.00 | $205.00 | $201.00 | $162.20 |
| 24 | Class C concrete (abutment) (420-7012) | CY | 70.80 | $2,000.00 | $3,110.00 | $1,680.00 | $1,685.00 | $1,900.00 | $1,345.00 | $1,882.90 |
| 25 | Class C concrete (cap) (420-7022) | CY | 261 | $2,000.00 | $2,460.00 | $1,994.00 | $2,050.00 | $2,500.00 | $1,481.00 | $2,758.67 |
| 26 | Reinforced concrete slab (422-7001) | SF | 46,800 | $27.00 | $39.41 | $32.00 | $37.00 | $29.50 | $30.00 | $36.67 |
| 27 | Approach slab (422-7013) | CY | 93.20 | $1,500.00 | $1,280.00 | $1,429.00 | $1,000.00 | $1,100.00 | $915.00 | $1,690.21 |
| 28 | Prestressed concrete girder (TX34) (425-7002) | LF | 6,200.16 | $186.50 | $246.00 | $278.00 | $255.00 | $250.00 | $164.00 | $224.93 |
| 29 | Riprap (concrete)(4 in) (432-7001) | CY | 192 | $618.00 | $643.00 | $773.00 | $660.00 | $850.00 | $620.00 | $525.00 |
| 30 | Riprap (mow strip)(4 in) (432-7013) | CY | 115 | $576.00 | $606.00 | $703.00 | $625.00 | $900.00 | $610.00 | $557.75 |
| 31 | Riprap (stone protection)(24 in) (432-7045) | CY | 2,182 | $227.50 | $167.00 | $319.00 | $250.00 | $345.00 | $225.00 | $257.36 |
| 32 | Rail (type T551) (450-7016) | LF | 1,612 | $130.00 | $104.00 | $106.00 | $86.00 | $130.00 | $63.00 | $104.68 |
| 33 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 300 | $254.00 | $217.00 | $265.00 | $260.00 | $50.00 | $198.00 | $300.00 |
| 34 | Removing structure (bridge 500 - 999 FT length) (496-7011) | EACH | 1 | $1,000,000 | $1,658,000 | $1,463,420 | $1,638,000 | $2,100,000 | $1,500,000 | $1,994,843 |
| 35 | Mobilization (500-7001) | LS | 1 | $1,000,000 | $1,400,000 | $1,557,464 | $1,500,000 | $1,600,000 | $1,700,000 | $2,005,365 |
| 36 | Barricades, signs and traffic handling (502-7001) | MO | 27 | $6,000.00 | $4,650.00 | $3,290.00 | $52,000 | $15,000 | $25,000 | $51,991 |
| 37 | Portable changeable message sign (503-7002) | EACH | 2 | $8,500.00 | $27,800 | $13,210 | $24,000 | $36,280 | $25,000 | $17,367 |
| 38 | TMA (stationary) (505-7001) | DAY | 240 | $250.00 | $339.00 | $410.00 | $300.00 | $500.00 | $260.00 | $200.00 |
| 39 | Construction exits (install) (type 2) (506-7021) | SY | 620 | $33.00 | $29.00 | $54.00 | $45.00 | $60.00 | $50.00 | $36.00 |
| 40 | Construction exits (remove) (506-7024) | SY | 620 | $14.00 | $6.40 | $12.00 | $14.00 | $15.00 | $20.00 | $26.27 |
| 41 | Construction perimeter fence (506-7034) | LF | 940 | $5.75 | $7.00 | $32.00 | $4.00 | $12.00 | $6.25 | $6.25 |
| 42 | Temporary sediment control fence (install) (506-7039) | LF | 1,560 | $5.00 | $4.65 | $6.00 | $4.25 | $8.00 | $4.25 | $4.25 |
| 43 | Temporary sediment control fence (remove) (506-7041) | LF | 1,560 | $1.50 | $2.40 | $2.00 | $2.25 | $2.30 | $2.25 | $2.25 |
| 44 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 2,100 | $95.00 | $20.00 | $46.00 | $70.00 | $85.00 | $42.00 | $42.00 |
| 45 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $120.00 | $20.00 | $47.00 | $84.00 | $125.00 | $57.00 | $42.00 |
| 46 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 2,100 | $12.00 | $9.51 | $10.00 | $3.00 | $5.00 | $7.00 | $10.00 |
| 47 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 40 | $12.00 | $9.51 | $11.00 | $80.00 | $5.00 | $9.00 | $10.00 |
| 48 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 2,100 | $21.00 | $13.00 | $14.00 | $21.00 | $20.00 | $22.00 | $15.00 |
| 49 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 40 | $21.00 | $13.00 | $15.00 | $21.00 | $50.00 | $36.00 | $15.00 |
| 50 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,050 | $26.00 | $34.00 | $32.00 | $32.00 | $35.00 | $26.03 | $29.85 |
| 51 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,500.00 | $2,380.00 | $4,130.00 | $2,200.00 | $2,800.00 | $2,009.00 | $2,110.20 |
| 52 | Remove metal beam guard fence (542-7001) | LF | 2,235 | $3.00 | $3.40 | $5.00 | $10.00 | $4.00 | $3.50 | $2.00 |
| 53 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,409.00 | $4,020.00 | $4,220.00 | $4,100.00 | $4,900.00 | $3,583.00 | $3,985.50 |
| 54 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $500.00 | $376.00 | $296.00 | $550.00 | $340.00 | $250.00 | $250.00 |
| 55 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 820 | $12.00 | $13.00 | $20.00 | $4.50 | $15.00 | $25.00 | $20.00 |
| 56 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $945.00 | $1,250.00 | $1,000.00 | $1,650.00 | $1,300.00 | $850.00 | $805.00 |
| 57 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $840.00 | $1,620.00 | $1,296.00 | $2,400.00 | $1,700.00 | $1,100.00 | $890.00 |
| 58 | Remove SM RD SN sup&AM (644-7073) | EACH | 4 | $110.00 | $125.00 | $780.00 | $207.00 | $150.00 | $125.00 | $75.00 |
| 59 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 18 | $70.00 | $51.00 | $6.00 | $25.00 | $35.00 | $95.00 | $35.00 |
| 60 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 20 | $35.00 | $51.00 | $113.00 | $35.00 | $50.00 | $95.00 | $35.00 |
| 61 | RE PV marking type I(black)6"(shadow)(090MIL) (666-7137) | LF | 410 | $0.70 | $2.85 | $3.00 | $5.00 | $2.50 | $2.50 | $5.00 |
| 62 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 16,700 | $0.30 | $0.32 | $1.00 | $0.70 | $0.28 | $0.28 | $0.69 |
| 63 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 10,000 | $0.30 | $0.32 | $1.00 | $0.70 | $0.28 | $0.28 | $0.69 |
| 64 | Pavement sler 6" (666-7347) | LF | 4,100 | $0.20 | $0.59 | $1.00 | $0.35 | $0.52 | $0.52 | $0.35 |
| 65 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 2,400 | $0.90 | $1.00 | $1.00 | $0.90 | $0.88 | $0.88 | $0.90 |
| 66 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 9,600 | $0.60 | $0.78 | $1.00 | $0.90 | $0.68 | $0.68 | $0.90 |
| 67 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 12,000 | $0.60 | $0.78 | $1.00 | $0.90 | $0.68 | $0.68 | $0.90 |
| 68 | Reflectorized pavement marker type I-C (672-7002) | EACH | 127 | $3.75 | $8.55 | $9.00 | $7.00 | $7.50 | $7.50 | $6.50 |
| 69 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 160 | $4.00 | $8.55 | $9.00 | $6.50 | $7.50 | $7.50 | $6.50 |
| 70 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,560 | $0.20 | $1.80 | $12.00 | $5.00 | $0.75 | $0.75 | $2.00 |
| 71 | Eliminating existing PM & markers (6") (677-7002) | LF | 3,600 | $1.00 | $1.80 | $13.00 | $5.00 | $0.95 | $0.95 | $2.00 |
| 72 | Pavement surface preparation for marking (6") (678-7002) | LF | 24,410 | $2.00 | $0.06 | $0.20 | $0.10 | $0.05 | $0.05 | $0.05 |
| 73 | Temporary construction access (4006-7001) | LS | 1 | $4,000,000 | $3,417,600 | $3,431,519 | $3,150,000 | $2,125,000 | $5,000,000 | $4,185,512 |
| 74 | Furnish and install FTB (5033-7001) | LF | 200 | $276.00 | $177.00 | $81.00 | $313.00 | $275.00 | $86.00 | $250.00 |
| 75 | Remove FTB (5033-7002) | LF | 200 | $15.00 | $8.85 | $54.00 | $45.00 | $150.00 | $32.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.