TxDOT contract A00205634 bid tabulation
Construct New Road, SS 394 (IH 35E to FM 877). Let by Texas DOT on February 4, 2026, Ellis, Dallas District. 11 bids received; low bid $18,932,077 by Mario Sinacola & Sons Excavating, Inc., -25% against the engineer's estimate of $25,389,268.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 169
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc. | $18,932,077 | Low | -25% |
| 2 | RPM Xconstruction, LLC | $20,400,001 | +8.0% | -20% |
| 3 | Webber, LLC | $21,710,736 | +15% | -14% |
| 4 | A. L. Helmcamp, Inc. | $22,102,316 | +17% | -13% |
| 5 | Texas Materials Group, Inc. | $22,915,256 | +21% | -10% |
| 6 | Ed Bell Construction Company | $22,976,475 | +21% | -10% |
| 7 | Harper Brothers Construction LLC | $23,570,223 | +24% | -7.0% |
| 8 | Tiseo Paving Co. | $23,913,483 | +26% | -6.0% |
| 9 | Grey Sky Construction LLC | $25,363,689 | +34% | 0.0% |
| 10 | Indus Road & Bridge, Inc. | $30,826,316 | +63% | +21% |
| 11 | Copasa Inc | $34,327,526 | +81% | +35% |
Engineer's estimate: $25,389,268.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Mario Sinacola & Sons Excavating, Inc. | 2. RPM Xconstruction, LLC | 3. Webber, LLC | 4. A. L. Helmcamp, Inc. | 5. Texas Materials Group, Inc. | 6. Ed Bell Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 90 | $14,480 | $6,000.00 | $5,000.00 | $22,144 | $1,500.00 | $800.00 | $9,450.00 |
| 2 | Remove (8"-12") TRT/untrt base & asphalt pavement (105-7008) | SY | 2,827 | $30.00 | $10.00 | $7.00 | $13.30 | $20.00 | $9.00 | $10.00 |
| 3 | Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012) | SY | 967 | $32.00 | $14.00 | $12.50 | $19.02 | $22.00 | $13.00 | $10.00 |
| 4 | Remove (18"-22") TRT/untrt base & asphalt pavement (105-7018) | SY | 375 | $35.00 | $18.00 | $16.50 | $23.31 | $30.00 | $26.00 | $10.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 40,026 | $18.00 | $5.00 | $5.45 | $12.74 | $8.00 | $5.00 | $7.00 |
| 6 | Embankment (final)(DC)(type C) (132-7006) | CY | 131,279 | $25.00 | $15.00 | $18.00 | $15.90 | $14.00 | $23.75 | $20.00 |
| 7 | Compost manuf topsoil (4") (161-7002) | SY | 124,476 | $1.50 | $0.88 | $1.60 | $1.59 | $1.25 | $1.50 | $0.94 |
| 8 | Block sodding (162-7002) | SY | 82,169 | $3.50 | $3.46 | $3.60 | $3.46 | $4.20 | $3.46 | $3.68 |
| 9 | Drill seed (permanent_urban_clay) (164-7012) | SY | 35,816 | $1.00 | $0.13 | $0.15 | $0.13 | $0.21 | $0.13 | $0.14 |
| 10 | Drill seed (temporary_warm_cool) (164-7015) | SY | 124,476 | $0.40 | $0.13 | $0.13 | $0.13 | $0.15 | $0.13 | $0.14 |
| 11 | Vegetative watering (168-7001) | TGL | 36,069 | $1.00 | $0.10 | $1.00 | $7.32 | $3.50 | $0.01 | $1.00 |
| 12 | Soil ret BLKT (OPT1) (169-7041) | SY | 6,538 | $1.00 | $0.60 | $0.61 | $0.59 | $2.10 | $0.59 | $0.63 |
| 13 | FL BS (compacted in place)(type D GR 1-2) (6") (247-7056) | SY | 4,613 | $25.00 | $19.00 | $18.50 | $16.65 | $22.00 | $21.00 | $20.00 |
| 14 | Lime (com or QK)(slurry) (260-7005) | TON | 2,028 | $325.00 | $295.00 | $318.00 | $294.75 | $300.00 | $300.00 | $310.00 |
| 15 | Lime TRT (existing material)(10") (260-7008) | SY | 75,460 | $5.00 | $5.00 | $4.50 | $3.59 | $3.25 | $4.90 | $4.00 |
| 16 | Lime TRT (existing material)(12") (260-7009) | SY | 4,613 | $5.00 | $10.00 | $13.00 | $10.17 | $6.00 | $5.30 | $10.00 |
| 17 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 1,384 | $8.00 | $7.00 | $7.20 | $5.50 | $5.00 | $5.50 | $7.46 |
| 18 | SP mixes SP-B PG64-22 (344-7001) | TON | 17,619 | $100.00 | $111.50 | $115.00 | $105.00 | $110.00 | $141.00 | $118.69 |
| 19 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 517 | $160.00 | $164.00 | $169.00 | $170.00 | $230.00 | $230.00 | $174.66 |
| 20 | Tack coat (344-7077) | GAL | 283 | $5.00 | $10.00 | $10.30 | $9.35 | $5.00 | $9.35 | $10.65 |
| 21 | Concrete pavement (CRCP) (10") (360-7004) | SY | 67,700 | $93.00 | $70.50 | $82.00 | $73.42 | $114.00 | $95.70 | $89.00 |
| 22 | Trench excavation protection (402-7001) | LF | 9,278 | $10.00 | $1.00 | $1.00 | $3.00 | $5.50 | $1.00 | $2.00 |
| 23 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 11 | $700.00 | $682.80 | $310.00 | $389.00 | $313.00 | $297.73 | $414.29 |
| 24 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 52 | $800.00 | $702.74 | $335.00 | $487.00 | $340.00 | $323.89 | $518.66 |
| 25 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 132 | $1,000.00 | $805.53 | $525.00 | $565.00 | $535.00 | $509.15 | $601.73 |
| 26 | Class A concrete (flume) (420-7006) | CY | 10 | $1,000.00 | $1,000.00 | $560.00 | $910.42 | $800.00 | $680.00 | $1,250.00 |
| 27 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 760 | $200.00 | $192.00 | $165.00 | $107.42 | $218.00 | $225.00 | $250.00 |
| 28 | Rail (handrail)(type F) (450-7063) | LF | 50 | $160.00 | $200.00 | $320.00 | $200.00 | $257.00 | $321.00 | $250.00 |
| 29 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 316 | $500.00 | $340.00 | $330.00 | $390.00 | $432.00 | $440.00 | $418.39 |
| 30 | Concrete box culvert (12 FT X 10 FT) (462-7053) | LF | 148 | $3,000.00 | $1,240.00 | $1,550.00 | $1,365.00 | $1,602.00 | $2,250.00 | $1,600.76 |
| 31 | RC pipe (CL III)(18 in) (464-7003) | LF | 2,653 | $70.00 | $65.00 | $52.50 | $83.00 | $80.00 | $63.00 | $89.11 |
| 32 | RC pipe (CL III)(24 in) (464-7005) | LF | 6,515 | $85.00 | $76.00 | $67.50 | $101.00 | $97.00 | $81.00 | $106.50 |
| 33 | RC pipe (CL III)(30 in) (464-7007) | LF | 2,696 | $120.00 | $107.00 | $89.00 | $130.00 | $119.00 | $108.00 | $138.02 |
| 34 | RC pipe (CL III)(36 in) (464-7009) | LF | 2,364 | $155.00 | $130.00 | $116.50 | $161.00 | $151.00 | $144.00 | $176.05 |
| 35 | Inlet (complete)(pcu)(3FT)(none) (465-7029) | EACH | 37 | $9,000.00 | $9,700.00 | $6,864.00 | $6,800.00 | $7,560.00 | $5,455.00 | $7,335.46 |
| 36 | Inlet (complete)(pcu)(3FT)(left) (465-7030) | EACH | 36 | $9,100.00 | $10,500 | $7,898.00 | $7,000.00 | $8,038.00 | $6,630.00 | $7,444.13 |
| 37 | Inlet (complete)(pcu)(3FT)(right) (465-7031) | EACH | 37 | $9,100.00 | $10,000 | $7,991.00 | $7,300.00 | $7,969.00 | $6,510.00 | $7,878.83 |
| 38 | Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158) | EACH | 4 | $9,000.00 | $7,250.00 | $5,648.00 | $5,000.00 | $6,650.00 | $4,170.00 | $5,651.02 |
| 39 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 1 | $10,000 | $6,500.00 | $5,890.00 | $4,800.00 | $13,315 | $5,500.00 | $5,216.33 |
| 40 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 1 | $15,000 | $17,300 | $9,990.00 | $35,000 | $26,675 | $27,000 | $34,232 |
| 41 | Wingwall (FW - 0) (HW=7 FT) (466-7149) | EACH | 1 | $25,000 | $27,000 | $16,450 | $25,000 | $25,560 | $25,000 | $25,538 |
| 42 | Wingwall (PW - 1) (HW=12 FT) (466-7182) | EACH | 2 | $60,000 | $60,000 | $61,900 | $60,000 | $68,880 | $75,000 | $57,597 |
| 43 | Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305) | EACH | 1 | $1,500.00 | $4,250.00 | $1,526.00 | $1,600.00 | $1,275.00 | $860.00 | $1,847.44 |
| 44 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 1 | $1,500.00 | $4,375.00 | $1,670.00 | $1,900.00 | $1,350.00 | $980.00 | $1,956.12 |
| 45 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 1 | $2,000.00 | $2,400.00 | $2,055.00 | $2,000.00 | $1,430.00 | $1,015.00 | $2,064.80 |
| 46 | Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345) | EACH | 1 | $4,000.00 | $5,275.00 | $2,900.00 | $2,300.00 | $1,765.00 | $1,850.00 | $2,499.49 |
| 47 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 1 | $4,000.00 | $6,250.00 | $3,245.00 | $2,650.00 | $2,000.00 | $2,130.00 | $2,608.16 |
| 48 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 1 | $6,000.00 | $6,800.00 | $5,320.00 | $4,100.00 | $3,060.00 | $5,000.00 | $4,346.94 |
| 49 | Adjusting inlets (479-7002) | EACH | 1 | $4,000.00 | $5,000.00 | $4,100.00 | $4,500.00 | $3,650.00 | $5,300.00 | $6,303.06 |
| 50 | Clean existing culverts (480-7001) | EACH | 4 | $6,000.00 | $5,000.00 | $5,900.00 | $10,000 | $2,890.00 | $3,200.00 | $7,498.47 |
| 51 | Removing structure (headwall) (496-7006) | EACH | 1 | $1,600.00 | $2,500.00 | $1,825.00 | $1,500.00 | $3,165.00 | $1,200.00 | $1,630.10 |
| 52 | Removing structure (pipe) (496-7007) | LF | 2 | $70.00 | $50.00 | $190.00 | $157.00 | $260.00 | $300.00 | $170.62 |
| 53 | Mobilization (500-7001) | LS | 1 | $2,302,350 | $1,842,000 | $2,000,000 | $2,050,000 | $1,575,000 | $2,150,000 | $2,129,000 |
| 54 | Barricades, signs and traffic handling (502-7001) | MO | 21 | $12,000 | $4,000.00 | $2,000.00 | $25,000 | $10,100 | $4,300.00 | $21,000 |
| 55 | TMA (stationary) (505-7001) | DAY | 50 | $250.00 | $710.00 | $448.00 | $243.49 | $350.00 | $100.00 | $210.00 |
| 56 | TMA (mobile operation) (505-7003) | DAY | 5 | $150.00 | $1,100.00 | $1,160.00 | $807.87 | $450.00 | $450.00 | $1,000.00 |
| 57 | Rock filter dams (install) (type 2) (506-7002) | LF | 420 | $40.00 | $47.50 | $43.25 | $39.83 | $41.00 | $39.83 | $60.00 |
| 58 | Rock filter dams (install) (type 3) (506-7003) | LF | 150 | $80.00 | $65.00 | $77.00 | $71.01 | $71.00 | $71.01 | $135.00 |
| 59 | Rock filter dams (remove) (506-7011) | LF | 570 | $20.00 | $5.00 | $19.25 | $17.71 | $13.50 | $17.71 | $25.00 |
| 60 | Construction exits (install) (type 1) (506-7020) | SY | 247 | $40.00 | $29.00 | $40.20 | $37.01 | $37.00 | $37.01 | $40.00 |
| 61 | Construction exits (remove) (506-7024) | SY | 247 | $14.00 | $5.00 | $13.80 | $12.70 | $10.00 | $12.70 | $10.00 |
| 62 | Temporary sediment control fence (install) (506-7039) | LF | 14,255 | $5.00 | $1.65 | $3.60 | $3.29 | $4.20 | $3.29 | $4.00 |
| 63 | Temporary sediment control fence (remove) (506-7041) | LF | 14,255 | $1.50 | $0.10 | $0.90 | $0.82 | $0.85 | $0.82 | $1.00 |
| 64 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 4,507 | $6.00 | $3.55 | $7.10 | $6.55 | $5.25 | $6.55 | $6.50 |
| 65 | Biodegradable erosion control logs (remove) (506-7046) | LF | 4,507 | $3.00 | $0.25 | $1.05 | $0.96 | $0.30 | $0.96 | $1.00 |
| 66 | Constructing detours (508-7001) | SY | 1,043 | $110.00 | $90.00 | $97.00 | $110.54 | $65.00 | $80.00 | $125.00 |
| 67 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 2,430 | $80.00 | $18.00 | $48.00 | $14.64 | $50.00 | $37.81 | $50.00 |
| 68 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 420 | $50.00 | $30.00 | $80.00 | $29.94 | $50.00 | $43.21 | $100.00 |
| 69 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $70.00 | $30.00 | $80.00 | $115.79 | $50.00 | $43.21 | $125.00 |
| 70 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 720 | $20.00 | $10.00 | $5.00 | $13.89 | $31.00 | $16.21 | $15.00 |
| 71 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 220 | $15.00 | $10.00 | $5.00 | $22.82 | $26.00 | $21.61 | $30.00 |
| 72 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 40 | $20.00 | $10.00 | $13.50 | $47.84 | $47.00 | $21.61 | $40.00 |
| 73 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 2,430 | $25.00 | $5.00 | $5.30 | $8.26 | $45.00 | $21.61 | $15.00 |
| 74 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 420 | $20.00 | $5.00 | $9.10 | $20.76 | $16.00 | $32.41 | $30.00 |
| 75 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 40 | $22.00 | $5.00 | $21.30 | $60.80 | $57.00 | $32.41 | $40.00 |
| 76 | Concrete curb (mono) (type II) (529-7007) | LF | 31,290 | $5.00 | $1.50 | $3.36 | $2.91 | $7.00 | $4.00 | $4.25 |
| 77 | Driveways (concrete) (530-7006) | SY | 441 | $120.00 | $95.00 | $121.50 | $104.82 | $160.00 | $130.00 | $100.00 |
| 78 | Driveways (ACP) (530-7010) | SY | 106 | $170.00 | $90.00 | $90.25 | $69.16 | $400.00 | $106.00 | $114.71 |
| 79 | Concrete sidewalks (5") (531-7002) | SY | 18,333 | $70.00 | $58.00 | $72.00 | $50.79 | $56.00 | $88.00 | $75.00 |
| 80 | Curb ramps (type 1) (531-7015) | SY | 93 | $150.00 | $350.00 | $245.00 | $309.80 | $95.00 | $220.00 | $250.00 |
| 81 | Curb ramps (type 7) (531-7020) | SY | 131 | $150.00 | $350.00 | $141.00 | $289.82 | $78.00 | $220.00 | $250.00 |
| 82 | Concrete median (536-7002) | SY | 804 | $110.00 | $75.00 | $83.00 | $121.02 | $104.00 | $145.00 | $85.00 |
| 83 | Concrete median (mono nose) (536-7006) | SY | 67 | $400.00 | $75.00 | $97.00 | $286.84 | $115.00 | $145.00 | $175.00 |
| 84 | Right of way markers (538-7001) | EACH | 39 | $600.00 | $415.00 | $432.00 | $491.50 | $335.00 | $500.00 | $441.98 |
| 85 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $2,000.00 | $1,100.00 | $1,065.00 | $1,025.00 | $1,095.00 | $2,160.74 | $2,000.00 |
| 86 | Crash cushion attenuator (remove) (545-7004) | EACH | 6 | $1,500.00 | $750.00 | $820.00 | $790.00 | $1,095.00 | $1,080.37 | $1,000.00 |
| 87 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 6 | $10,000 | $6,000.00 | $7,975.00 | $7,669.00 | $8,950.00 | $10,264 | $8,000.00 |
| 88 | Relocate existing mailbox (560-7012) | EACH | 1 | $400.00 | $500.00 | $235.00 | $225.00 | $577.00 | $310.00 | $239.63 |
| 89 | Remove RD IL asm (trans-base) (610-7009) | EACH | 1 | $2,500.00 | $903.46 | $845.00 | $1,002.53 | $859.00 | $818.22 | $1,065.00 |
| 90 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 110 | $20.00 | $13.84 | $19.30 | $10.00 | $19.75 | $18.73 | $10.65 |
| 91 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 243 | $35.00 | $40.67 | $28.25 | $25.89 | $28.75 | $27.41 | $27.57 |
| 92 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 361 | $30.00 | $17.69 | $21.60 | $12.55 | $22.00 | $20.93 | $13.37 |
| 93 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 197 | $40.00 | $19.29 | $23.20 | $19.87 | $23.50 | $22.49 | $21.16 |
| 94 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 972 | $50.00 | $54.05 | $31.65 | $39.54 | $32.50 | $30.71 | $42.11 |
| 95 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 102 | $29.00 | $17.26 | $20.65 | $11.18 | $21.00 | $20.02 | $11.91 |
| 96 | Electrical conductor (no.12) insulated (620-7004) | LF | 880 | $2.00 | $1.66 | $2.50 | $1.00 | $2.50 | $2.40 | $1.07 |
| 97 | Electrical conductor (no.8) insulated (620-7008) | LF | 3,590 | $3.00 | $2.40 | $3.55 | $1.85 | $3.60 | $3.46 | $1.97 |
| 98 | Electrical conductor (no.6) bare (620-7009) | LF | 1,859 | $3.00 | $2.32 | $3.75 | $2.21 | $3.80 | $3.62 | $2.35 |
| 99 | Electrical conductor (no.6) insulated (620-7010) | LF | 220 | $3.00 | $2.76 | $4.10 | $2.55 | $4.20 | $3.97 | $2.72 |
| 100 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $2,000.00 | $1,663.57 | $1,640.00 | $990.00 | $1,675.00 | $1,592.80 | $1,054.35 |
| 101 | Ground box type C (162911)W/apron (624-7006) | EACH | 3 | $2,200.00 | $2,012.83 | $1,705.00 | $1,258.00 | $1,740.00 | $1,656.25 | $1,339.77 |
| 102 | Ground box type D (162922)W/apron (624-7008) | EACH | 10 | $2,500.00 | $1,772.96 | $1,715.00 | $1,440.00 | $1,750.00 | $1,663.29 | $1,533.60 |
| 103 | Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190) | EACH | 3 | $12,000 | $9,880.68 | $12,445 | $9,760.00 | $12,700 | $12,081 | $10,394 |
| 104 | Aluminum signs (type A) (636-7001) | SF | 222 | $75.00 | $31.06 | $35.00 | $38.21 | $61.00 | $41.00 | $35.52 |
| 105 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 32 | $1,300.00 | $615.00 | $640.00 | $655.00 | $788.00 | $670.00 | $654.98 |
| 106 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 1 | $800.00 | $895.00 | $930.70 | $688.00 | $840.00 | $1,087.00 | $953.18 |
| 107 | Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005) | EACH | 1 | $1,500.00 | $775.00 | $806.00 | $728.00 | $840.00 | $874.00 | $825.38 |
| 108 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,400.00 | $1,110.00 | $1,155.00 | $1,079.00 | $1,260.00 | $953.00 | $1,182.15 |
| 109 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 3 | $2,000.00 | $1,360.00 | $1,415.00 | $1,273.00 | $1,260.00 | $1,160.00 | $1,448.40 |
| 110 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 11,120 | $1.50 | $0.75 | $0.85 | $0.75 | $0.79 | $0.75 | $1.01 |
| 111 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 32 | $1.50 | $5.75 | $6.50 | $5.75 | $6.04 | $5.75 | $3.20 |
| 112 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 9,935 | $1.50 | $0.75 | $0.85 | $0.75 | $0.79 | $0.75 | $1.01 |
| 113 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 590 | $1.50 | $1.75 | $2.00 | $1.75 | $1.84 | $1.75 | $1.01 |
| 114 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 6,546 | $2.00 | $0.86 | $1.00 | $0.86 | $0.90 | $0.86 | $1.01 |
| 115 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,698 | $10.00 | $6.50 | $7.35 | $6.50 | $6.83 | $6.50 | $6.66 |
| 116 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 32 | $200.00 | $125.00 | $141.20 | $125.00 | $131.00 | $125.00 | $159.75 |
| 117 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 3 | $300.00 | $175.00 | $198.00 | $175.00 | $183.00 | $175.00 | $266.25 |
| 118 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 24 | $200.00 | $145.00 | $164.00 | $145.00 | $152.00 | $145.00 | $170.40 |
| 119 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 990 | $8.00 | $6.50 | $7.35 | $6.50 | $6.80 | $6.50 | $6.66 |
| 120 | Pavement sler 6" (666-7347) | LF | 42,370 | $0.20 | $0.16 | $0.18 | $0.16 | $0.17 | $0.16 | $0.27 |
| 121 | Pavement sler 8" (666-7348) | LF | 5,559 | $0.30 | $0.23 | $0.26 | $0.23 | $0.24 | $0.23 | $0.32 |
| 122 | Pavement sler 24" (666-7352) | LF | 3,153 | $1.00 | $1.35 | $1.52 | $1.35 | $1.40 | $1.35 | $2.13 |
| 123 | Pavement sler (arrow) (666-7353) | EACH | 3 | $30.00 | $25.00 | $28.25 | $25.00 | $26.00 | $25.00 | $53.25 |
| 124 | Pavement sler (word) (666-7354) | EACH | 10 | $30.00 | $31.00 | $35.00 | $31.00 | $33.00 | $31.00 | $63.90 |
| 125 | Pavement sler (double arrow) (666-7356) | EACH | 2 | $50.00 | $36.00 | $40.65 | $36.00 | $38.00 | $36.00 | $79.88 |
| 126 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 4,000 | $0.90 | $0.64 | $0.72 | $0.64 | $0.67 | $0.64 | $0.55 |
| 127 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 22,583 | $1.10 | $0.57 | $0.65 | $0.57 | $0.60 | $0.57 | $0.55 |
| 128 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 26,517 | $1.10 | $0.57 | $0.65 | $0.57 | $0.60 | $0.57 | $0.55 |
| 129 | Reflectorized pavement marker type I-C (672-7002) | EACH | 132 | $6.00 | $3.95 | $4.45 | $3.95 | $4.15 | $3.95 | $6.12 |
| 130 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 403 | $8.00 | $3.95 | $4.45 | $3.95 | $4.15 | $3.95 | $6.12 |
| 131 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 766 | $6.00 | $3.95 | $4.45 | $3.95 | $4.15 | $3.95 | $6.12 |
| 132 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,083 | $0.60 | $0.50 | $0.55 | $0.50 | $0.53 | $0.50 | $0.69 |
| 133 | Eliminating existing PM & markers (24") (677-7008) | LF | 22 | $5.00 | $3.00 | $3.40 | $3.00 | $3.15 | $3.00 | $6.39 |
| 134 | Pavement surface preparation for marking (6") (678-7002) | LF | 53,100 | $0.50 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.16 |
| 135 | Pavement surface preparation for marking (8") (678-7004) | LF | 7,136 | $0.60 | $0.02 | $0.02 | $0.02 | $0.02 | $0.02 | $0.21 |
| 136 | Pavement surface preparation for marking (24") (678-7008) | LF | 3,688 | $0.40 | $0.50 | $0.56 | $0.50 | $0.53 | $0.50 | $0.80 |
| 137 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 32 | $45.00 | $10.00 | $11.30 | $10.00 | $11.00 | $10.00 | $42.60 |
| 138 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 2 | $50.00 | $15.00 | $17.00 | $15.00 | $16.00 | $15.00 | $53.25 |
| 139 | Pavement surface preparation for marking (word) (678-7016) | EACH | 24 | $45.00 | $13.00 | $14.70 | $13.00 | $14.00 | $13.00 | $69.23 |
| 140 | Install highway traffic signal (isolated) (680-7002) | EACH | 3 | $65,000 | $41,437 | $49,000 | $45,690 | $50,000 | $47,585 | $48,660 |
| 141 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 31 | $500.00 | $379.16 | $441.10 | $378.00 | $450.00 | $428.22 | $402.57 |
| 142 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 10 | $500.00 | $385.75 | $460.00 | $385.00 | $467.00 | $445.11 | $410.03 |
| 143 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 31 | $500.00 | $379.16 | $445.50 | $378.00 | $455.00 | $432.45 | $402.57 |
| 144 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 14 | $500.00 | $385.75 | $451.20 | $385.00 | $460.00 | $438.06 | $410.03 |
| 145 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 31 | $500.00 | $379.16 | $441.10 | $378.00 | $450.00 | $428.22 | $402.57 |
| 146 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 14 | $500.00 | $385.75 | $451.20 | $385.00 | $460.00 | $438.06 | $410.03 |
| 147 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $1,000.00 | $814.79 | $990.20 | $881.00 | $1,010.00 | $961.35 | $938.27 |
| 148 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 28 | $250.00 | $298.56 | $246.10 | $178.00 | $251.00 | $238.93 | $189.57 |
| 149 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 3 | $350.00 | $315.90 | $335.00 | $205.00 | $340.00 | $323.53 | $218.33 |
| 150 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 7 | $450.00 | $322.49 | $342.00 | $225.00 | $350.00 | $331.99 | $239.63 |
| 151 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,408 | $5.00 | $2.83 | $3.65 | $3.00 | $3.75 | $3.54 | $3.20 |
| 152 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 876 | $5.00 | $3.96 | $4.86 | $3.67 | $5.00 | $4.72 | $3.91 |
| 153 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 1,448 | $10.00 | $9.35 | $12.80 | $5.00 | $13.00 | $12.42 | $5.33 |
| 154 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,609 | $4.00 | $2.56 | $3.35 | $2.43 | $3.40 | $3.24 | $2.59 |
| 155 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 1 | $18,500 | $14,196 | $16,350 | $12,257 | $16,670 | $15,875 | $13,054 |
| 156 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 1 | $20,000 | $15,230 | $17,890 | $13,042 | $18,235 | $17,366 | $13,890 |
| 157 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 1 | $21,000 | $16,575 | $18,950 | $13,880 | $19,300 | $18,383 | $14,782 |
| 158 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 2 | $22,000 | $18,870 | $20,100 | $15,621 | $20,470 | $19,494 | $16,636 |
| 159 | Ins traffic signal PL AM(S)1 arm(50')lum (686-7055) | EACH | 1 | $50,000 | $32,479 | $37,350 | $25,500 | $38,050 | $36,244 | $27,158 |
| 160 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $52,000 | $33,667 | $38,700 | $26,250 | $39,450 | $37,574 | $27,956 |
| 161 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 1 | $54,000 | $34,997 | $39,785 | $27,430 | $40,560 | $38,626 | $29,213 |
| 162 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 3 | $55,000 | $35,866 | $40,700 | $28,550 | $41,490 | $39,516 | $30,406 |
| 163 | Pedestrian pole assembly (687-7001) | EACH | 5 | $2,000.00 | $4,627.92 | $2,555.00 | $3,850.00 | $2,600.00 | $2,477.19 | $4,100.25 |
| 164 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,200.00 | $994.61 | $990.00 | $921.00 | $1,010.00 | $960.73 | $980.87 |
| 165 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,500.00 | $4,098.70 | $4,065.00 | $4,220.00 | $4,140.00 | $3,942.40 | $4,494.30 |
| 166 | Full - width mowing (730-7019) | CYC | 2 | $5,000.00 | $4,000.00 | $2,565.00 | $7,468.54 | $6,481.00 | $3,900.00 | $15,000 |
| 167 | Bbu system (external battery cabinet) (6007-7001) | EACH | 3 | $10,000 | $8,427.45 | $10,305 | $8,950.00 | $10,500 | $10,003 | $9,531.75 |
| 168 | RVDS (presence detection only) (6008-7001) | EACH | 2 | $10,000 | $9,864.91 | $9,510.00 | $7,000.00 | $9,690.00 | $9,229.06 | $7,455.00 |
| 169 | RVDS (presence and advance detection) (6008-7003) | EACH | 9 | $10,000 | $9,321.61 | $9,650.00 | $9,000.00 | $9,833.00 | $9,365.43 | $9,585.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.