TxDOT contract A00205634 bid tabulation

Construct New Road, SS 394 (IH 35E to FM 877). Let by Texas DOT on February 4, 2026, Ellis, Dallas District. 11 bids received; low bid $18,932,077 by Mario Sinacola & Sons Excavating, Inc., -25% against the engineer's estimate of $25,389,268.

Owner
Texas DOT
Letting
04 FEB 2026
Pay items
169
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Mario Sinacola & Sons Excavating, Inc.$18,932,077Low-25%
2RPM Xconstruction, LLC$20,400,001+8.0%-20%
3Webber, LLC$21,710,736+15%-14%
4A. L. Helmcamp, Inc.$22,102,316+17%-13%
5Texas Materials Group, Inc.$22,915,256+21%-10%
6Ed Bell Construction Company$22,976,475+21%-10%
7Harper Brothers Construction LLC$23,570,223+24%-7.0%
8Tiseo Paving Co.$23,913,483+26%-6.0%
9Grey Sky Construction LLC$25,363,689+34%0.0%
10Indus Road & Bridge, Inc.$30,826,316+63%+21%
11Copasa Inc$34,327,526+81%+35%
TxDOT contract A00205634: bids by rank

Engineer's estimate: $25,389,268.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Mario Sinacola & Sons Excavating, Inc.2. RPM Xconstruction, LLC3. Webber, LLC4. A. L. Helmcamp, Inc.5. Texas Materials Group, Inc.6. Ed Bell Construction Company
1Preparing row (100-7002)STA90$14,480$6,000.00$5,000.00$22,144$1,500.00$800.00$9,450.00
2Remove (8"-12") TRT/untrt base & asphalt pavement (105-7008)SY2,827$30.00$10.00$7.00$13.30$20.00$9.00$10.00
3Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012)SY967$32.00$14.00$12.50$19.02$22.00$13.00$10.00
4Remove (18"-22") TRT/untrt base & asphalt pavement (105-7018)SY375$35.00$18.00$16.50$23.31$30.00$26.00$10.00
5Excavation (roadway) (110-7001)CY40,026$18.00$5.00$5.45$12.74$8.00$5.00$7.00
6Embankment (final)(DC)(type C) (132-7006)CY131,279$25.00$15.00$18.00$15.90$14.00$23.75$20.00
7Compost manuf topsoil (4") (161-7002)SY124,476$1.50$0.88$1.60$1.59$1.25$1.50$0.94
8Block sodding (162-7002)SY82,169$3.50$3.46$3.60$3.46$4.20$3.46$3.68
9Drill seed (permanent_urban_clay) (164-7012)SY35,816$1.00$0.13$0.15$0.13$0.21$0.13$0.14
10Drill seed (temporary_warm_cool) (164-7015)SY124,476$0.40$0.13$0.13$0.13$0.15$0.13$0.14
11Vegetative watering (168-7001)TGL36,069$1.00$0.10$1.00$7.32$3.50$0.01$1.00
12Soil ret BLKT (OPT1) (169-7041)SY6,538$1.00$0.60$0.61$0.59$2.10$0.59$0.63
13FL BS (compacted in place)(type D GR 1-2) (6") (247-7056)SY4,613$25.00$19.00$18.50$16.65$22.00$21.00$20.00
14Lime (com or QK)(slurry) (260-7005)TON2,028$325.00$295.00$318.00$294.75$300.00$300.00$310.00
15Lime TRT (existing material)(10") (260-7008)SY75,460$5.00$5.00$4.50$3.59$3.25$4.90$4.00
16Lime TRT (existing material)(12") (260-7009)SY4,613$5.00$10.00$13.00$10.17$6.00$5.30$10.00
17Prime coat(MC-30 or AE-P) (310-7013)GAL1,384$8.00$7.00$7.20$5.50$5.00$5.50$7.46
18SP mixes SP-B PG64-22 (344-7001)TON17,619$100.00$111.50$115.00$105.00$110.00$141.00$118.69
19SP mixes SP-C sac-B PG70-22 (344-7021)TON517$160.00$164.00$169.00$170.00$230.00$230.00$174.66
20Tack coat (344-7077)GAL283$5.00$10.00$10.30$9.35$5.00$9.35$10.65
21Concrete pavement (CRCP) (10") (360-7004)SY67,700$93.00$70.50$82.00$73.42$114.00$95.70$89.00
22Trench excavation protection (402-7001)LF9,278$10.00$1.00$1.00$3.00$5.50$1.00$2.00
23Drilled shaft (traffic signal pole) (30 in) (416-7043)LF11$700.00$682.80$310.00$389.00$313.00$297.73$414.29
24Drilled shaft (traffic signal pole) (36 in) (416-7044)LF52$800.00$702.74$335.00$487.00$340.00$323.89$518.66
25Drilled shaft (traffic signal pole) (48 in) (416-7046)LF132$1,000.00$805.53$525.00$565.00$535.00$509.15$601.73
26Class A concrete (flume) (420-7006)CY10$1,000.00$1,000.00$560.00$910.42$800.00$680.00$1,250.00
27Riprap (stone common)(dry)(12 in) (432-7031)CY760$200.00$192.00$165.00$107.42$218.00$225.00$250.00
28Rail (handrail)(type F) (450-7063)LF50$160.00$200.00$320.00$200.00$257.00$321.00$250.00
29Concrete box culvert (5 FT X 3 FT) (462-7007)LF316$500.00$340.00$330.00$390.00$432.00$440.00$418.39
30Concrete box culvert (12 FT X 10 FT) (462-7053)LF148$3,000.00$1,240.00$1,550.00$1,365.00$1,602.00$2,250.00$1,600.76
31RC pipe (CL III)(18 in) (464-7003)LF2,653$70.00$65.00$52.50$83.00$80.00$63.00$89.11
32RC pipe (CL III)(24 in) (464-7005)LF6,515$85.00$76.00$67.50$101.00$97.00$81.00$106.50
33RC pipe (CL III)(30 in) (464-7007)LF2,696$120.00$107.00$89.00$130.00$119.00$108.00$138.02
34RC pipe (CL III)(36 in) (464-7009)LF2,364$155.00$130.00$116.50$161.00$151.00$144.00$176.05
35Inlet (complete)(pcu)(3FT)(none) (465-7029)EACH37$9,000.00$9,700.00$6,864.00$6,800.00$7,560.00$5,455.00$7,335.46
36Inlet (complete)(pcu)(3FT)(left) (465-7030)EACH36$9,100.00$10,500$7,898.00$7,000.00$8,038.00$6,630.00$7,444.13
37Inlet (complete)(pcu)(3FT)(right) (465-7031)EACH37$9,100.00$10,000$7,991.00$7,300.00$7,969.00$6,510.00$7,878.83
38Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158)EACH4$9,000.00$7,250.00$5,648.00$5,000.00$6,650.00$4,170.00$5,651.02
39Headwall (CH - PW - 0) (diameter= 24 in) (466-7101)EACH1$10,000$6,500.00$5,890.00$4,800.00$13,315$5,500.00$5,216.33
40Wingwall (FW - 0) (HW=4 FT) (466-7146)EACH1$15,000$17,300$9,990.00$35,000$26,675$27,000$34,232
41Wingwall (FW - 0) (HW=7 FT) (466-7149)EACH1$25,000$27,000$16,450$25,000$25,560$25,000$25,538
42Wingwall (PW - 1) (HW=12 FT) (466-7182)EACH2$60,000$60,000$61,900$60,000$68,880$75,000$57,597
43Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305)EACH1$1,500.00$4,250.00$1,526.00$1,600.00$1,275.00$860.00$1,847.44
44Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH1$1,500.00$4,375.00$1,670.00$1,900.00$1,350.00$980.00$1,956.12
45Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH1$2,000.00$2,400.00$2,055.00$2,000.00$1,430.00$1,015.00$2,064.80
46Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345)EACH1$4,000.00$5,275.00$2,900.00$2,300.00$1,765.00$1,850.00$2,499.49
47Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH1$4,000.00$6,250.00$3,245.00$2,650.00$2,000.00$2,130.00$2,608.16
48Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366)EACH1$6,000.00$6,800.00$5,320.00$4,100.00$3,060.00$5,000.00$4,346.94
49Adjusting inlets (479-7002)EACH1$4,000.00$5,000.00$4,100.00$4,500.00$3,650.00$5,300.00$6,303.06
50Clean existing culverts (480-7001)EACH4$6,000.00$5,000.00$5,900.00$10,000$2,890.00$3,200.00$7,498.47
51Removing structure (headwall) (496-7006)EACH1$1,600.00$2,500.00$1,825.00$1,500.00$3,165.00$1,200.00$1,630.10
52Removing structure (pipe) (496-7007)LF2$70.00$50.00$190.00$157.00$260.00$300.00$170.62
53Mobilization (500-7001)LS1$2,302,350$1,842,000$2,000,000$2,050,000$1,575,000$2,150,000$2,129,000
54Barricades, signs and traffic handling (502-7001)MO21$12,000$4,000.00$2,000.00$25,000$10,100$4,300.00$21,000
55TMA (stationary) (505-7001)DAY50$250.00$710.00$448.00$243.49$350.00$100.00$210.00
56TMA (mobile operation) (505-7003)DAY5$150.00$1,100.00$1,160.00$807.87$450.00$450.00$1,000.00
57Rock filter dams (install) (type 2) (506-7002)LF420$40.00$47.50$43.25$39.83$41.00$39.83$60.00
58Rock filter dams (install) (type 3) (506-7003)LF150$80.00$65.00$77.00$71.01$71.00$71.01$135.00
59Rock filter dams (remove) (506-7011)LF570$20.00$5.00$19.25$17.71$13.50$17.71$25.00
60Construction exits (install) (type 1) (506-7020)SY247$40.00$29.00$40.20$37.01$37.00$37.01$40.00
61Construction exits (remove) (506-7024)SY247$14.00$5.00$13.80$12.70$10.00$12.70$10.00
62Temporary sediment control fence (install) (506-7039)LF14,255$5.00$1.65$3.60$3.29$4.20$3.29$4.00
63Temporary sediment control fence (remove) (506-7041)LF14,255$1.50$0.10$0.90$0.82$0.85$0.82$1.00
64Biodegradable erosion control logs (install) (12") (506-7044)LF4,507$6.00$3.55$7.10$6.55$5.25$6.55$6.50
65Biodegradable erosion control logs (remove) (506-7046)LF4,507$3.00$0.25$1.05$0.96$0.30$0.96$1.00
66Constructing detours (508-7001)SY1,043$110.00$90.00$97.00$110.54$65.00$80.00$125.00
67Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF2,430$80.00$18.00$48.00$14.64$50.00$37.81$50.00
68Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF420$50.00$30.00$80.00$29.94$50.00$43.21$100.00
69Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF40$70.00$30.00$80.00$115.79$50.00$43.21$125.00
70Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF720$20.00$10.00$5.00$13.89$31.00$16.21$15.00
71Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF220$15.00$10.00$5.00$22.82$26.00$21.61$30.00
72Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF40$20.00$10.00$13.50$47.84$47.00$21.61$40.00
73Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF2,430$25.00$5.00$5.30$8.26$45.00$21.61$15.00
74Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF420$20.00$5.00$9.10$20.76$16.00$32.41$30.00
75Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF40$22.00$5.00$21.30$60.80$57.00$32.41$40.00
76Concrete curb (mono) (type II) (529-7007)LF31,290$5.00$1.50$3.36$2.91$7.00$4.00$4.25
77Driveways (concrete) (530-7006)SY441$120.00$95.00$121.50$104.82$160.00$130.00$100.00
78Driveways (ACP) (530-7010)SY106$170.00$90.00$90.25$69.16$400.00$106.00$114.71
79Concrete sidewalks (5") (531-7002)SY18,333$70.00$58.00$72.00$50.79$56.00$88.00$75.00
80Curb ramps (type 1) (531-7015)SY93$150.00$350.00$245.00$309.80$95.00$220.00$250.00
81Curb ramps (type 7) (531-7020)SY131$150.00$350.00$141.00$289.82$78.00$220.00$250.00
82Concrete median (536-7002)SY804$110.00$75.00$83.00$121.02$104.00$145.00$85.00
83Concrete median (mono nose) (536-7006)SY67$400.00$75.00$97.00$286.84$115.00$145.00$175.00
84Right of way markers (538-7001)EACH39$600.00$415.00$432.00$491.50$335.00$500.00$441.98
85Crash cushion attenuator (move & reset) (545-7002)EACH2$2,000.00$1,100.00$1,065.00$1,025.00$1,095.00$2,160.74$2,000.00
86Crash cushion attenuator (remove) (545-7004)EACH6$1,500.00$750.00$820.00$790.00$1,095.00$1,080.37$1,000.00
87Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH6$10,000$6,000.00$7,975.00$7,669.00$8,950.00$10,264$8,000.00
88Relocate existing mailbox (560-7012)EACH1$400.00$500.00$235.00$225.00$577.00$310.00$239.63
89Remove RD IL asm (trans-base) (610-7009)EACH1$2,500.00$903.46$845.00$1,002.53$859.00$818.22$1,065.00
90Conduit (PVC) (schedule 40) (2") (618-7030)LF110$20.00$13.84$19.30$10.00$19.75$18.73$10.65
91Conduit (PVC) (schedule 40) (2") (bore) (618-7031)LF243$35.00$40.67$28.25$25.89$28.75$27.41$27.57
92Conduit (PVC) (schedule 40) (3") (618-7036)LF361$30.00$17.69$21.60$12.55$22.00$20.93$13.37
93Conduit (PVC) (schedule 40) (4") (618-7040)LF197$40.00$19.29$23.20$19.87$23.50$22.49$21.16
94Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF972$50.00$54.05$31.65$39.54$32.50$30.71$42.11
95Conduit (PVC) (schedule 80) (2") (618-7054)LF102$29.00$17.26$20.65$11.18$21.00$20.02$11.91
96Electrical conductor (no.12) insulated (620-7004)LF880$2.00$1.66$2.50$1.00$2.50$2.40$1.07
97Electrical conductor (no.8) insulated (620-7008)LF3,590$3.00$2.40$3.55$1.85$3.60$3.46$1.97
98Electrical conductor (no.6) bare (620-7009)LF1,859$3.00$2.32$3.75$2.21$3.80$3.62$2.35
99Electrical conductor (no.6) insulated (620-7010)LF220$3.00$2.76$4.10$2.55$4.20$3.97$2.72
100Ground box type A (122311)W/apron (624-7002)EACH2$2,000.00$1,663.57$1,640.00$990.00$1,675.00$1,592.80$1,054.35
101Ground box type C (162911)W/apron (624-7006)EACH3$2,200.00$2,012.83$1,705.00$1,258.00$1,740.00$1,656.25$1,339.77
102Ground box type D (162922)W/apron (624-7008)EACH10$2,500.00$1,772.96$1,715.00$1,440.00$1,750.00$1,663.29$1,533.60
103Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190)EACH3$12,000$9,880.68$12,445$9,760.00$12,700$12,081$10,394
104Aluminum signs (type A) (636-7001)SF222$75.00$31.06$35.00$38.21$61.00$41.00$35.52
105Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH32$1,300.00$615.00$640.00$655.00$788.00$670.00$654.98
106Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH1$800.00$895.00$930.70$688.00$840.00$1,087.00$953.18
107Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005)EACH1$1,500.00$775.00$806.00$728.00$840.00$874.00$825.38
108Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH2$1,400.00$1,110.00$1,155.00$1,079.00$1,260.00$953.00$1,182.15
109Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032)EACH3$2,000.00$1,360.00$1,415.00$1,273.00$1,260.00$1,160.00$1,448.40
110Work zone pavement marking removing (W)6"(solid) (662-7068)LF11,120$1.50$0.75$0.85$0.75$0.79$0.75$1.01
111Work zone pavement marking removing (W)24"(solid) (662-7077)LF32$1.50$5.75$6.50$5.75$6.04$5.75$3.20
112Work zone pavement marking removing (Y)6"(solid) (662-7100)LF9,935$1.50$0.75$0.85$0.75$0.79$0.75$1.01
113Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF590$1.50$1.75$2.00$1.75$1.84$1.75$1.01
114Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF6,546$2.00$0.86$1.00$0.86$0.90$0.86$1.01
115Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF2,698$10.00$6.50$7.35$6.50$6.83$6.50$6.66
116Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH32$200.00$125.00$141.20$125.00$131.00$125.00$159.75
117Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH3$300.00$175.00$198.00$175.00$183.00$175.00$266.25
118Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH24$200.00$145.00$164.00$145.00$152.00$145.00$170.40
119Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF990$8.00$6.50$7.35$6.50$6.80$6.50$6.66
120Pavement sler 6" (666-7347)LF42,370$0.20$0.16$0.18$0.16$0.17$0.16$0.27
121Pavement sler 8" (666-7348)LF5,559$0.30$0.23$0.26$0.23$0.24$0.23$0.32
122Pavement sler 24" (666-7352)LF3,153$1.00$1.35$1.52$1.35$1.40$1.35$2.13
123Pavement sler (arrow) (666-7353)EACH3$30.00$25.00$28.25$25.00$26.00$25.00$53.25
124Pavement sler (word) (666-7354)EACH10$30.00$31.00$35.00$31.00$33.00$31.00$63.90
125Pavement sler (double arrow) (666-7356)EACH2$50.00$36.00$40.65$36.00$38.00$36.00$79.88
126Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF4,000$0.90$0.64$0.72$0.64$0.67$0.64$0.55
127Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF22,583$1.10$0.57$0.65$0.57$0.60$0.57$0.55
128Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF26,517$1.10$0.57$0.65$0.57$0.60$0.57$0.55
129Reflectorized pavement marker type I-C (672-7002)EACH132$6.00$3.95$4.45$3.95$4.15$3.95$6.12
130Reflectorized pavement marker type II-A-A (672-7004)EACH403$8.00$3.95$4.45$3.95$4.15$3.95$6.12
131Reflectorized pavement marker type II-C-R (672-7006)EACH766$6.00$3.95$4.45$3.95$4.15$3.95$6.12
132Eliminating existing PM & markers (4") (677-7001)LF5,083$0.60$0.50$0.55$0.50$0.53$0.50$0.69
133Eliminating existing PM & markers (24") (677-7008)LF22$5.00$3.00$3.40$3.00$3.15$3.00$6.39
134Pavement surface preparation for marking (6") (678-7002)LF53,100$0.50$0.01$0.01$0.01$0.01$0.01$0.16
135Pavement surface preparation for marking (8") (678-7004)LF7,136$0.60$0.02$0.02$0.02$0.02$0.02$0.21
136Pavement surface preparation for marking (24") (678-7008)LF3,688$0.40$0.50$0.56$0.50$0.53$0.50$0.80
137Pavement surface preparation for marking (arrow) (678-7009)EACH32$45.00$10.00$11.30$10.00$11.00$10.00$42.60
138Pavement surface preparation for marking (double arrow) (678-7010)EACH2$50.00$15.00$17.00$15.00$16.00$15.00$53.25
139Pavement surface preparation for marking (word) (678-7016)EACH24$45.00$13.00$14.70$13.00$14.00$13.00$69.23
140Install highway traffic signal (isolated) (680-7002)EACH3$65,000$41,437$49,000$45,690$50,000$47,585$48,660
141Vehicle signal section (12")LED(green) (682-7001)EACH31$500.00$379.16$441.10$378.00$450.00$428.22$402.57
142Vehicle signal section (12")LED(green arrow) (682-7002)EACH10$500.00$385.75$460.00$385.00$467.00$445.11$410.03
143Vehicle signal section (12")LED(yel) (682-7003)EACH31$500.00$379.16$445.50$378.00$455.00$432.45$402.57
144Vehicle signal section (12")LED(yel arrow) (682-7004)EACH14$500.00$385.75$451.20$385.00$460.00$438.06$410.03
145Vehicle signal section (12")LED(red) (682-7005)EACH31$500.00$379.16$441.10$378.00$450.00$428.22$402.57
146Vehicle signal section (12")LED(red arrow) (682-7006)EACH14$500.00$385.75$451.20$385.00$460.00$438.06$410.03
147Pedestrian signal section (LED)(countdown) (682-7018)EACH8$1,000.00$814.79$990.20$881.00$1,010.00$961.35$938.27
148Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH28$250.00$298.56$246.10$178.00$251.00$238.93$189.57
149Backplate W/ref border(4 sec)(vent)aluminum (682-7043)EACH3$350.00$315.90$335.00$205.00$340.00$323.53$218.33
150Backplate W/ref border(5 sec)(vent)aluminum (682-7044)EACH7$450.00$322.49$342.00$225.00$350.00$331.99$239.63
151Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF1,408$5.00$2.83$3.65$3.00$3.75$3.54$3.20
152Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF876$5.00$3.96$4.86$3.67$5.00$4.72$3.91
153Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF1,448$10.00$9.35$12.80$5.00$13.00$12.42$5.33
154Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF1,609$4.00$2.56$3.35$2.43$3.40$3.24$2.59
155Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH1$18,500$14,196$16,350$12,257$16,670$15,875$13,054
156Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH1$20,000$15,230$17,890$13,042$18,235$17,366$13,890
157Ins traffic signal PL AM(S)1 arm(40')lum (686-7043)EACH1$21,000$16,575$18,950$13,880$19,300$18,383$14,782
158Ins traffic signal PL AM(S)1 arm(48')lum (686-7051)EACH2$22,000$18,870$20,100$15,621$20,470$19,494$16,636
159Ins traffic signal PL AM(S)1 arm(50')lum (686-7055)EACH1$50,000$32,479$37,350$25,500$38,050$36,244$27,158
160Ins traffic signal PL AM(S)1 arm(55')lum (686-7059)EACH1$52,000$33,667$38,700$26,250$39,450$37,574$27,956
161Ins traffic signal PL AM(S)1 arm(60')lum (686-7063)EACH1$54,000$34,997$39,785$27,430$40,560$38,626$29,213
162Ins traffic signal PL AM(S)1 arm(65')lum (686-7067)EACH3$55,000$35,866$40,700$28,550$41,490$39,516$30,406
163Pedestrian pole assembly (687-7001)EACH5$2,000.00$4,627.92$2,555.00$3,850.00$2,600.00$2,477.19$4,100.25
164Pedestrian detect push button (APS) (688-7001)EACH8$1,200.00$994.61$990.00$921.00$1,010.00$960.73$980.87
165Pedestrian detector controller unit (688-7003)EACH1$4,500.00$4,098.70$4,065.00$4,220.00$4,140.00$3,942.40$4,494.30
166Full - width mowing (730-7019)CYC2$5,000.00$4,000.00$2,565.00$7,468.54$6,481.00$3,900.00$15,000
167Bbu system (external battery cabinet) (6007-7001)EACH3$10,000$8,427.45$10,305$8,950.00$10,500$10,003$9,531.75
168RVDS (presence detection only) (6008-7001)EACH2$10,000$9,864.91$9,510.00$7,000.00$9,690.00$9,229.06$7,455.00
169RVDS (presence and advance detection) (6008-7003)EACH9$10,000$9,321.61$9,650.00$9,000.00$9,833.00$9,365.43$9,585.00
TxDOT contract A00205634: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy