TxDOT contract A00064555 bid tabulation
Widen Road - Add Lanes, SH 174 (Wicker Hill Rd to North of Elk Dr.). Let by Texas DOT on June 2, 2026, Johnson, Fort Worth District. 8 bids received; low bid $19,812,334 by Reyes TX, Inc., -1.2% against the engineer's estimate of $20,058,072.
- Owner
- Texas DOT
- Letting
- 02 JUN 2026
- Pay items
- 208
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Reyes TX, Inc. | $19,812,334 | Low | -1.0% |
| 2 | Jay Mills Contracting, Incorporated | $20,139,332 | +2.0% | 0.0% |
| 3 | Foutsco Paving Company, LLC | $20,530,953 | +4.0% | +2.0% |
| 4 | Ragle Construction, Inc. | $21,055,631 | +6.0% | +5.0% |
| 5 | Overland Corporation | $21,808,766 | +10% | +9.0% |
| 6 | Texas Materials Group, Inc. | $21,835,404 | +10% | +9.0% |
| 7 | Ed Bell Construction Company | $22,787,417 | +15% | +14% |
| 8 | Copasa Inc | $24,437,942 | +23% | +22% |
Engineer's estimate: $20,058,072.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Reyes TX, Inc. | 2. Jay Mills Contracting, Incorporated | 3. Foutsco Paving Company, LLC | 4. Ragle Construction, Inc. | 5. Overland Corporation | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 105 | $1,500.00 | $14,148 | $5,000.00 | $12,000 | $19,000 | $17,900 | $2,430.00 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 2,744 | $9.00 | $8.00 | $7.50 | $18.00 | $4.80 | $10.00 | $9.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 257 | $30.00 | $20.00 | $27.00 | $27.00 | $8.25 | $10.00 | $32.00 |
| 4 | Removing concrete (medians) (104-7008) | SY | 1,831 | $30.00 | $15.00 | $21.00 | $18.00 | $9.50 | $10.00 | $27.99 |
| 5 | Removing concrete (pavers) (104-7010) | SY | 125 | $50.00 | $15.00 | $27.00 | $36.00 | $10.10 | $20.00 | $33.00 |
| 6 | Removing concrete (driveways) (104-7011) | SY | 2,257 | $23.00 | $20.00 | $21.00 | $40.00 | $11.75 | $20.00 | $66.00 |
| 7 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 91 | $18.10 | $75.00 | $27.00 | $31.00 | $30.50 | $24.00 | $43.00 |
| 8 | Removing concrete (curb) (104-7016) | LF | 1,087 | $15.00 | $12.00 | $18.00 | $18.00 | $8.50 | $12.00 | $21.00 |
| 9 | Removing concrete (curb & gutter) (104-7017) | LF | 1,170 | $20.00 | $14.00 | $21.00 | $22.00 | $13.60 | $18.00 | $18.00 |
| 10 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 768 | $20.00 | $12.00 | $24.00 | $9.70 | $10.00 | $18.00 | $18.00 |
| 11 | Remove (14"-18") TRT/untrt base & asphalt pavement (105-7014) | SY | 14,690 | $20.00 | $15.00 | $14.00 | $15.00 | $12.20 | $10.00 | $11.00 |
| 12 | Excavation (roadway) (110-7001) | CY | 14,600 | $25.00 | $11.00 | $23.50 | $22.00 | $29.00 | $25.00 | $19.00 |
| 13 | Embankment (final)(OC)(type B) (132-7003) | CY | 19,200 | $35.00 | $28.00 | $18.00 | $25.00 | $8.00 | $25.00 | $18.00 |
| 14 | Spec excavation work (hyd excavator) (158-7002) | HR | 3 | $920.00 | $1,170.00 | $1,000.00 | $750.00 | $197.50 | $500.00 | $650.00 |
| 15 | Furn & place topsoil (4") (160-7002) | SY | 55,957 | $5.00 | $3.30 | $6.00 | $3.00 | $5.00 | $2.79 | $4.60 |
| 16 | Block sodding (162-7002) | SY | 4,851 | $12.00 | $4.40 | $5.60 | $5.00 | $7.30 | $7.93 | $5.00 |
| 17 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 50,116 | $0.60 | $1.30 | $0.30 | $0.25 | $0.30 | $1.00 | $0.25 |
| 18 | Broadcast seed (temporary_cool) (164-7006) | SY | 48,736 | $0.60 | $1.30 | $0.20 | $0.16 | $0.26 | $0.65 | $0.16 |
| 19 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 48,736 | $0.60 | $1.30 | $0.20 | $0.16 | $0.26 | $0.65 | $0.16 |
| 20 | Fertilizer (166-7002) | TON | 4 | $2,000.00 | $3,520.00 | $1,000.00 | $900.00 | $850.00 | $972.58 | $900.00 |
| 21 | Vegetative watering (168-7001) | TGL | 2,015 | $30.00 | $30.00 | $35.00 | $1.00 | $44.00 | $1.00 | $50.00 |
| 22 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 846 | $32.00 | $25.00 | $50.00 | $26.80 | $22.00 | $50.00 | $75.00 |
| 23 | FL BS (compacted in place)(type A GR 1-2) (12") (247-7113) | SY | 38,230 | $35.00 | $23.00 | $27.00 | $33.30 | $26.25 | $55.00 | $46.00 |
| 24 | Lime (com or QK)(slurry) (260-7005) | TON | 699 | $300.00 | $315.00 | $355.00 | $420.00 | $320.00 | $315.00 | $320.00 |
| 25 | Lime TRT (subgrade) (8") (260-7020) | SY | 22,530 | $5.00 | $2.80 | $9.75 | $8.50 | $6.80 | $6.98 | $25.00 |
| 26 | Cement (275-7001) | TON | 490 | $250.00 | $499.00 | $250.00 | $450.00 | $350.00 | $216.62 | $433.00 |
| 27 | Cement treat (subgrade) (8") (275-7017) | SY | 15,700 | $4.00 | $2.90 | $9.25 | $9.50 | $5.10 | $3.61 | $12.00 |
| 28 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 4,587 | $7.50 | $3.10 | $7.00 | $3.50 | $1.70 | $4.26 | $6.50 |
| 29 | SP mixes SP-B PG64-22 (344-7001) | TON | 7,987 | $145.00 | $117.00 | $128.00 | $151.28 | $121.00 | $120.00 | $180.00 |
| 30 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 13,905 | $160.00 | $165.00 | $176.00 | $197.73 | $169.50 | $162.00 | $244.00 |
| 31 | SP mixes SP-D sac-B PG70-22 (level-UP) (344-7055) | TON | 3,600 | $165.00 | $147.00 | $176.00 | $165.57 | $144.50 | $200.00 | $226.00 |
| 32 | Tack coat (344-7077) | GAL | 18,861 | $5.00 | $7.50 | $0.01 | $0.10 | $1.80 | $3.00 | $4.50 |
| 33 | Flexible pavement structure repair(8") (351-7007) | SY | 3,685 | $75.00 | $16.00 | $94.00 | $76.70 | $128.00 | $100.00 | $90.00 |
| 34 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 122,085 | $2.00 | $1.90 | $2.25 | $1.00 | $1.60 | $3.37 | $3.50 |
| 35 | Concrete pavement (CRCP) (7") (360-7001) | SY | 846 | $125.00 | $113.00 | $107.00 | $150.00 | $103.40 | $102.00 | $102.00 |
| 36 | Cut & restore asphalt paving (400-7008) | SY | 195 | $160.00 | $204.00 | $225.00 | $100.00 | $67.50 | $100.00 | $250.00 |
| 37 | Cut and restore pavement (flex base) (400-7009) | SY | 61 | $250.00 | $161.00 | $380.00 | $100.00 | $226.00 | $100.00 | $20.00 |
| 38 | Cem stabil BKFL (400-7010) | CY | 2,195 | $80.00 | $177.00 | $217.00 | $180.00 | $115.00 | $113.51 | $222.67 |
| 39 | Trench excavation protection (402-7001) | LF | 1,895 | $21.00 | $45.00 | $5.00 | $10.00 | $20.00 | $1.00 | $1.00 |
| 40 | Temporary special shoring (403-7001) | SF | 1,096 | $50.00 | $93.00 | $49.00 | $40.00 | $61.00 | $44.00 | $44.00 |
| 41 | Drilled shaft (18 in) (416-7002) | LF | 32 | $160.00 | $80.00 | $305.00 | $185.00 | $238.10 | $293.13 | $275.00 |
| 42 | Drilled shaft (24 in) (416-7004) | LF | 201 | $265.00 | $170.00 | $372.00 | $195.00 | $242.60 | $349.43 | $335.00 |
| 43 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 39 | $650.00 | $427.00 | $711.00 | $435.00 | $435.00 | $609.87 | $641.00 |
| 44 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 198 | $900.00 | $475.00 | $862.00 | $600.00 | $600.00 | $678.65 | $777.00 |
| 45 | Class A concrete (miscellaneous) (420-7002) | CY | 4 | $755.00 | $796.00 | $1,331.00 | $396.00 | $1,194.00 | $1,200.00 | $1,200.00 |
| 46 | Class A concrete (collar) (420-7008) | EACH | 5 | $2,300.00 | $2,460.00 | $2,850.00 | $980.00 | $2,340.00 | $1,600.00 | $1,600.00 |
| 47 | Class C concrete (abutment)(HPC)(extend) (420-7017) | CY | 38.40 | $5,000.00 | $3,920.00 | $2,772.00 | $2,500.00 | $1,784.00 | $2,500.00 | $2,500.00 |
| 48 | Class C concrete (cap)(HPC) (420-7023) | CY | 8 | $2,000.00 | $15,000 | $5,322.00 | $4,800.00 | $5,287.00 | $4,800.00 | $4,800.00 |
| 49 | Class C concrete (column)(HPC) (420-7039) | CY | 5.40 | $2,200.00 | $9,500.00 | $5,322.00 | $4,800.00 | $3,480.00 | $4,800.00 | $4,800.00 |
| 50 | Slab span (extend)(HPC) (422-7019) | CY | 141 | $1,000.00 | $2,065.00 | $2,384.00 | $2,150.00 | $1,843.00 | $2,150.00 | $2,150.00 |
| 51 | Riprap (concrete)(5 in) (432-7002) | CY | 452 | $600.00 | $616.00 | $671.00 | $542.00 | $607.00 | $742.83 | $603.36 |
| 52 | Riprap (mow strip)(4 in) (432-7013) | CY | 75 | $750.00 | $616.00 | $677.00 | $606.00 | $617.00 | $732.95 | $610.00 |
| 53 | Riprap (stone common)(dry)(6 in) (432-7029) | CY | 7.50 | $160.00 | $616.00 | $325.00 | $512.00 | $1,069.00 | $300.00 | $300.00 |
| 54 | STR steel (miscellaneous bridge) (442-7008) | LB | 112 | $35.00 | $1,760.00 | $56.00 | $50.00 | $33.00 | $50.00 | $50.00 |
| 55 | Rail (type T221)(HPC) (450-7005) | LF | 246.30 | $190.00 | $184.00 | $178.00 | $160.00 | $115.00 | $160.00 | $160.00 |
| 56 | Rail (type PR22) (450-7045) | LF | 20 | $200.00 | $132.00 | $289.00 | $304.00 | $260.00 | $180.22 | $260.00 |
| 57 | Rail (handrail)(type E) (450-7062) | LF | 622 | $160.00 | $220.00 | $178.00 | $200.00 | $115.00 | $148.65 | $160.00 |
| 58 | Retrofit rail (type T221)(HPC) (451-7005) | LF | 236.80 | $250.00 | $220.00 | $189.00 | $170.00 | $295.00 | $170.00 | $170.00 |
| 59 | Type A joint (454-7001) | LF | 208 | $120.00 | $6.00 | $84.00 | $75.00 | $33.00 | $75.00 | $75.00 |
| 60 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 127 | $500.00 | $674.00 | $355.00 | $513.00 | $640.00 | $417.76 | $395.00 |
| 61 | Concrete box culvert (10 FT X 7 FT) (462-7035) | LF | 44 | $1,555.00 | $1,060.00 | $1,135.00 | $1,202.00 | $1,589.00 | $1,045.63 | $800.00 |
| 62 | Concrete box culvert (5 FT X 2 FT)(extend) (462-7061) | LF | 17 | $1,500.00 | $1,420.00 | $1,200.00 | $490.00 | $779.50 | $941.00 | $941.00 |
| 63 | RC pipe (CL III)(18 in) (464-7003) | LF | 245 | $80.00 | $261.00 | $92.00 | $81.00 | $90.00 | $83.99 | $65.00 |
| 64 | RC pipe (CL III)(24 in) (464-7005) | LF | 816 | $110.00 | $261.00 | $126.00 | $152.00 | $117.00 | $91.95 | $80.00 |
| 65 | RC pipe (CL III)(30 in) (464-7007) | LF | 67 | $180.00 | $324.00 | $185.00 | $161.00 | $147.00 | $124.31 | $108.00 |
| 66 | RC pipe (CL III)(36 in) (464-7009) | LF | 908 | $220.00 | $359.00 | $190.00 | $188.00 | $179.00 | $178.97 | $158.00 |
| 67 | RC pipe (CL III)(48 in) (464-7011) | LF | 20 | $345.00 | $760.00 | $285.00 | $388.00 | $319.00 | $311.44 | $288.00 |
| 68 | Inlet (complete)( CO)(20 FT)(FTW) (465-7187) | EACH | 1 | $11,000 | $43,220 | $16,500 | $16,530 | $17,317 | $14,000 | $14,000 |
| 69 | Inlet (complete)(CU)(20 FT)(FTW) (465-7195) | EACH | 6 | $25,000 | $71,020 | $16,000 | $12,000 | $13,000 | $14,300 | $14,300 |
| 70 | Inlet (complete)(AD)(3FT X 3FT)(FTW) (465-7234) | EACH | 4 | $6,000.00 | $21,470 | $11,000 | $6,320.00 | $7,000.00 | $8,300.00 | $8,300.00 |
| 71 | Junct box (complete)(JB)(5FT X 5FT)(FTW) (465-7286) | EACH | 2 | $19,030 | $21,890 | $11,000 | $6,900.00 | $10,000 | $11,150 | $11,150 |
| 72 | Inlet (complete)(armor curb slot) (465-7335) | EACH | 1 | $4,500.00 | $5,710.00 | $7,100.00 | $7,000.00 | $10,300 | $4,800.00 | $4,800.00 |
| 73 | Inlet (comp)(type sidewalk bridge) (465-7336) | EACH | 4 | $15,000 | $17,500 | $16,500 | $14,000 | $16,000 | $13,200 | $13,200 |
| 74 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 1 | $5,610.00 | $7,850.00 | $8,000.00 | $2,140.00 | $7,000.00 | $5,400.00 | $5,400.00 |
| 75 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 1 | $12,000 | $7,480.00 | $10,000 | $8,130.00 | $18,000 | $7,500.00 | $7,500.00 |
| 76 | Set (pipe runner) (467-7002) | EACH | 1 | $2,500.00 | $2,960.00 | $3,900.00 | $2,100.00 | $2,500.00 | $3,500.00 | $3,500.00 |
| 77 | Set (type I)(S= 10 FT)(HW= 4 FT)(3:1)(C) (467-7222) | EACH | 1 | $25,000 | $9,070.00 | $13,350 | $6,530.00 | $9,000.00 | $12,000 | $12,000 |
| 78 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 14 | $1,800.00 | $1,430.00 | $1,115.00 | $902.00 | $1,400.00 | $1,200.00 | $1,200.00 |
| 79 | Set (type II) (24 in) (TP) (6: 1) (P) (467-7332) | EACH | 2 | $2,500.00 | $1,930.00 | $1,600.00 | $1,900.00 | $2,000.00 | $2,860.00 | $2,860.00 |
| 80 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 5 | $2,500.00 | $8,320.00 | $6,350.00 | $3,825.00 | $8,400.00 | $5,160.00 | $5,160.00 |
| 81 | Set (type II) (36 in) (TP) (6: 1) (P) (467-7372) | EACH | 2 | $2,500.00 | $8,320.00 | $6,350.00 | $3,825.00 | $8,400.00 | $5,160.00 | $9,600.00 |
| 82 | Adjusting inlets (479-7002) | EACH | 1 | $2,835.00 | $2,050.00 | $6,000.00 | $5,000.00 | $1,600.00 | $4,800.00 | $4,800.00 |
| 83 | Adjusting inlets (cap) (479-7006) | EACH | 5 | $1,800.00 | $2,050.00 | $2,500.00 | $2,100.00 | $1,030.00 | $1,410.78 | $4,800.00 |
| 84 | Clean existing culverts (480-7001) | EACH | 30 | $4,000.00 | $528.00 | $3,000.00 | $1,750.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 85 | Removing structure (box culvert) (496-7001) | EACH | 1 | $10,000 | $21,070 | $2,500.00 | $8,529.00 | $10,100 | $1,000.00 | $1,000.00 |
| 86 | Removing structure (inlet) (496-7002) | EACH | 6 | $1,500.00 | $3,610.00 | $1,200.00 | $3,400.00 | $700.00 | $600.00 | $600.00 |
| 87 | Removing structure (set) (496-7004) | EACH | 11 | $800.00 | $364.00 | $470.00 | $1,800.00 | $700.00 | $200.00 | $200.00 |
| 88 | Removing structure (headwall) (496-7006) | EACH | 5 | $4,500.00 | $1,960.00 | $900.00 | $1,500.00 | $2,100.00 | $800.00 | $800.00 |
| 89 | Removing structure (pipe) (496-7007) | LF | 8 | $1,400.00 | $203.00 | $100.00 | $48.00 | $45.00 | $1,800.00 | $800.00 |
| 90 | Remove STR (rail) (496-7017) | LF | 240 | $27.00 | $2.10 | $78.00 | $20.00 | $60.00 | $21.62 | $70.00 |
| 91 | Mobilization (500-7001) | LS | 1 | $1,829,663 | $1,826,000 | $2,000,000 | $1,200,000 | $2,200,000 | $2,154,759 | $2,180,000 |
| 92 | Barricades, signs and traffic handling (502-7001) | MO | 26 | $16,000 | $3,850.00 | $12,000 | $76,000 | $72,400 | $25,000 | $5,000.00 |
| 93 | Portable changeable message sign (503-7002) | EACH | 8 | $13,000 | $5,413.00 | $17,000 | $15,000 | $13,000 | $18,500 | $19,000 |
| 94 | TMA (stationary) (505-7001) | DAY | 560 | $250.00 | $202.00 | $300.00 | $1.00 | $235.00 | $502.00 | $250.00 |
| 95 | TMA (mobile operation) (505-7003) | DAY | 230 | $200.00 | $2,610.00 | $400.00 | $1.00 | $573.00 | $900.00 | $0.01 |
| 96 | Rock filter dams (install) (type 4) (506-7004) | LF | 390 | $75.00 | $55.00 | $61.00 | $55.00 | $127.00 | $47.16 | $55.00 |
| 97 | Rock filter dams (remove) (506-7011) | LF | 390 | $22.00 | $79.00 | $14.00 | $12.00 | $45.00 | $11.87 | $12.00 |
| 98 | Construction exits (install) (type 3) (506-7022) | SY | 500 | $40.00 | $26.00 | $28.00 | $25.00 | $91.90 | $32.96 | $25.00 |
| 99 | Construction exits (remove) (506-7024) | SY | 500 | $15.00 | $9.50 | $13.50 | $12.00 | $40.00 | $11.34 | $12.00 |
| 100 | Temporary sediment control fence (install) (506-7039) | LF | 3,099 | $5.50 | $5.00 | $4.50 | $4.00 | $2.70 | $5.02 | $4.00 |
| 101 | Temporary sediment control fence (remove) (506-7041) | LF | 3,099 | $2.00 | $0.95 | $1.25 | $1.00 | $1.25 | $0.93 | $1.00 |
| 102 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 330 | $6.00 | $4.80 | $6.00 | $5.00 | $4.75 | $7.80 | $5.00 |
| 103 | Biodegradable erosion control logs (remove) (506-7046) | LF | 330 | $2.00 | $2.60 | $3.50 | $3.00 | $2.00 | $0.93 | $3.00 |
| 104 | Constructing detours (508-7001) | SY | 1,193 | $125.00 | $86.00 | $140.00 | $100.00 | $87.00 | $200.00 | $160.00 |
| 105 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 16,880 | $70.00 | $36.00 | $80.00 | $42.00 | $50.00 | $42.00 | $64.00 |
| 106 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 400 | $70.00 | $34.00 | $78.00 | $42.00 | $56.00 | $42.00 | $58.00 |
| 107 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 3,780 | $20.00 | $8.50 | $27.50 | $12.00 | $8.00 | $12.00 | $15.00 |
| 108 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 160 | $25.00 | $6.50 | $27.50 | $12.00 | $10.00 | $12.00 | $21.00 |
| 109 | Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045) | LF | 5,280 | $35.00 | $12.00 | $13.75 | $18.00 | $10.00 | $18.00 | $21.00 |
| 110 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 11,600 | $20.00 | $5.50 | $13.75 | $20.00 | $10.00 | $20.00 | $24.00 |
| 111 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 400 | $25.00 | $4.40 | $17.00 | $20.00 | $9.00 | $20.00 | $28.00 |
| 112 | Portable concrete traffic barrier (pinning) (512-7071) | EACH | 140 | $75.00 | $119.00 | $74.00 | $60.00 | $80.00 | $60.00 | $64.00 |
| 113 | PTB (fur&inst)(SSCB or CSB)(type 1)or(steel) (512-7085) | LF | 870 | $110.00 | $54.00 | $72.00 | $40.00 | $22.00 | $40.00 | $46.00 |
| 114 | PTB (remove)(SSCB or CSB)(type 1)or(steel) (512-7088) | LF | 870 | $30.00 | $14.00 | $17.00 | $20.00 | $11.00 | $20.00 | $24.00 |
| 115 | Colored textured concrete (4") (527-7001) | SY | 1,440 | $81.00 | $107.00 | $111.00 | $185.00 | $97.00 | $135.10 | $100.00 |
| 116 | Concrete curb & gutter (type II) (529-7009) | LF | 21,876 | $40.00 | $35.00 | $31.55 | $35.00 | $30.00 | $25.00 | $25.00 |
| 117 | Driveways (concrete) (530-7006) | SY | 3,488 | $130.00 | $85.00 | $133.00 | $93.00 | $120.00 | $135.04 | $120.00 |
| 118 | Driveways (ACP) (530-7010) | SY | 842 | $90.00 | $124.00 | $218.00 | $134.00 | $120.00 | $80.34 | $240.00 |
| 119 | Concrete sidewalks (4") (531-7001) | SY | 2,655 | $125.00 | $67.00 | $85.25 | $77.00 | $62.00 | $95.29 | $68.00 |
| 120 | Curb ramps (type 1) (531-7005) | EACH | 2 | $2,850.00 | $2,420.00 | $2,675.00 | $2,485.00 | $1,800.00 | $2,642.82 | $2,400.00 |
| 121 | Curb ramps (type 5) (531-7008) | EACH | 4 | $3,410.00 | $2,610.00 | $5,325.00 | $2,995.00 | $2,200.00 | $5,285.62 | $4,800.00 |
| 122 | Curb ramps (type 7) (531-7010) | EACH | 10 | $2,955.00 | $2,590.00 | $2,550.00 | $2,485.00 | $2,200.00 | $2,785.62 | $2,300.00 |
| 123 | Curb ramps (type 22) (531-7014) | EACH | 3 | $4,475.00 | $12,060 | $5,450.00 | $2,485.00 | $3,600.00 | $5,385.63 | $4,900.00 |
| 124 | Concrete sidewalk (retaining wall) (531-7026) | CY | 75 | $230.00 | $1,280.00 | $1,350.00 | $1,150.00 | $1,200.00 | $1,615.05 | $1,200.00 |
| 125 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,063 | $30.00 | $22.00 | $26.25 | $23.00 | $22.50 | $30.25 | $22.50 |
| 126 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,275.00 | $1,800.00 | $2,190.00 | $1,800.00 | $1,800.00 | $2,572.50 | $2,300.00 |
| 127 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,500.00 | $1,510.00 | $1,825.00 | $1,200.00 | $1,200.00 | $1,210.00 | $1,200.00 |
| 128 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 50 | $100.00 | $91.00 | $110.00 | $75.00 | $75.00 | $108.50 | $75.00 |
| 129 | Remove metal beam guard fence (542-7001) | LF | 807 | $6.00 | $2.60 | $3.05 | $2.00 | $2.50 | $3.00 | $2.50 |
| 130 | Remove terminal anchor section (542-7002) | EACH | 9 | $500.00 | $251.00 | $305.00 | $150.00 | $150.00 | $220.00 | $150.00 |
| 131 | Remove downstream anchor terminal (542-7003) | EACH | 9 | $500.00 | $251.00 | $305.00 | $150.00 | $150.00 | $230.00 | $150.00 |
| 132 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $290.00 | $251.00 | $305.00 | $200.00 | $200.00 | $260.00 | $200.00 |
| 133 | Cable barrier (remove) (543-7037) | LF | 2,207 | $5.00 | $4.40 | $5.60 | $3.00 | $3.00 | $3.85 | $3.00 |
| 134 | Cable barrier terminal section (remove) (543-7038) | EACH | 4 | $335.00 | $1,320.00 | $560.00 | $300.00 | $300.00 | $515.00 | $300.00 |
| 135 | Guardrail end treatment (remove) (544-7003) | EACH | 8 | $335.00 | $251.00 | $305.00 | $250.00 | $250.00 | $330.00 | $250.00 |
| 136 | GDRL end TRTMT(retro W/O head)(WD post) (544-7011) | EACH | 7 | $1,930.00 | $2,350.00 | $2,900.00 | $2,950.00 | $2,950.00 | $2,700.00 | $2,950.00 |
| 137 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 305 | $20.00 | $24.00 | $29.10 | $17.00 | $17.00 | $13.90 | $26.25 |
| 138 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 460 | $30.00 | $26.00 | $31.45 | $18.00 | $18.00 | $17.40 | $28.35 |
| 139 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 2,110 | $40.00 | $32.00 | $60.55 | $40.00 | $40.00 | $30.80 | $54.60 |
| 140 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 45 | $35.00 | $32.00 | $33.80 | $19.00 | $19.00 | $26.60 | $30.45 |
| 141 | Electrical conductor (no.6) bare (620-7009) | LF | 2,875 | $3.00 | $4.40 | $3.50 | $1.75 | $1.75 | $2.20 | $3.15 |
| 142 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 2,245 | $3.50 | $4.40 | $3.50 | $3.20 | $3.20 | $2.30 | $3.15 |
| 143 | Ground box type D (162922) (624-7007) | EACH | 1 | $1,500.00 | $1,250.00 | $1,750.00 | $1,025.00 | $1,025.00 | $1,538.00 | $1,575.00 |
| 144 | Ground box type D (162922)W/apron (624-7008) | EACH | 18 | $1,800.00 | $1,520.00 | $2,330.00 | $1,100.00 | $1,100.00 | $1,632.00 | $2,100.00 |
| 145 | Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147) | EACH | 1 | $10,000 | $6,800.00 | $11,100 | $6,900.00 | $6,900.00 | $10,596 | $9,975.00 |
| 146 | Aluminum signs (type A) (636-7001) | SF | 307 | $46.00 | $36.00 | $58.25 | $45.00 | $45.00 | $39.99 | $52.50 |
| 147 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 46 | $880.00 | $563.00 | $700.00 | $640.00 | $1,000.00 | $630.00 | $957.00 |
| 148 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,200.00 | $1,070.00 | $1,350.00 | $1,000.00 | $1,000.00 | $1,199.00 | $1,419.00 |
| 149 | Remove SM RD SN sup&AM (644-7073) | EACH | 33 | $175.00 | $70.00 | $88.00 | $75.00 | $150.00 | $79.00 | $259.00 |
| 150 | Install object marker assembly (OM-3R)(WFLX)GNDHH (658-7277) | EACH | 5 | $500.00 | $514.00 | $638.00 | $445.00 | $445.00 | $575.00 | $445.00 |
| 151 | Work zone pavement marking removing (W)4"(broken) (662-7061) | LF | 10,411 | $1.50 | $1.50 | $0.85 | $0.90 | $0.75 | $0.75 | $0.75 |
| 152 | Work zone pavement marking removing (W)4"(DOT) (662-7062) | LF | 3,117 | $1.00 | $1.10 | $1.15 | $1.00 | $1.00 | $1.00 | $1.00 |
| 153 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 80,076 | $1.50 | $1.10 | $0.95 | $0.90 | $0.85 | $0.85 | $0.85 |
| 154 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 82,047 | $1.30 | $1.10 | $0.95 | $0.80 | $0.85 | $0.85 | $0.85 |
| 155 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,052 | $2.00 | $1.30 | $1.15 | $1.00 | $1.00 | $1.00 | $1.25 |
| 156 | Work zone pavement marking SHT terminal remove (W)(4") (662-7115) | LF | 1,052 | $1.00 | $1.30 | $2.00 | $3.00 | $1.00 | $2.00 | $5.00 |
| 157 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 10,258 | $0.90 | $1.20 | $1.05 | $1.00 | $0.95 | $0.95 | $0.95 |
| 158 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 848 | $0.90 | $3.60 | $4.40 | $3.00 | $3.95 | $3.95 | $3.95 |
| 159 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,664 | $8.00 | $8.00 | $7.65 | $6.70 | $6.90 | $6.90 | $6.90 |
| 160 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 102 | $125.00 | $143.00 | $153.00 | $149.00 | $138.00 | $138.00 | $138.00 |
| 161 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 2 | $250.00 | $193.00 | $220.00 | $180.00 | $197.00 | $197.00 | $197.00 |
| 162 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 100 | $185.00 | $171.00 | $184.05 | $160.00 | $166.00 | $166.00 | $166.00 |
| 163 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 2,250 | $3.05 | $4.20 | $4.40 | $2.75 | $3.95 | $3.95 | $3.95 |
| 164 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 23,868 | $2.15 | $1.80 | $0.80 | $0.55 | $0.70 | $0.70 | $0.70 |
| 165 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 9,717 | $1.00 | $1.80 | $0.80 | $0.53 | $0.70 | $0.70 | $0.70 |
| 166 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 22,215 | $1.25 | $1.80 | $0.80 | $0.53 | $0.70 | $0.70 | $0.70 |
| 167 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 84 | $20.00 | $5.50 | $4.75 | $4.00 | $4.25 | $4.25 | $4.25 |
| 168 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,002 | $8.00 | $4.40 | $4.75 | $4.00 | $4.25 | $4.25 | $4.25 |
| 169 | Eliminating existing PM & markers (4") (677-7001) | LF | 66,796 | $1.50 | $0.45 | $0.45 | $0.47 | $0.38 | $0.38 | $0.38 |
| 170 | Eliminating existing PM & markers (8") (677-7004) | LF | 10,020 | $1.60 | $0.45 | $0.85 | $0.69 | $0.74 | $0.74 | $0.74 |
| 171 | Eliminating existing PM & markers (12") (677-7006) | LF | 510 | $2.40 | $0.45 | $1.70 | $2.00 | $1.50 | $1.50 | $1.50 |
| 172 | Eliminating existing PM & markers (24") (677-7008) | LF | 310 | $5.30 | $0.45 | $2.25 | $2.90 | $2.00 | $2.00 | $2.00 |
| 173 | Removing traffic signals (680-7004) | EACH | 4 | $11,050 | $11,950 | $4,700.00 | $5,000.00 | $5,000.00 | $19,504 | $4,200.00 |
| 174 | Install highway traffic signal (upgrade) (680-7011) | EACH | 4 | $30,000 | $47,420 | $25,650 | $11,100 | $11,100 | $35,389 | $23,100 |
| 175 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 46 | $700.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 176 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 32 | $410.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 177 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 46 | $700.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 178 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 30 | $410.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 179 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 46 | $700.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 180 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 18 | $410.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 181 | Vehicle signal section (12")LED(green U-turn arrow) (682-7007) | EACH | 1 | $410.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 182 | Vehicle signal section (12")LED(yel U-turn arrow) (682-7008) | EACH | 1 | $410.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 183 | Vehicle signal section (12")LED(red U-turn arrow) (682-7009) | EACH | 1 | $410.00 | $379.00 | $641.00 | $300.00 | $300.00 | $302.00 | $578.00 |
| 184 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 18 | $1,000.00 | $898.00 | $1,250.00 | $690.00 | $690.00 | $832.00 | $1,124.00 |
| 185 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 51 | $300.00 | $296.00 | $233.00 | $150.00 | $150.00 | $228.00 | $210.00 |
| 186 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 2 | $300.00 | $357.00 | $250.00 | $215.00 | $215.00 | $241.00 | $221.00 |
| 187 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 12 | $300.00 | $364.00 | $260.00 | $225.00 | $225.00 | $261.00 | $231.00 |
| 188 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 3,295 | $3.00 | $4.80 | $2.35 | $2.65 | $2.65 | $2.20 | $2.10 |
| 189 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 6,185 | $5.00 | $4.80 | $3.50 | $3.45 | $3.45 | $3.70 | $3.15 |
| 190 | Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042) | LF | 2,755 | $6.00 | $4.80 | $7.00 | $5.60 | $5.60 | $5.40 | $6.30 |
| 191 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 1 | $20,000 | $15,200 | $21,000 | $21,600 | $21,600 | $21,966 | $18,900 |
| 192 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 2 | $20,000 | $13,220 | $18,650 | $19,800 | $19,800 | $19,511 | $16,800 |
| 193 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 3 | $47,500 | $32,350 | $45,500 | $41,300 | $41,300 | $45,131 | $40,950 |
| 194 | Ins traffic signal PL AM(S)1 arm(65') (686-7065) | EACH | 3 | $39,500 | $26,370 | $37,255 | $41,300 | $41,300 | $36,743 | $33,600 |
| 195 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 3 | $59,500 | $33,020 | $46,570 | $41,900 | $41,900 | $46,413 | $42,000 |
| 196 | Pedestrian pole assembly (687-7001) | EACH | 14 | $3,750.00 | $1,770.00 | $5,475.00 | $2,500.00 | $2,500.00 | $2,753.00 | $4,935.00 |
| 197 | Pedestrian detect push button (APS) (688-7001) | EACH | 18 | $1,200.00 | $821.00 | $1,140.00 | $1,000.00 | $1,000.00 | $1,227.00 | $1,025.00 |
| 198 | Pedestrian detector controller unit (688-7003) | EACH | 3 | $5,000.00 | $3,540.00 | $4,075.00 | $3,965.00 | $3,965.00 | $5,266.00 | $3,675.00 |
| 199 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 76 | $250.00 | $1,350.00 | $1,335.00 | $500.00 | $700.00 | $899.61 | $2,000.00 |
| 200 | VIVDS cabling (6006-7007) | LF | 3,050 | $3.10 | $4.80 | $3.50 | $5.60 | $5.60 | $3.60 | $3.15 |
| 201 | VIVDS cam assy (relocate) (6006-7014) | EACH | 8 | $940.00 | $640.00 | $1,400.00 | $680.00 | $680.00 | $1,341.00 | $1,260.00 |
| 202 | VIVDS cable (cat 6) (6006-7026) | LF | 575 | $6.00 | $4.80 | $3.50 | $4.00 | $4.00 | $2.20 | $3.15 |
| 203 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $10,000 | $9,300.00 | $9,500.00 | $9,800.00 | $9,800.00 | $11,492 | $8,505.00 |
| 204 | RVDS (presence detection only) (6008-7001) | EACH | 15 | $8,000.00 | $7,620.00 | $1,955.00 | $10,685 | $10,685 | $12,471 | $1,760.00 |
| 205 | RVDS (advance detection only) (6008-7002) | EACH | 8 | $11,000 | $6,200.00 | $1,955.00 | $8,645.00 | $8,645.00 | $10,514 | $1,760.00 |
| 206 | Relocate ITS radio (6014-7006) | EACH | 2 | $5,000.00 | $640.00 | $530.00 | $395.00 | $395.00 | $1,018.00 | $475.00 |
| 207 | Relocate CCTV field equipment (6018-7007) | EACH | 2 | $8,750.00 | $640.00 | $880.00 | $590.00 | $590.00 | $4,139.00 | $790.00 |
| 208 | Exploratory excavation of existing utility (7026-7018) | EACH | 20 | $450.00 | $475.00 | $1,000.00 | $800.00 | $1,500.00 | $684.00 | $700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.