TxDOT contract A00135447 bid tabulation

Bridge Replacement, US 77 (0.10 MILES SOUTH OF N. JAEGER STREET to NORTH OF INDEPENDENCE STREET). Let by Texas DOT on August 7, 2025, Lee, Austin District. 10 bids received; low bid $13,219,085 by Acme Bridge Company, Inc., -11% against the engineer's estimate of $14,780,998.

Owner
Texas DOT
Letting
07 AUG 2025
Pay items
112
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Acme Bridge Company, Inc.$13,219,085Low-11%
2Altus Construction LLC$14,346,153+9.0%-3.0%
3Urban Infraconstruction LLC$14,375,000+9.0%-3.0%
4Hunter Industries, LTD.$15,389,855+16%+4.0%
5James Construction Group, LLC$15,867,338+20%+7.0%
6Copasa Inc$16,819,807+27%+14%
7C. E. Barker, LTD.$16,951,573+28%+15%
8Harper Brothers Construction LLC$17,553,803+33%+19%
9Jay-Reese Contractors, Inc.$20,631,697+56%+40%
10McMillen, Inc.$22,759,069+72%+54%
TxDOT contract A00135447: bids by rank

Engineer's estimate: $14,780,998.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Acme Bridge Company, Inc.2. Altus Construction LLC3. Urban Infraconstruction LLC4. Hunter Industries, LTD.5. James Construction Group, LLC6. Copasa Inc
1Preparing row (100-7002)STA15.62$8,500.00$3,220.00$90,927$92,029$3,977.61$67,421$107,934
2Removing concrete (riprap) (104-7006)SY390$37.50$16.50$29.33$13.24$35.30$23.15$20.00
3Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY208$60.00$15.50$11.00$4.45$5.43$14.38$25.00
4Remove (6") TRT/untrt base & asphalt pavement (105-7026)SY7,597$25.00$6.10$7.09$5.94$4.74$6.63$8.30
5Excavation (roadway) (110-7001)CY12,259.90$24.50$15.00$7.05$11.20$32.91$39.42$22.61
6Embankment (final)(OC)(type B) (132-7003)CY13,172.10$22.50$16.90$23.40$4.21$53.45$70.36$23.08
7Furn & place topsoil (4") (160-7002)SY1,000$3.00$4.20$2.93$3.00$8.86$4.57$18.00
8Broadcast seed (permanent_rural_sand) (164-7001)SY1,000$2.80$0.61$0.73$0.58$0.65$1.00$2.00
9Soil ret BLKT(SL_mod_clay_short) (169-7001)SY1,000$1.70$1.45$1.65$1.35$1.50$2.50$3.00
10FL BS (compacted in place)(type A GR 5)(final pos) (247-7179)CY53$85.00$324.00$78.13$118.63$131.74$175.48$251.03
11FL BS (compacted in place)(type D GR 5)(final pos) (247-7191)CY1,512$85.00$120.00$44.68$69.57$74.94$92.10$104.73
12Prime coat (multi option) (310-7015)GAL1,336$5.10$5.30$4.64$5.55$9.46$4.75$5.60
13D-GR HMA type-B PG64-22 (341-7001)TON1,837$125.00$140.00$135.52$132.25$103.19$125.00$132.25
14D-GR HMA type D PG76-22 (341-7056)TON735$205.00$189.00$198.49$172.60$119.22$169.00$172.60
15Tack coat (341-7082)GAL1,203$4.00$4.65$4.06$6.40$4.40$4.15$6.40
16Tom-C PG76-22 sac-A (347-7001)TON368$310.00$224.00$195.55$245.30$163.13$200.00$245.30
17Plan & text concrete pavement(0" to 0.5") (354-7023)SY6,681$5.00$3.55$3.89$3.45$1.66$1.75$6.00
18Planing asphalt concrete pavement(0" to 0.5" micro) (354-7044)SY44$0.25$279.00$244.43$5.00$2.88$253.00$25.00
19Concrete pavement (CRCP)(hes) (11") (360-7050)SY400$125.00$165.00$90.92$126.17$150.00$154.63$150.00
20Cut & restore asphalt paving (400-7008)SY307$250.00$333.00$98.75$112.08$145.00$145.55$284.65
21Cem stabil BKFL (400-7010)CY2,234$260.00$107.00$138.20$1.00$105.00$168.25$160.89
22Trench excavation protection (402-7001)LF810$26.00$19.10$11.73$2.11$25.00$9.90$18.00
23Temporary special shoring (403-7001)SF15,666$32.00$42.10$37.91$44.30$43.50$84.15$39.90
24Drilled shaft (36 in) (416-7006)LF1,575$310.00$320.00$332.62$219.07$304.52$228.13$255.32
25Drilled shaft (42 in) (416-7007)LF912$395.00$328.00$385.93$323.77$451.61$299.44$297.43
26Class B concrete (flume) (420-7010)CY18$950.00$845.00$890.49$488.83$1,100.00$996.63$2,099.59
27Class C concrete (abutment) (420-7012)CY130.90$1,340.00$1,080.00$1,041.66$1,000.00$1,600.00$1,350.94$1,357.79
28Class C concrete (cap) (420-7022)CY185.50$1,650.00$1,270.00$1,165.07$1,100.00$1,500.00$1,300.55$1,450.19
29Class C concrete (column) (420-7038)CY125.50$1,725.00$1,160.00$1,234.00$1,200.00$1,010.00$1,049.06$1,602.38
30Class C concrete (crashwall) (420-7050)CY228.80$1,200.00$1,010.00$602.44$964.58$1,400.00$1,080.29$1,227.27
31Reinforced concrete slab (422-7001)SF29,771.50$28.00$30.00$17.76$25.00$29.00$25.97$27.86
32Bridge sidewalk (422-7012)SF4,104$35.00$13.90$12.55$12.11$14.77$24.55$16.71
33Approach slab (422-7013)CY534.40$800.00$733.00$413.05$500.00$750.00$577.05$578.18
34Retaining wall (MSE) (423-7001)SF31,777$90.00$72.05$90.60$103.25$99.26$93.16$97.92
35Retaining wall (temporary wall) (423-7012)SF1,092$26.00$36.00$23.47$30.00$36.00$61.17$37.40
36Prestressed concrete girder (TX40) (425-7003)LF1,965.55$200.00$228.00$179.07$200.00$190.00$222.52$206.64
37Riprap (concrete)(4 in) (432-7001)CY25$940.00$721.00$549.97$765.64$1,022.34$556.64$616.00
38Riprap (mow strip)(4 in) (432-7013)CY255$760.00$624.00$405.95$463.68$787.20$679.53$625.00
39Riprap (stone common)(dry)(8 in) (432-7030)CY6.70$280.00$206.00$196.16$303.13$318.79$427.79$280.00
40Elastomeric bearing (EE6) (434-7008)EACH11$3,100.00$3,060.00$1,844.97$2,253.05$2,500.00$2,688.71$2,887.00
41Elastomeric bearing (EF6) (434-7017)EACH11$4,800.00$3,060.00$1,844.97$2,253.05$2,500.00$2,688.71$2,377.00
42STR steel (plate girder) (442-7001)LB901,135.30$2.40$2.67$2.41$2.20$2.91$2.41$2.46
43STR steel (miscellaneous non-bridge) (442-7007)LB1,043.80$25.00$22.50$14.67$29.59$28.13$21.94$24.71
44Rail (type T221) (450-7004)LF342$250.00$87.50$171.41$89.94$77.30$96.64$153.09
45Rail (type C221) (450-7032)LF1,242$185.00$114.00$178.73$117.91$109.43$120.60$176.03
46Rail (CLF-RO) (450-7049)LF313.70$162.00$79.90$123.19$90.00$92.70$134.12$180.00
47Rail (CLF-RO)(mod) (450-7073)LF300.20$162.00$81.30$124.66$110.00$113.30$140.98$250.00
48Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF579.44$225.00$241.00$163.20$200.67$225.00$199.48$212.65
49Concrete box culvert (3 FT X 2 FT) (462-7001)LF87$375.00$336.00$420.18$453.40$350.00$318.81$530.71
50RC pipe (CL III)(24 in) (464-7005)LF728$120.00$85.90$141.26$79.59$170.00$102.48$106.10
51Junction box(complete)(PJB)(5FTX5FT) (465-7009)EACH1$10,000$8,180.00$8,799.54$6,647.11$14,000$5,704.64$8,250.21
52Inlet (complete)(pco)(5FT)(right) (465-7023)EACH1$23,000$12,100$6,874.64$9,442.65$17,000$12,139$11,567
53Inlet (complete)(pco)(5FT)(both) (465-7024)EACH2$9,900.00$8,800.00$7,097.75$6,438.75$13,000$9,189.41$8,819.26
54Wingwall (PW - 2) (HW=4 FT) (466-7188)EACH2$11,700$10,200$8,555.11$12,265$7,500.00$23,204$15,000
55Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH4$2,200.00$2,000.00$1,568.52$1,448.07$2,800.00$1,303.41$2,882.03
56Removing structure (headwall) (496-7006)EACH6$1,750.00$313.00$1,569.04$1,573.49$1,100.00$1,402.47$2,250.00
57Removing structure (pipe) (496-7007)LF255$46.00$21.30$23.03$59.95$13.00$31.12$33.83
58Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$150,000$260,000$239,739$337,273$325,000$192,933$274,039
59Mobilization (500-7001)LS1$1,193,580$1,020,000$1,427,455$1,437,500$1,205,523$827,833$1,815,233
60Barricades, signs and traffic handling (502-7001)MO12$9,250.00$12,900$3,666.48$6,800.00$6,058.74$7,106.37$15,000
61Portable changeable message sign (503-7002)EACH1$8,000.00$20,300$7,048.53$15,909$7,740.38$14,658$5,384.07
62TMA (stationary) (505-7001)DAY162$225.00$285.00$162.99$350.00$180.61$786.94$500.00
63Temporary sediment control fence (install) (506-7039)LF1,655$4.50$3.15$3.35$3.00$3.34$4.25$3.60
64Temporary sediment control fence (remove) (506-7041)LF1,655$1.80$1.05$1.01$1.00$1.11$1.25$1.20
65Biodegradable erosion control logs (install) (8") (506-7043)LF60$8.90$5.80$5.54$5.50$6.13$6.00$10.00
66Biodegradable erosion control logs (remove) (506-7046)LF60$3.00$1.05$1.47$1.00$1.11$1.00$2.50
67PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089)LF1,092$50.00$19.00$53.56$25.58$65.00$47.38$100.00
68PCTB (move)(F-shape or SNGL SLP)type 1 (512-7090)LF480$25.00$8.60$17.38$12.97$34.00$19.18$35.00
69PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092)LF1,092$26.00$19.90$21.78$13.32$45.00$13.00$30.00
70Concrete curb & gutter (type II) (529-7009)LF1,176$70.00$41.20$45.83$48.38$45.44$40.07$35.00
71Driveways (concrete) (530-7006)SY321$125.00$88.10$88.00$179.93$106.78$95.35$125.00
72Concrete sidewalks (4") (531-7001)SY948$85.00$40.00$134.64$47.99$96.55$76.25$106.32
73Curb ramps (type 1) (531-7005)EACH2$3,370.00$2,430.00$2,493.20$1,784.86$2,385.46$2,865.67$5,000.00
74Metal W-beam guard fence (timber post) (540-7001)LF729$25.00$29.50$21.04$26.00$26.78$23.00$26.00
75Metal beam guard fence trans (thrie-beam) (540-7005)EACH2$2,400.00$2,600.00$1,833.24$2,000.00$2,060.00$1,550.00$2,000.00
76Remove metal beam guard fence (542-7001)LF767$4.50$0.62$2.36$0.55$0.57$3.00$0.55
77Remove terminal anchor section (542-7002)EACH4$325.00$283.00$202.02$250.00$257.50$200.00$250.00
78Guardrail end treatment (install) (544-7001)EACH2$2,500.00$3,630.00$2,443.00$3,200.00$3,296.00$3,000.00$3,200.00
79Guardrail end treatment (remove) (544-7003)EACH4$345.00$227.00$234.65$200.00$206.00$200.00$200.00
80Crash cushion attenuator (move & reset) (545-7002)EACH2$1,600.00$2,830.00$1,206.27$2,500.00$2,575.00$3,000.00$2,500.00
81Crash cushion attenuator (remove) (545-7004)EACH2$1,100.00$2,270.00$733.30$2,500.00$2,060.00$1,000.00$2,000.00
82Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH2$12,000$31,700$23,465$28,000$28,840$28,400$28,000
83Pipe underdrains (type 6)(8") (556-7010)LF1,927$45.00$26.30$7.91$26.22$41.90$32.06$15.00
84Remove RD IL asm (bridge mount) (610-7006)EACH4$200.00$1,060.00$1,539.92$750.00$937.00$900.00$490.00
85In RD IL (U/P) (type 2) (150W EQ) LED (610-7016)EACH20$1,600.00$1,200.00$1,036.39$1,060.00$1,651.88$1,060.00$1,060.00
86In RD IL (type SA) 40B-8 (250W EQ) LED (610-7108)EACH4$1,450.00$5,090.00$4,399.77$4,500.00$5,062.99$4,500.00$4,500.00
87Conduit (PVC) (schedule 80) (4") (618-7064)LF415$38.00$25.40$21.95$22.45$23.04$22.45$22.45
88Conduit (RM) (3/4") (618-7070)LF2,375$22.00$16.20$13.98$14.30$21.99$14.30$14.30
89Electrical conductor (no.8) bare (620-7007)LF2,955$2.00$1.35$1.17$1.20$2.55$1.20$1.20
90Electrical conductor (no.8) insulated (620-7008)LF11,100$2.10$1.60$1.40$1.43$3.02$1.43$1.43
91Ground box type D (162922)W/apron (624-7008)EACH2$1,600.00$2,440.00$2,107.00$2,155.00$1,373.32$2,155.00$2,155.00
92Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009)EACH1$6,700.00$7,350.00$6,355.23$6,500.00$7,560.62$6,500.00$6,500.00
93Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH5$900.00$351.00$733.30$332.00$341.96$670.00$332.00
94Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH4$900.00$438.00$928.84$415.00$427.45$855.00$415.00
95Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH2$1,200.00$517.00$977.73$490.00$504.70$1,075.00$490.00
96Remove SM RD SN sup&AM (644-7073)EACH2$150.00$158.00$97.77$150.00$154.50$110.00$150.00
97Install delineator assembly (D-SY)SZ 1(yflx)GF2(BI) (658-7022)EACH8$24.00$37.00$48.89$35.00$36.05$30.00$35.00
98Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH16$35.00$21.10$29.33$20.00$20.60$24.50$20.00
99Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF120$1.00$17.40$2.93$3.00$10.60$3.00$16.50
100Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF11$7.00$34.80$19.55$20.00$25.00$20.00$33.00
101Work zone pavement marking non-removing(W)(word) (662-7030)EACH3$90.00$211.00$342.20$350.00$520.00$350.00$200.00
102Work zone pavement marking removing (W)24"(solid) (662-7077)LF22$17.00$37.00$19.55$20.00$25.00$20.00$35.00
103Work zone pavement marking removing (Y)4"(solid) (662-7097)LF1,383$0.85$2.65$2.20$2.25$7.00$2.25$2.50
104Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF113$1.75$4.20$3.42$3.50$2.50$3.50$4.00
105Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF38$11.00$14.80$14.67$15.00$10.60$15.00$14.00
106Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF2,680$0.85$1.60$0.73$0.75$1.60$0.75$1.50
107Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF670$1.00$3.15$1.96$2.00$1.60$2.00$3.00
108Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF670$0.70$3.15$1.96$2.00$1.60$2.00$3.00
109Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF2,680$1.00$3.15$1.47$1.50$1.60$1.50$3.00
110Reflectorized pavement marker type I-C (672-7002)EACH34$7.00$7.70$4.64$4.75$10.60$4.75$7.25
111Reflectorized pavement marker type II-A-A (672-7004)EACH68$7.50$7.70$4.64$4.75$10.60$4.75$7.25
112Pavement surface preparation for marking (6") (678-7002)LF2,952$0.36$0.26$0.39$0.40$1.60$0.40$0.25
TxDOT contract A00135447: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy