TxDOT contract A00192185 bid tabulation

Bridge Replacement, FM 2004 (At Highland Bayou to .). Let by Texas DOT on September 2, 2026, Galveston, Houston District. 11 bids received; low bid $3,199,825 by R Construction Civil, LLC, -5.2% against the engineer's estimate of $3,375,346.

Owner
Texas DOT
Letting
02 SEP 2026
Pay items
83
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1R Construction Civil, LLC$3,199,825Low-5.0%
2James Construction Group, LLC$3,607,643+13%+7.0%
3Isi Contracting, Inc.$3,636,684+14%+8.0%
4Texas Steel Industrial Placing, LLC$3,701,646+16%+10%
5MC2 Civil, LLC$3,727,075+16%+10%
6Ser Construction Partners, LLC$3,807,901+19%+13%
7Castillo Aranda LLC$3,845,653+20%+14%
8Forde Construction Company, Inc.$3,853,055+20%+14%
9Ragle Construction, Inc.$3,992,820+25%+18%
10John Reed and Company, LLC$4,065,253+27%+20%
11Rexcon Enterprises, LLC$4,447,136+39%+32%
TxDOT contract A00192185: bids by rank

Engineer's estimate: $3,375,346.

Bid tabulation

LinePay itemUnitQuantityEstimate1. R Construction Civil, LLC2. James Construction Group, LLC3. Isi Contracting, Inc.4. Texas Steel Industrial Placing, LLC5. MC2 Civil, LLC6. Ser Construction Partners, LLC
1Remove (10") TRT/untrt base & asphalt pavement (105-7030)SY4,028$12.50$13.00$11.45$9.00$8.00$8.50$16.40
2Excavation (roadway) (110-7001)CY2,830$20.00$21.00$12.17$19.00$20.00$25.00$27.50
3Subgr widen (OC) (112-7001)STA6$5,000.00$985.00$109.38$998.00$5,000.00$1,600.00$1,280.10
4Embankment (final)(DC)(type C) (132-7006)CY742$20.00$32.50$19.96$51.00$25.00$20.00$2.70
5Broadcast seed (permanent_rural_clay) (164-7002)SY2,780$0.25$1.00$0.54$0.36$0.54$0.40$0.30
6Soil ret BLKT(SL_mod_clay_short_roll) (169-7009)SY93$0.25$2.00$1.35$4.37$1.35$15.00$11.10
7Lime (com or QK)(slurry) or QK(dry) (260-7001)TON60$350.00$350.00$371.53$366.00$332.00$350.00$381.00
8Lime TRT (existing material)(6") (260-7006)SY4,439$3.00$5.00$8.44$15.00$6.00$6.00$7.40
9Cem TRT(PLNT MX)(CL N)(tya)(GR1-2)(8") (276-7281)SY4,439$20.00$37.00$17.58$35.00$20.00$36.00$40.50
10Prime coat(MC-30 or AE-P) (310-7013)GAL889$5.00$6.50$6.63$6.48$8.00$4.00$3.30
11Asphalt (AC-20-5TR) (316-7007)GAL1,820$5.00$6.00$6.12$5.47$8.00$4.50$16.70
12Aggregate (type-B, GR-3)(sac-B) (316-7171)CY41$350.00$560.00$561.00$598.00$280.00$550.00$44.60
13SP mixes SP-B PG70-22 (344-7004)TON1,444$175.00$165.00$165.00$195.00$210.00$135.00$150.40
14SP mixes SP-D sac-A PG70-22 (344-7052)TON666$200.00$200.00$200.00$258.00$210.00$150.00$176.90
15Drilled shaft (36 in) (416-7006)LF1,751$320.00$410.00$360.00$429.00$500.00$600.00$461.70
16Class C concrete (abutment) (420-7012)CY85$1,200.00$660.00$946.19$1,997.00$1,100.00$1,400.00$1,753.20
17Class C concrete (cap) (420-7022)CY79.60$1,500.00$775.00$1,135.34$785.00$1,500.00$1,300.00$1,610.20
18Reinforced concrete slab (422-7001)SF11,541$30.00$24.50$40.00$31.00$22.00$20.00$31.30
19Approach slab (422-7013)CY114.90$1,000.00$800.00$571.30$760.00$550.00$710.00$838.60
20Prestressed concrete girder (TX28) (425-7001)LF1,493.30$250.00$203.00$250.00$165.00$230.00$210.00$239.40
21Riprap (concrete)(4 in) (432-7001)CY92$625.00$610.00$490.40$563.00$550.00$750.00$714.50
22Riprap (concrete)(CL B) (432-7005)CY50.30$625.00$570.00$522.78$482.00$550.00$650.00$713.30
23Riprap (mow strip)(4 in) (432-7013)CY22$650.00$610.00$709.98$1,000.00$600.00$1,000.00$814.30
24STR steel (miscellaneous non-bridge) (442-7007)LB374$5.00$24.00$26.53$15.00$35.00$25.00$17.60
25Rail (type C223) (450-7034)LF358$135.00$250.00$162.38$307.00$220.00$220.00$231.20
26Rail (type PR22) (450-7045)LF378$150.00$210.00$155.13$117.00$175.00$175.00$245.30
27Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF165$225.00$185.00$198.39$178.00$200.00$180.00$201.70
28RC pipe (CL III)(36 in) (464-7009)LF233$225.00$143.00$137.86$407.00$200.00$200.00$210.00
29Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH2$7,000.00$4,150.00$5,181.66$4,901.00$5,000.00$7,000.00$9,195.30
30Removing structure (set) (496-7004)EACH2$750.00$1,250.00$549.40$1,512.00$750.00$800.00$1,019.50
31Removing structure (pipe) (496-7007)LF26$35.00$48.00$37.83$47.00$50.00$50.00$43.10
32Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$100,000$76,000$312,000$79,272$200,000$200,000$74,917
33Removing structure (approach slab) (496-7022)EACH2$5,000.00$820.00$2,981.42$1,832.00$5,000.00$1,500.00$116.40
34Mobilization (500-7001)LS1$320,000$184,000$360,000$300,000$370,131$370,000$380,000
35Barricades, signs and traffic handling (502-7001)MO6$12,000$13,200$10,000$8,106.00$4,000.00$5,000.00$3,156.30
36Portable changeable message sign (503-7001)DAY656$100.00$56.00$73.96$89.00$90.00$80.00$113.60
37TMA (stationary) (505-7001)DAY10$275.00$443.00$308.68$212.00$250.00$350.00$378.80
38TMA (mobile operation) (505-7003)DAY3$300.00$1,000.00$673.41$930.00$1,000.00$650.00$973.60
39Rock filter dams (install) (type 2) (506-7002)LF208$40.00$40.00$38.00$44.00$38.00$35.00$89.10
40Rock filter dams (remove) (506-7011)LF208$10.00$21.00$20.00$29.00$20.00$15.00$22.30
41Temporary sediment control fence (install) (506-7039)LF1,351$5.00$3.25$3.00$6.32$3.00$2.25$2.00
42Temporary sediment control fence (remove) (506-7041)LF1,351$1.00$1.00$1.00$1.62$1.00$0.60$0.70
43Biodegradable erosion control logs (install) (8") (506-7043)LF190$5.00$9.00$8.50$6.15$8.50$8.50$6.70
44Biodegradable erosion control logs (remove) (506-7046)LF190$1.00$1.00$1.00$1.32$1.00$3.50$2.20
45Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF174$10.00$27.00$25.87$30.63$30.00$12.00$22.60
46Concrete curb & gutter (type II) (529-7009)LF1,111$50.00$30.00$24.39$34.00$35.00$15.00$32.40
47Driveways (ACP) (530-7010)SY381$45.00$97.00$125.35$145.62$55.00$65.00$89.50
48Metal W-beam guard fence (steel post) (540-7002)LF237.50$40.00$33.00$32.50$30.24$32.70$33.00$36.20
49Downstream anchor terminal section (540-7015)EACH1$1,500.00$1,700.00$1,685.00$1,771.00$1,650.00$1,685.00$1,877.10
50Metal thrie-beam guard fence (steel post) (540-7020)EACH4$250.00$1,700.00$1,650.00$2,290.00$1,615.00$1,650.00$1,838.10
51Remove metal beam guard fence (542-7001)LF290$3.00$5.00$5.00$2.70$5.00$5.00$5.60
52RM metal beam guard fence trans (thrie-beam) (542-7004)EACH3$250.00$250.00$250.00$237.46$150.00$250.00$278.50
53Guardrail end treatment (install) (544-7001)EACH3$3,500.00$3,350.00$3,250.00$4,590.00$3,125.00$3,250.00$3,620.50
54Guardrail end treatment (remove) (544-7003)EACH3$300.00$250.00$250.00$324.01$275.00$250.00$278.50
55Crash cushion attenuator (remove) (545-7004)EACH1$1,000.00$1,500.00$1,500.00$1,890.00$2,500.00$1,500.00$1,671.00
56Mailbox install-D (TWG-post) type 2 (560-7003)EACH1$500.00$500.00$485.00$930.00$750.00$500.00$540.30
57Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH6$750.00$1,000.00$875.00$864.00$900.00$1,000.00$974.80
58Removing SM RD SN&AM (wayfinding) (644-7076)EACH4$250.00$125.00$100.00$108.00$250.00$1,000.00$111.40
59Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH19$40.00$35.00$35.00$103.00$45.00$50.00$39.00
60Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH4$175.00$120.00$95.00$103.00$100.00$75.00$105.80
61Remove delin & object marker assms (658-7078)EACH4$25.00$110.00$25.00$91.80$50.00$25.00$27.90
62Reflectorized pavement marking type I (W)8"(lane drop)(100MIL) (666-7021)LF85$1.50$4.00$2.50$3.24$2.50$2.50$3.30
63Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF100$1.50$4.00$1.25$3.15$1.25$1.25$3.30
64Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH3$200.00$180.00$200.00$147.00$200.00$200.00$206.10
65Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH1$200.00$205.00$250.00$168.00$250.00$250.00$211.70
66Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH2$50.00$128.00$65.00$105.00$65.00$65.00$111.40
67Reflectorized pavement marking type I(W)24"(solid)(100MIL)(callout) (666-7151)LF69$10.00$19.00$15.00$15.76$15.00$15.00$10.30
68All-wther PM type I (W)6"(solid)(100MIL) (666-7309)LF1,841$1.00$3.50$1.50$2.89$1.50$1.50$4.50
69All-wther PM type I (W)6"(broken)(100MIL) (666-7310)LF12$1.25$4.00$1.50$2.99$1.50$1.50$4.50
70All-wther PM type I (Y)6"(solid)(100MIL) (666-7315)LF1,965$1.00$3.50$1.50$2.89$1.50$1.50$4.50
71All-wther PM type I (Y)6"(broken)(100MIL) (666-7316)LF206$1.25$3.50$1.50$2.89$1.50$1.50$4.50
72Pavement sler 6" (666-7347)LF805$0.25$0.50$0.25$0.32$0.25$0.25$0.60
73Reflectorized pavement marker type I-C (672-7002)EACH6$5.00$8.00$10.00$6.25$10.00$10.00$8.90
74Reflectorized pavement marker type II-A-A (672-7004)EACH29$4.00$8.00$10.00$6.25$10.00$10.00$8.90
75Pavement surface preparation for marking (6") (678-7002)LF4,024$0.25$0.25$0.10$0.16$0.10$0.10$0.20
76Pavement surface preparation for marking (8") (678-7004)LF185$0.25$0.25$0.20$0.21$0.20$0.20$0.30
77Pavement surface preparation for marking (24") (678-7008)LF69$0.50$0.50$1.00$0.26$1.00$1.00$1.10
78Pavement surface preparation for marking (arrow) (678-7009)EACH3$12.50$13.00$20.00$10.51$20.00$20.00$13.40
79Pavement surface preparation for marking (word) (678-7016)EACH1$15.00$13.00$20.00$10.51$20.00$20.00$13.40
80Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH2$15.00$2.00$5.00$1.05$5.00$5.00$0.10
81Install FTB (5002-7001)LF73$75.00$80.00$74.68$68.29$180.00$40.00$66.80
82Remove FTB (5002-7002)LF73$25.00$20.00$10.07$17.86$75.00$10.00$39.00
83Remove lead-containing coating (other) (5011-7002)LS1$40,000$25,000$24,480$5,000.00$40,000$12,000$11,140
TxDOT contract A00192185: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy