TxDOT contract A00183903 bid tabulation
Bridge Replacement, FM 1093 (AT SAN BERNARD RIVER to STR #446-06-035). Let by Texas DOT on February 5, 2026, Austin, Yoakum District. 12 bids received; low bid $4,981,962 by R Construction Civil, LLC, -23% against the engineer's estimate of $6,432,146.
- Owner
- Texas DOT
- Letting
- 05 FEB 2026
- Pay items
- 86
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | R Construction Civil, LLC | $4,981,962 | Low | -23% |
| 2 | E-Z Bel Construction, LLC | $5,161,698 | +4.0% | -20% |
| 3 | Forde Construction Company, Inc. | $5,584,884 | +12% | -13% |
| 4 | Tucan Contracting, LLC | $5,729,154 | +15% | -11% |
| 5 | Skyline Bridge LLC | $5,777,135 | +16% | -10% |
| 6 | MC2 Civil, LLC | $5,992,916 | +20% | -7.0% |
| 7 | Hunter Industries, LTD. | $6,138,592 | +23% | -5.0% |
| 8 | John Reed and Company, LLC | $6,231,866 | +25% | -3.0% |
| 9 | Altus Construction LLC | $6,278,648 | +26% | -2.0% |
| 10 | Texas Materials Group, Inc. | $6,507,892 | +31% | +1.0% |
| 11 | Hodges and Son Construction Company, Inc. | $7,008,535 | +41% | +9.0% |
| 12 | Isi Contracting, Inc. | $7,660,741 | +54% | +19% |
Engineer's estimate: $6,432,146.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. R Construction Civil, LLC | 2. E-Z Bel Construction, LLC | 3. Forde Construction Company, Inc. | 4. Tucan Contracting, LLC | 5. Skyline Bridge LLC | 6. MC2 Civil, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 28 | $3,000.00 | $5,300.00 | $8,400.00 | $4,200.00 | $1,650.00 | $5,000.00 | $15,000 |
| 2 | Excavation (roadway) (110-7001) | CY | 2,637 | $17.00 | $18.00 | $18.00 | $25.00 | $16.50 | $16.00 | $40.00 |
| 3 | Excavation (channel) (110-7002) | CY | 1,044 | $35.00 | $26.00 | $16.00 | $34.00 | $16.50 | $18.00 | $15.00 |
| 4 | Embankment (final)(OC)(type C) (132-7005) | CY | 8,656 | $15.00 | $26.00 | $14.75 | $15.00 | $16.50 | $34.00 | $20.00 |
| 5 | Blading (150-7002) | HR | 46 | $115.00 | $110.00 | $120.00 | $89.00 | $121.00 | $100.00 | $90.00 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 317 | $5.00 | $8.00 | $5.00 | $15.00 | $4.40 | $5.00 | $10.00 |
| 7 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 15,752 | $1.00 | $0.40 | $0.25 | $0.40 | $0.26 | $0.35 | $0.30 |
| 8 | Broadcast seed (temporary_warm) (164-7005) | SY | 3,939 | $1.00 | $0.50 | $0.50 | $0.40 | $0.53 | $0.65 | $0.30 |
| 9 | Broadcast seed (temporary_cool) (164-7006) | SY | 3,939 | $1.00 | $0.50 | $0.50 | $0.40 | $0.53 | $0.65 | $0.30 |
| 10 | Vegetative watering (168-7001) | TGL | 133 | $75.00 | $250.00 | $59.00 | $130.00 | $55.00 | $1.00 | $30.00 |
| 11 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 1,800.10 | $85.00 | $150.00 | $128.00 | $96.00 | $88.00 | $145.00 | $120.00 |
| 12 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 66.80 | $260.00 | $370.00 | $425.00 | $366.00 | $385.00 | $400.00 | $350.00 |
| 13 | Lime TRT (existing material)(8") (260-7007) | SY | 4,176 | $6.00 | $5.50 | $4.25 | $10.50 | $7.70 | $22.00 | $11.00 |
| 14 | Cement (275-7001) | TON | 40.60 | $245.00 | $220.00 | $275.00 | $263.00 | $220.00 | $370.00 | $220.00 |
| 15 | Cement TRT (existing material)(8") (275-7003) | SY | 4,176 | $5.00 | $5.50 | $2.00 | $9.00 | $2.20 | $11.00 | $9.00 |
| 16 | Prime coat (MC-30) (310-7004) | GAL | 1,581 | $7.50 | $8.00 | $9.00 | $5.00 | $8.80 | $20.00 | $3.00 |
| 17 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 93.10 | $300.00 | $280.00 | $275.00 | $215.00 | $459.80 | $800.00 | $250.00 |
| 18 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 4,073 | $9.00 | $5.00 | $4.50 | $4.00 | $4.57 | $20.00 | $5.00 |
| 19 | D-GR HMA type-B PG70-22 (341-7006) | TON | 1,285 | $85.00 | $130.00 | $127.00 | $133.00 | $193.60 | $225.00 | $110.00 |
| 20 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 1,894.20 | $88.00 | $140.00 | $136.00 | $144.00 | $190.30 | $225.00 | $120.00 |
| 21 | D-GR HMA type D PG70-22 (level-UP) (341-7051) | TON | 302.50 | $95.00 | $150.00 | $145.00 | $207.00 | $269.50 | $200.00 | $140.00 |
| 22 | Tack coat (341-7082) | GAL | 1,942 | $5.00 | $4.50 | $4.50 | $5.00 | $8.80 | $5.00 | $4.00 |
| 23 | Cem stabil BKFL (400-7010) | CY | 120 | $220.00 | $90.00 | $195.00 | $141.00 | $165.00 | $300.00 | $100.00 |
| 24 | Flowable backfill (401-7001) | CY | 10 | $400.00 | $530.00 | $225.00 | $550.00 | $275.00 | $300.00 | $180.00 |
| 25 | Temporary special shoring (403-7001) | SF | 540 | $40.00 | $130.00 | $40.00 | $79.00 | $22.00 | $24.00 | $25.00 |
| 26 | Drilled shaft (36 in) (416-7006) | LF | 2,789 | $410.00 | $370.00 | $272.00 | $412.00 | $217.80 | $213.30 | $250.00 |
| 27 | Class A concrete (plug) (420-7009) | EACH | 2 | $1,500.00 | $6,000.00 | $2,150.00 | $1,900.00 | $2,750.00 | $2,000.00 | $400.00 |
| 28 | Class C concrete (abutment) (420-7012) | CY | 57.60 | $1,750.00 | $635.00 | $1,450.00 | $2,800.00 | $1,100.00 | $1,200.00 | $2,000.00 |
| 29 | Class C concrete (cap) (420-7022) | CY | 168 | $1,700.00 | $825.00 | $1,295.00 | $1,400.00 | $1,100.00 | $1,600.00 | $2,200.00 |
| 30 | Class C concrete (column) (420-7038) | CY | 58.70 | $1,800.00 | $840.00 | $1,325.00 | $2,000.00 | $1,320.00 | $1,800.00 | $2,300.00 |
| 31 | Reinforced concrete slab (422-7001) | SF | 26,220 | $37.00 | $20.00 | $24.00 | $27.25 | $27.50 | $26.00 | $29.00 |
| 32 | Prestressed concrete girder (TX28) (425-7001) | LF | 3,393 | $290.00 | $175.00 | $248.50 | $225.00 | $160.58 | $205.00 | $200.00 |
| 33 | Riprap (stone protection)(12 in) (432-7041) | CY | 11 | $250.00 | $635.00 | $225.00 | $360.00 | $220.00 | $250.00 | $300.00 |
| 34 | Riprap (stone protection)(18 in) (432-7043) | CY | 1,200 | $240.00 | $225.00 | $195.00 | $215.00 | $187.00 | $170.00 | $200.00 |
| 35 | Rail (type SSTR) (450-7024) | LF | 1,188 | $108.00 | $220.00 | $72.00 | $101.00 | $154.00 | $90.00 | $200.00 |
| 36 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 184 | $275.00 | $170.00 | $265.00 | $215.00 | $187.00 | $200.00 | $200.00 |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 117 | $110.00 | $100.00 | $95.00 | $96.00 | $66.00 | $75.00 | $120.00 |
| 38 | RC pipe (CL III)(24 in) (464-7005) | LF | 89 | $137.50 | $130.00 | $145.00 | $115.00 | $77.00 | $85.00 | $190.00 |
| 39 | Inlet (complete)(type AD) (465-7382) | EACH | 2 | $7,000.00 | $3,700.00 | $7,950.00 | $6,400.00 | $5,445.00 | $5,000.00 | $3,500.00 |
| 40 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 1 | $2,300.00 | $2,100.00 | $3,250.00 | $3,000.00 | $1,650.00 | $1,800.00 | $4,500.00 |
| 41 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 1 | $2,195.00 | $2,100.00 | $3,250.00 | $3,300.00 | $2,200.00 | $2,000.00 | $4,500.00 |
| 42 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,200.00 | $2,100.00 | $3,250.00 | $3,300.00 | $2,200.00 | $2,000.00 | $4,500.00 |
| 43 | Adjusting inlets (479-7002) | EACH | 2 | $2,000.00 | $500.00 | $2,125.00 | $780.00 | $3,850.00 | $1,800.00 | $900.00 |
| 44 | Removing structure (bridge 500 - 999 FT length) (496-7011) | EACH | 1 | $280,000 | $85,000 | $76,500 | $120,000 | $77,000 | $100,000 | $100,000 |
| 45 | Mobilization (500-7001) | LS | 1 | $635,000 | $50,000 | $475,000 | $196,000 | $1,300,000 | $525,000 | $600,000 |
| 46 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $4,000.00 | $2,700.00 | $1,250.00 | $1,400.00 | $1,100.00 | $3,000.00 | $5,000.00 |
| 47 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $35,000 | $5,250.00 | $8,000.00 | $5,500.00 | $2,500.00 | $20,000 |
| 48 | TMA (stationary) (505-7001) | DAY | 20 | $320.00 | $330.00 | $260.00 | $185.00 | $330.00 | $250.00 | $300.00 |
| 49 | TMA (mobile operation) (505-7003) | DAY | 20 | $500.00 | $340.00 | $515.00 | $170.00 | $330.00 | $50.00 | $700.00 |
| 50 | Temporary sediment control fence (install) (506-7039) | LF | 1,880 | $5.50 | $5.00 | $3.50 | $4.00 | $3.85 | $4.00 | $3.00 |
| 51 | Temporary sediment control fence (remove) (506-7041) | LF | 1,880 | $1.70 | $1.00 | $1.50 | $1.00 | $1.65 | $2.00 | $2.50 |
| 52 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 1,260 | $50.00 | $20.00 | $22.25 | $77.00 | $99.00 | $70.00 | $30.00 |
| 53 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 1,260 | $14.00 | $18.00 | $22.25 | $21.00 | $16.50 | $20.00 | $10.00 |
| 54 | Driveways (surface treat) (530-7016) | SY | 274 | $37.00 | $62.00 | $60.00 | $70.00 | $44.00 | $70.00 | $80.00 |
| 55 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 4,452 | $1.00 | $1.00 | $0.50 | $0.75 | $0.55 | $1.00 | $0.70 |
| 56 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 2,226 | $1.00 | $1.00 | $0.50 | $1.17 | $0.83 | $1.00 | $0.70 |
| 57 | Metal W-beam guard fence (timber post) (540-7001) | LF | 550 | $30.00 | $25.00 | $25.00 | $31.00 | $27.50 | $24.00 | $30.00 |
| 58 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,300.00 | $1,800.00 | $1,450.00 | $2,250.00 | $1,595.00 | $1,650.00 | $2,200.00 |
| 59 | Metal beam guard fence trans (31"-28")(25') (540-7031) | EACH | 1 | $900.00 | $875.00 | $800.00 | $1,280.00 | $880.00 | $2,000.00 | $1,300.00 |
| 60 | Remove metal beam guard fence (542-7001) | LF | 850 | $3.00 | $3.00 | $5.00 | $3.40 | $5.50 | $2.00 | $3.50 |
| 61 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $300.00 | $275.00 | $250.00 | $295.00 | $275.00 | $500.00 | $280.00 |
| 62 | Guardrail end treatment (install) (544-7001) | EACH | 5 | $3,400.00 | $3,400.00 | $2,950.00 | $3,684.00 | $324.00 | $3,300.00 | $3,500.00 |
| 63 | Guardrail end treatment (move & reset) (544-7002) | EACH | 2 | $1,200.00 | $1,500.00 | $1,150.00 | $1,295.00 | $1,265.00 | $950.00 | $1,300.00 |
| 64 | Guardrail end treatment (remove) (544-7003) | EACH | 5 | $250.00 | $375.00 | $30.00 | $375.00 | $330.00 | $250.00 | $360.00 |
| 65 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $1,800.00 | $955.00 | $650.00 | $920.00 | $1,650.00 | $500.00 | $900.00 |
| 66 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $11,000 | $8,300.00 | $5,500.00 | $9,100.00 | $8,800.00 | $7,500.00 | $8,800.00 |
| 67 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 2 | $245.00 | $270.00 | $250.00 | $204.00 | $275.00 | $350.00 | $300.00 |
| 68 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 1 | $263.00 | $300.00 | $300.00 | $260.00 | $330.00 | $400.00 | $600.00 |
| 69 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $750.00 | $525.00 | $1,000.00 | $940.00 | $1,100.00 | $1,200.00 | $650.00 |
| 70 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $920.00 | $825.00 | $1,100.00 | $1,125.00 | $1,210.00 | $1,300.00 | $800.00 |
| 71 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,000.00 | $900.00 | $1,200.00 | $1,300.00 | $1,320.00 | $1,400.00 | $850.00 |
| 72 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 3 | $600.00 | $400.00 | $425.00 | $687.00 | $467.50 | $525.00 | $400.00 |
| 73 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 1 | $720.00 | $775.00 | $475.00 | $994.00 | $522.50 | $500.00 | $750.00 |
| 74 | Remove SM RD SN sup&AM (644-7073) | EACH | 7 | $130.00 | $90.00 | $100.00 | $90.00 | $110.00 | $100.00 | $110.00 |
| 75 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 96 | $35.00 | $15.00 | $8.00 | $16.00 | $23.10 | $35.00 | $19.00 |
| 76 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 32 | $40.00 | $30.00 | $45.00 | $28.00 | $34.10 | $40.00 | $30.00 |
| 77 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 7,788 | $2.00 | $1.00 | $1.00 | $0.85 | $1.10 | $1.25 | $0.80 |
| 78 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 11,424 | $2.00 | $1.00 | $1.00 | $0.85 | $1.10 | $1.25 | $0.80 |
| 79 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 838 | $2.00 | $1.00 | $1.00 | $1.10 | $1.10 | $2.00 | $1.00 |
| 80 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 5,832 | $1.00 | $1.50 | $1.00 | $1.40 | $1.10 | $1.25 | $1.35 |
| 81 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 642 | $1.00 | $2.50 | $1.00 | $2.60 | $1.10 | $1.25 | $2.50 |
| 82 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 4,110 | $1.00 | $1.50 | $1.00 | $1.50 | $1.10 | $1.25 | $1.40 |
| 83 | Pavement sler 6" (666-7347) | LF | 1,870 | $0.50 | $1.00 | $0.65 | $1.00 | $0.72 | $0.75 | $1.00 |
| 84 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 70 | $8.00 | $7.00 | $6.50 | $7.40 | $7.15 | $12.00 | $7.00 |
| 85 | Eliminating existing PM & markers (4") (677-7001) | LF | 11,660 | $1.50 | $1.00 | $0.65 | $0.80 | $0.72 | $0.75 | $0.75 |
| 86 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $10,000 | $15,000 | $2,350.00 | $9,000.00 | $5,500.00 | $13,000 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.