TxDOT contract A00212486 bid tabulation

Construct Bridge, SL 323 (0.12 mi S of US 271 to UPRR). Let by Texas DOT on April 8, 2026, Smith, Tyler District. 9 bids received; low bid $1,516,226 by Drake Companies LLC, -7.0% against the engineer's estimate of $1,629,506.

Owner
Texas DOT
Letting
08 APR 2026
Pay items
66
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Drake Companies LLC$1,516,226Low-7.0%
2Skyline Bridge LLC$1,528,970+1.0%-6.0%
3Garret Shields Infrastructure$1,532,375+1.0%-6.0%
4R Construction Civil, LLC$1,572,840+4.0%-3.0%
5THK Construction LLC$1,623,971+7.0%0.0%
6Longview Bridge and Road, LTD.$1,657,275+9.0%+2.0%
7Hodges and Son Construction Company, Inc.$1,730,479+14%+6.0%
8Baker & Company Construction, LLC$1,841,736+21%+13%
9Red Baron Building Company, LLC$2,341,953+54%+44%
TxDOT contract A00212486: bids by rank

Engineer's estimate: $1,629,506.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Drake Companies LLC2. Skyline Bridge LLC3. Garret Shields Infrastructure4. R Construction Civil, LLC5. THK Construction LLC6. Longview Bridge and Road, LTD.
1Preparing row (100-7002)STA7.25$3,000.00$1,511.00$850.00$1,000.00$2,400.00$1,200.00$2,150.00
2Removing concrete (driveways) (104-7011)SY364$25.00$8.50$12.50$20.00$8.00$10.00$9.00
3Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046)SY535$8.00$11.90$10.10$20.00$9.00$20.00$9.00
4Remove (6"-12") TRT/untrt base & asphalt pavement (105-7057)SY531$10.00$12.00$10.18$20.00$9.00$20.00$9.00
5Excavation (roadway) (110-7001)CY453$10.00$12.85$9.75$30.00$27.00$15.00$10.25
6Embankment (final)(OC)(type C) (132-7005)CY327$17.00$15.50$31.00$30.00$27.00$15.00$20.00
7Furn & place topsoil (4") (160-7002)SY3,573$2.00$2.65$4.00$4.00$4.50$3.50$2.00
8Broadcast seed (permanent_rural_sand) (164-7001)SY3,573$0.30$0.44$0.48$0.20$0.40$0.42$0.40
9Broadcast seed (temporary_warm) (164-7005)SY893$2.50$0.44$0.48$0.20$0.40$0.42$0.40
10Broadcast seed (temporary_cool) (164-7006)SY893$2.50$0.44$0.48$0.20$0.40$0.42$0.40
11Vegetative watering (168-7001)TGL40$8.00$13.30$1.00$10.00$250.00$1.00$40.00
12Cement (275-7001)TON73$250.00$280.00$280.00$300.00$295.00$350.00$290.00
13Cement TRT (existing material)(12") (275-7005)SY2,715$10.00$3.50$6.50$5.00$9.00$8.00$2.60
14Prime coat & blotter (MC-30) (310-7010)GAL815$6.00$8.00$6.90$5.00$9.00$8.40$5.80
15Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068)GAL1,200$4.00$8.00$6.25$6.00$13.00$8.40$6.20
16Aggregate (type-PD or PL, GR-3) (316-7257)CY29$150.00$217.00$546.00$375.00$605.00$227.85$325.00
17SP mixes SP-B PG64-22 (344-7001)TON636$165.00$162.96$197.75$180.00$178.00$181.02$170.00
18SP mixes SP-C sac-A PG70-22 (344-7020)TON313$188.00$189.63$213.00$180.00$220.00$219.24$180.00
19Tack coat (344-7077)GAL286$3.00$8.00$5.00$12.00$1.10$8.40$4.50
20Cem stabil BKFL (400-7010)CY205$225.00$228.00$240.00$180.00$90.00$225.00$225.00
21Drilled shaft (18 in) (416-7002)LF212$130.00$74.00$95.00$300.00$125.00$144.63$130.00
22Drilled shaft (36 in) (416-7006)LF530$290.00$273.00$225.00$300.00$295.00$281.72$320.00
23Class C concrete (abutment) (420-7012)CY66$1,200.00$910.00$950.00$1,000.00$650.00$1,050.00$1,000.00
24Reinforced concrete slab (422-7001)SF4,600$24.00$25.86$22.50$25.00$26.00$22.00$30.00
25Approach slab (422-7013)CY70.60$800.00$755.00$620.00$800.00$895.00$800.00$950.00
26Prestressed concrete girder (TX46) (425-7004)LF597$250.00$236.44$270.40$250.00$242.00$274.87$335.00
27Riprap (mow strip)(4 in) (432-7013)CY14$700.00$585.00$775.00$600.00$825.00$700.00$692.00
28Riprap (stone protection)(18 in) (432-7043)CY300$220.00$192.00$172.00$125.00$210.00$160.00$195.00
29Riprap (stone protection)(24 in) (432-7045)CY1,457$190.00$191.00$165.00$120.00$210.00$160.00$175.00
30Rail (type SSTR) (450-7024)LF264$70.00$105.00$121.00$80.00$150.00$180.00$155.00
31Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF90$225.00$228.00$220.00$200.00$200.00$175.00$290.00
32Removing structure (box culvert) (496-7008)LF95$90.00$120.00$75.00$30.00$75.00$105.00$125.00
33Remove STR (drainage flume) (496-7035)EACH1$2,000.00$535.00$900.00$2,000.00$2,400.00$2,000.00$2,000.00
34Removing structure (pipe) (496-7037)EACH1$800.00$650.00$1,500.00$1,000.00$1,200.00$500.00$2,500.00
35Mobilization (500-7001)LS1$120,705$100,000$125,000$130,000$22,000$160,000$90,000
36Barricades, signs and traffic handling (502-7001)MO6$5,000.00$1,550.00$1,600.00$4,000.00$6,600.00$912.15$1,120.00
37Portable changeable message sign (503-7001)DAY14$100.00$100.00$60.00$100.00$82.00$100.00$265.00
38TMA (stationary) (505-7001)DAY14$200.00$180.00$300.00$300.00$180.00$200.00$265.00
39Rock filter dams (install) (type 2) (506-7002)LF238$44.00$49.50$40.00$20.00$42.00$47.25$46.25
40Rock filter dams (remove) (506-7011)LF238$11.00$14.50$10.00$5.00$13.00$13.65$14.30
41Backhoe work (erosion & sediment control) (506-7030)HR198$80.00$45.00$50.00$80.00$28.00$15.00$50.00
42Temporary sediment control fence (install) (506-7039)LF982$4.00$4.65$3.95$5.00$4.50$4.41$4.95
43Temporary sediment control fence (remove) (506-7041)LF982$1.20$1.35$1.45$1.00$1.10$1.26$1.15
44Driveways (concrete) (530-7006)SY319$100.00$78.00$82.25$120.00$80.00$95.00$118.00
45Mill rumble strips (asphalt) (shoulder) (533-7001)LF1,544$0.25$2.20$2.25$1.25$3.25$3.07$3.85
46Mill rumble strips (asphalt) (centerline) (533-7002)LF772$0.25$4.00$4.00$2.50$5.25$5.61$3.85
47Metal W-beam guard fence (steel post) (540-7002)LF100$30.00$33.00$32.00$40.00$53.00$31.50$32.50
48Metal beam guard fence trans (thrie-beam) (540-7005)EACH2$2,400.00$2,475.00$2,400.00$2,500.00$3,800.00$2,362.50$2,570.00
49Guardrail end treatment (install) (544-7001)EACH2$3,200.00$3,605.00$3,475.00$3,500.00$5,000.00$3,438.75$3,250.00
50Crash cushion attenuator (install)(R)(N)(TL3) (545-7010)EACH2$27,000$28,050$27,000$24,000$17,000$26,775$24,200
51Chain link fence (install) (8') (550-7005)LF152$72.00$22.00$35.00$30.00$44.00$50.00$55.00
52Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH3$700.00$720.00$1,500.00$800.00$1,900.00$1,358.70$1,425.00
53Remove SM RD SN sup&AM (644-7073)EACH2$103.00$110.00$150.00$100.00$150.00$199.50$210.00
54Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH6$35.00$22.00$26.50$5.00$33.00$18.90$22.00
55Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016)EACH5$32.00$39.00$26.50$6.00$33.00$26.25$22.00
56Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF24$6.00$11.00$10.75$175.00$10.00$10.50$11.00
57Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH1$750.00$1,320.00$1,275.00$625.00$1,200.00$1,260.00$1,320.00
58Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF280$0.20$2.20$2.15$1.25$2.00$2.10$2.20
59Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF280$0.20$2.20$2.15$1.25$2.00$2.10$2.20
60Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF1,264$0.60$2.20$2.15$1.25$2.00$2.10$2.20
61Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF1,263$0.60$2.20$2.15$1.25$2.00$2.10$2.20
62Reflectorized pavement marker type II-A-A (672-7004)EACH41$4.00$8.80$8.50$8.75$8.00$8.40$8.80
63Eliminating existing PM & markers (6") (677-7002)LF184$0.50$2.20$2.15$2.50$2.00$2.10$2.20
64Pavement surface preparation for marking (6") (678-7002)LF560$0.80$1.10$1.15$2.50$1.00$1.05$1.10
65Full - width mowing (730-7019)CYC1$5,500.00$550.00$1,000.00$1,000.00$600.00$500.00$1,980.00
66Litter removal (734-7002)CYC1$4,500.00$500.00$1,500.00$1,000.00$1,100.00$500.00$945.00
TxDOT contract A00212486: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy