TxDOT contract A00134793 bid tabulation
Bridge Replacement, COUNTY ROAD 130 (CR 130 AT RICKAWAY BRANCH to STR# AA05-61-001). Let by Texas DOT on July 2, 2025, Lavaca, Yoakum District. 7 bids received; low bid $1,541,729 by 3LW Civil LLC, -3.7% against the engineer's estimate of $1,600,279.
- Owner
- Texas DOT
- Letting
- 02 JUL 2025
- Pay items
- 43
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | 3LW Civil LLC | $1,541,729 | Low | -4.0% |
| 2 | Constar Construction | $1,578,110 | +2.0% | -1.0% |
| 3 | Acme Bridge Company, Inc. | $1,598,172 | +4.0% | 0.0% |
| 4 | Presidio Contracting, LLC | $1,696,763 | +10% | +6.0% |
| 5 | Texas Steel Industrial Placing, LLC | $1,746,968 | +13% | +9.0% |
| 6 | E-Z Bel Construction, LLC | $1,793,646 | +16% | +12% |
| 7 | C. E. Barker, LTD. | $2,139,137 | +39% | +34% |
Engineer's estimate: $1,600,279.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. 3LW Civil LLC | 2. Constar Construction | 3. Acme Bridge Company, Inc. | 4. Presidio Contracting, LLC | 5. Texas Steel Industrial Placing, LLC | 6. E-Z Bel Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 6.70 | $5,000.00 | $2,743.72 | $2,000.00 | $2,940.00 | $6,975.00 | $5,000.00 | $6,000.00 |
| 2 | Obliterating abandoned road (106-7001) | STA | 0.70 | $2,415.13 | $1,820.00 | $1,007.54 | $3,120.00 | $3,150.00 | $1,200.00 | |
| 3 | Excavation (roadway) (110-7001) | CY | 490 | $22.00 | $19.49 | $22.00 | $25.70 | $33.25 | $20.00 | $50.00 |
| 4 | Excavation (channel) (110-7002) | CY | 1,115 | $20.00 | $18.84 | $18.00 | $23.30 | $32.15 | $25.00 | $20.00 |
| 5 | Embankment (final)(OC)(type C) (132-7005) | CY | 146 | $30.00 | $102.13 | $27.00 | $52.30 | $8.50 | $30.00 | $60.00 |
| 6 | Blading (150-7002) | HR | 40 | $120.00 | $164.92 | $50.00 | $67.40 | $50.00 | $75.00 | $70.00 |
| 7 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 3,138 | $1.00 | $0.91 | $0.35 | $0.80 | $0.80 | $0.78 | $1.00 |
| 8 | Broadcast seed (temporary_warm) (164-7005) | SY | 786 | $1.00 | $1.59 | $0.35 | $2.10 | $1.65 | $1.50 | $2.00 |
| 9 | Broadcast seed (temporary_cool) (164-7006) | SY | 786 | $1.00 | $1.58 | $0.35 | $2.10 | $1.65 | $1.50 | $2.00 |
| 10 | Vegetative watering (168-7001) | TGL | 26.45 | $100.00 | $159.30 | $120.00 | $88.60 | $75.00 | $25.00 | $84.00 |
| 11 | Soil ret BLKT(SL_steep_sand_wldlfe) (169-7028) | SY | 82 | $10.00 | $11.89 | $6.00 | $5.30 | $23.50 | $12.00 | $5.00 |
| 12 | FL BS (compacted in place)(type E GR 5)(final pos) (247-7196) | CY | 486 | $125.00 | $29.84 | $140.00 | $131.00 | $126.70 | $160.00 | $200.00 |
| 13 | Asphalt (RC-250) (316-7016) | GAL | 408 | $15.00 | $56.36 | $25.00 | $13.00 | $19.70 | $10.00 | $19.00 |
| 14 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 14 | $600.00 | $1,180.00 | $1,840.00 | $1,300.00 | $1,425.00 | $700.00 | $1,370.00 |
| 15 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 16 | $600.00 | $1,309.80 | $1,640.00 | $1,160.00 | $1,270.00 | $700.00 | $1,220.00 |
| 16 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 693 | $15.00 | $36.16 | $21.00 | $9.80 | $16.90 | $10.00 | $16.00 |
| 17 | Cem stabil BKFL (400-7010) | CY | 68.10 | $180.00 | $292.84 | $115.00 | $198.00 | $288.25 | $200.00 | $380.00 |
| 18 | Drilled shaft (24 in) (416-7004) | LF | 765 | $260.00 | $332.15 | $288.00 | $253.00 | $255.20 | $330.00 | $240.00 |
| 19 | Class C concrete (abutment) (420-7012) | CY | 47.20 | $1,300.00 | $914.35 | $1,000.00 | $1,300.00 | $1,245.00 | $1,400.00 | $2,100.00 |
| 20 | Class C concrete (cap) (420-7022) | CY | 23.10 | $1,500.00 | $1,776.32 | $1,600.00 | $1,840.00 | $2,310.00 | $2,000.00 | $2,200.00 |
| 21 | Class C concrete (column) (420-7038) | CY | 16.20 | $2,000.00 | $1,082.16 | $1,800.00 | $1,320.00 | $1.00 | $2,000.00 | $1,200.00 |
| 22 | Reinforced concrete slab (slab beam) (422-7007) | SF | 5,330 | $25.00 | $20.40 | $22.00 | $23.70 | $27.25 | $23.00 | $24.00 |
| 23 | Prestressed concrete slab beam (5SB15) (425-7019) | LF | 1,011.74 | $245.00 | $232.66 | $290.00 | $290.00 | $250.00 | $280.00 | $310.00 |
| 24 | Riprap (stone protection)(18 in) (432-7043) | CY | 1,142 | $200.00 | $199.21 | $175.00 | $171.00 | $170.70 | $215.00 | $220.00 |
| 25 | Rail (type T223) (450-7008) | LF | 466 | $140.00 | $156.57 | $140.00 | $116.00 | $160.00 | $150.00 | $220.00 |
| 26 | Armor joint (sealed) (454-7003) | LF | 102 | $130.00 | $134.03 | $85.00 | $155.00 | $150.00 | $150.00 | $144.00 |
| 27 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 2 | $30,000 | $5,100.88 | $19,000 | $27,300 | $35,650 | $30,000 | $25,630 |
| 28 | Mobilization (500-7001) | LS | 1 | $145,250 | $141,129 | $110,000 | $118,000 | $169,600 | $175,000 | $100,000 |
| 29 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $2,500.00 | $638.68 | $1,100.00 | $2,530.00 | $3,500.00 | $1,250.00 | $2,500.00 |
| 30 | Rock filter dams (install) (type 1) (506-7001) | LF | 200 | $50.00 | $45.37 | $47.00 | $61.00 | $43.45 | $50.00 | $58.00 |
| 31 | Rock filter dams (remove) (506-7011) | LF | 200 | $10.00 | $11.62 | $10.00 | $17.50 | $10.00 | $20.00 | $17.00 |
| 32 | Sandbags for erosion control (506-7035) | EACH | 200 | $5.00 | $9.07 | $6.00 | $9.00 | $10.00 | $12.00 | $9.00 |
| 33 | Temporary sediment control fence (install) (506-7039) | LF | 1,490 | $5.00 | $3.84 | $5.00 | $4.50 | $5.90 | $4.00 | $4.00 |
| 34 | Temporary sediment control fence (remove) (506-7041) | LF | 1,490 | $2.00 | $1.07 | $1.00 | $0.80 | $1.00 | $1.00 | $1.00 |
| 35 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 5 | $2,400.00 | $1,838.51 | $2,900.00 | $3,080.00 | $2,950.00 | $2,000.00 | $2,125.00 |
| 36 | Guardrail end treatment (install) (544-7001) | EACH | 5 | $2,000.00 | $2,404.63 | $4,800.00 | $3,790.00 | $3,760.00 | $3,000.00 | $3,400.00 |
| 37 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 3 | $30,000 | $35,178 | $39,000 | $37,200 | $31,200 | $29,500 | $31,000 |
| 38 | Wire fence (type A) (552-7001) | LF | 388 | $25.00 | $36.10 | $10.00 | $28.10 | $26.00 | $20.00 | $27.00 |
| 39 | Wire fence (water gap) (552-7010) | LF | 60 | $8.10 | $45.00 | $31.30 | $70.00 | $50.00 | $30.00 | |
| 40 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 4 | $600.00 | $734.29 | $400.00 | $498.00 | $780.00 | $750.00 | $470.00 |
| 41 | Remove SM RD SN sup&AM (644-7073) | EACH | 8 | $200.00 | $80.32 | $100.00 | $106.00 | $75.00 | $100.00 | $100.00 |
| 42 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 14 | $40.00 | $21.17 | $30.00 | $25.50 | $25.00 | $30.00 | $24.00 |
| 43 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 10 | $40.00 | $36.95 | $300.00 | $31.80 | $50.00 | $30.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.