TxDOT contract A00209445 bid tabulation
Surfacing/Roadway Restoration, FM 1097 (SH 75 to Walker County Line). Let by Texas DOT on January 6, 2026, Montgomery, Houston District. 7 bids received; low bid $4,872,185 by Durwood Greene Construction Co., -0.3% against the engineer's estimate of $4,888,552.
- Owner
- Texas DOT
- Letting
- 06 JAN 2026
- Pay items
- 54
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Durwood Greene Construction Co. | $4,872,185 | Low | 0.0% |
| 2 | Elite Kings Construction, LLC | $5,370,374 | +10% | +10% |
| 3 | Cornerstone Paving and Construction, L.L.C. | $5,483,663 | +13% | +12% |
| 4 | Knife River Corporation - South | $5,842,524 | +20% | +20% |
| 5 | Larry Young Paving, Inc. | $5,972,417 | +23% | +22% |
| 6 | Texas Materials Group, Inc. | $6,912,395 | +42% | +41% |
| 7 | Environmental Allies, Inc. | $7,466,039 | +53% | +53% |
Engineer's estimate: $4,888,552.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Durwood Greene Construction Co. | 2. Elite Kings Construction, LLC | 3. Cornerstone Paving and Construction, L.L.C. | 4. Knife River Corporation - South | 5. Larry Young Paving, Inc. | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 550 | $30.00 | $25.00 | $1.00 | $16.30 | $24.00 | $18.00 | $30.00 |
| 2 | Backfill (type B) (134-7002) | STA | 463 | $150.00 | $140.00 | $100.00 | $325.00 | $240.00 | $190.00 | $300.00 |
| 3 | SP mixes SP-D sac-A PG70-22 (344-7052) | TON | 20,871 | $125.00 | $145.00 | $140.00 | $141.00 | $145.00 | $160.00 | $168.00 |
| 4 | Tack coat (344-7077) | GAL | 34,151 | $4.15 | $1.00 | $3.50 | $3.75 | $4.25 | $4.75 | $5.50 |
| 5 | Flexible pavement structure repair(10") (351-7009) | SY | 13,981 | $60.00 | $35.00 | $72.00 | $81.00 | $78.00 | $60.00 | $103.00 |
| 6 | Planing asphalt concrete pavement(2") (354-7051) | SY | 189,911 | $2.00 | $2.50 | $2.00 | $1.60 | $1.25 | $1.50 | $4.00 |
| 7 | Riprap (mow strip)(4 in) (432-7013) | CY | 49 | $800.00 | $850.00 | $2.00 | $805.00 | $820.00 | $720.00 | $717.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $230,915 | $210,000 | $250,000 | $300,000 | $349,969 | $600,000 | $202,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $12,500 | $7,000.00 | $1,500.00 | $4,000.00 | $45,000 | $11,000 | $7,000.00 |
| 10 | Portable changeable message sign (503-7002) | EACH | 2 | $6,500.00 | $8,000.00 | $260.00 | $7,200.00 | $1,100.00 | $1,100.00 | $8,610.00 |
| 11 | TMA (stationary) (505-7001) | DAY | 62 | $225.00 | $350.00 | $250.00 | $75.00 | $580.00 | $260.00 | $287.00 |
| 12 | TMA (mobile operation) (505-7003) | DAY | 53 | $130.00 | $300.00 | $250.00 | $75.00 | $940.00 | $660.00 | $287.00 |
| 13 | Intersections (ACP) (530-7002) | SY | 182 | $65.00 | $35.00 | $120.00 | $36.00 | $25.00 | $15.00 | $70.00 |
| 14 | Turnouts (ACP) (530-7018) | SY | 683 | $23.00 | $85.00 | $120.00 | $130.00 | $275.00 | $15.00 | $208.00 |
| 15 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 90,644 | $0.22 | $0.19 | $1.00 | $0.07 | $0.07 | $0.25 | $0.10 |
| 16 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 45,322 | $0.20 | $0.21 | $1.00 | $0.08 | $0.08 | $0.25 | $0.10 |
| 17 | Metal W-beam guard fence (timber post) (540-7001) | LF | 275 | $30.00 | $27.00 | $150.00 | $27.50 | $25.00 | $34.00 | $34.00 |
| 18 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,700.00 | $1,700.00 | $1,068.00 | $1,125.00 | $1,450.00 | $2,100.00 | $1,613.00 |
| 19 | Metal thrie-beam guard fence (timber post) (540-7019) | EACH | 4 | $2,700.00 | $2,050.00 | $1,000.00 | $1,990.00 | $1,800.00 | $2,400.00 | $2,210.00 |
| 20 | Remove metal beam guard fence (542-7001) | LF | 150 | $4.00 | $4.50 | $5.00 | $3.00 | $3.00 | $16.00 | $6.00 |
| 21 | Remove terminal anchor section (542-7002) | EACH | 1 | $300.00 | $250.00 | $1,200.00 | $220.00 | $275.00 | $460.00 | $299.00 |
| 22 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $300.00 | $250.00 | $1,000.00 | $260.00 | $225.00 | $390.00 | $299.00 |
| 23 | Guardrail end treatment (install) (544-7001) | EACH | 7 | $3,300.00 | $3,500.00 | $290.00 | $3,235.00 | $3,100.00 | $3,900.00 | $3,435.00 |
| 24 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $325.00 | $250.00 | $450.00 | $330.00 | $250.00 | $390.00 | $299.00 |
| 25 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 87 | $310.00 | $270.00 | $10.00 | $320.00 | $275.00 | $440.00 | $352.00 |
| 26 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 11 | $355.00 | $310.00 | $10.00 | $360.00 | $300.00 | $480.00 | $352.00 |
| 27 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 12 | $715.00 | $400.00 | $10.00 | $870.00 | $575.00 | $1,000.00 | $687.00 |
| 28 | Replace existing aluminum signs(type A) (636-7004) | SF | 12.50 | $30.00 | $30.00 | $200.00 | $35.10 | $25.00 | $19.00 | $57.00 |
| 29 | Install small roadside sign support and assembly tytwt(1)WP(P) (644-7059) | EACH | 59 | $760.00 | $400.00 | $10.00 | $525.00 | $475.00 | $760.00 | $472.00 |
| 30 | Remove SM RD SN sup&AM (644-7073) | EACH | 59 | $100.00 | $80.00 | $10.00 | $100.00 | $100.00 | $180.00 | $90.00 |
| 31 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 10 | $30.00 | $25.00 | $10.00 | $24.00 | $25.00 | $25.00 | $18.00 |
| 32 | Install delineator assembly (D-DY)SZ 1(BRF)GF2 (658-7052) | EACH | 18 | $30.00 | $30.00 | $10.00 | $30.00 | $28.00 | $28.00 | $42.00 |
| 33 | Install OM SM RD sign (1-OM-con)Y (658-7079) | EACH | 15 | $30.00 | $22.00 | $10.00 | $38.00 | $10.00 | $78.00 | $50.00 |
| 34 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 19 | $30.00 | $23.00 | $10.00 | $36.00 | $10.00 | $78.00 | $50.00 |
| 35 | Install OM SM RD sign (1-OM-con)W (658-7086) | EACH | 27 | $30.00 | $22.00 | $10.00 | $34.00 | $10.00 | $78.00 | $50.00 |
| 36 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 2,654 | $0.50 | $0.70 | $6.00 | $0.68 | $0.70 | $1.25 | $0.80 |
| 37 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 286 | $3.25 | $4.50 | $6.00 | $4.00 | $4.00 | $7.75 | $4.75 |
| 38 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 24 | $100.00 | $75.00 | $50.00 | $65.00 | $65.00 | $160.00 | $78.00 |
| 39 | Work zone pavement marking non-removing (W)(RR crossing) (662-7024) | EACH | 4 | $212.00 | $300.00 | $1.00 | $250.00 | $250.00 | $460.00 | $300.00 |
| 40 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 24 | $115.00 | $95.00 | $1.00 | $75.00 | $75.00 | $180.00 | $90.00 |
| 41 | Work zone pavement marking non-removing (Y)4"(broken) (662-7033) | LF | 5,080 | $0.30 | $0.37 | $1.00 | $0.35 | $0.35 | $0.50 | $0.45 |
| 42 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 72,387 | $0.30 | $0.37 | $1.00 | $0.35 | $0.35 | $0.50 | $0.45 |
| 43 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 8,763 | $2.00 | $3.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.60 |
| 44 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,327 | $1.35 | $1.00 | $1.00 | $0.92 | $0.92 | $2.25 | $1.10 |
| 45 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 90,967 | $1.15 | $0.84 | $1.00 | $0.80 | $0.80 | $1.00 | $0.95 |
| 46 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 72,387 | $1.15 | $0.84 | $1.00 | $0.80 | $0.80 | $1.00 | $0.95 |
| 47 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 5,080 | $1.15 | $0.84 | $3.00 | $0.80 | $0.80 | $1.00 | $0.95 |
| 48 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 143 | $15.00 | $15.00 | $16.00 | $14.00 | $14.00 | $27.00 | $17.00 |
| 49 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 12 | $270.00 | $220.00 | $260.00 | $195.00 | $195.00 | $350.00 | $230.00 |
| 50 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 12 | $300.00 | $275.00 | $200.00 | $260.00 | $260.00 | $420.00 | $310.00 |
| 51 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 2 | $550.00 | $550.00 | $310.00 | $475.00 | $475.00 | $680.00 | $570.00 |
| 52 | Reflectorized pavement marker type I-C (672-7002) | EACH | 72 | $6.00 | $6.00 | $5.00 | $5.50 | $5.50 | $13.00 | $6.50 |
| 53 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,690 | $6.00 | $6.00 | $6.80 | $5.50 | $5.50 | $13.00 | $6.50 |
| 54 | Full - width mowing (730-7019) | CYC | 1 | $4,000.00 | $3,900.00 | $1,000.00 | $6,500.00 | $6,000.00 | $15,000 | $11,950 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 6, 2026. Compiled by Mirage Metrics.