TxDOT contract A00192965 bid tabulation
Intersection Improvements With Right And/Or Left Turn Lanes, SH 21 (0.14 Mi E of IH 45 to 1.17 Mi E of IH 45). Let by Texas DOT on November 6, 2025, Madison, Bryan District. 8 bids received; low bid $2,014,433 by Big Creek Construction, LTD., -15% against the engineer's estimate of $2,371,533.
- Owner
- Texas DOT
- Letting
- 06 NOV 2025
- Pay items
- 92
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $2,014,433 | Low | -15% |
| 2 | Larry Young Paving, Inc. | $2,378,582 | +18% | 0.0% |
| 3 | Cornerstone Paving and Construction, L.L.C. | $2,399,584 | +19% | +1.0% |
| 4 | Knife River Corporation - South | $2,434,664 | +21% | +3.0% |
| 5 | Texas Materials Group, Inc. | $2,638,161 | +31% | +11% |
| 6 | Durwood Greene Construction Co. | $2,795,415 | +39% | +18% |
| 7 | A. L. Helmcamp, Inc. | $3,269,230 | +62% | +38% |
| 8 | STX Civil | $3,989,171 | +98% | +68% |
Engineer's estimate: $2,371,533.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Larry Young Paving, Inc. | 3. Cornerstone Paving and Construction, L.L.C. | 4. Knife River Corporation - South | 5. Texas Materials Group, Inc. | 6. Durwood Greene Construction Co. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 457 | $15.00 | $20.00 | $14.00 | $25.00 | $14.50 | $28.00 | $30.00 |
| 2 | Removing concrete (curb) (104-7016) | LF | 50 | $15.00 | $30.00 | $7.50 | $12.00 | $18.00 | $15.00 | $15.00 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 72 | $15.00 | $19.00 | $14.00 | $25.00 | $23.00 | $16.00 | $30.00 |
| 4 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 409 | $10.00 | $7.00 | $15.00 | $15.90 | $10.70 | $15.00 | $12.00 |
| 5 | Remove (14"-18") TRT/untrt base & asphalt pavement (105-7014) | SY | 6,008 | $20.00 | $12.00 | $12.00 | $18.62 | $5.80 | $17.60 | $17.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 2,776 | $12.00 | $15.50 | $18.00 | $35.65 | $29.32 | $40.00 | $25.00 |
| 7 | Excavation (channel) (110-7002) | CY | 20 | $30.00 | $150.00 | $61.00 | $150.00 | $32.85 | $20.00 | $75.00 |
| 8 | Embankment (final)(DC)(type C) (132-7006) | CY | 975 | $15.00 | $15.50 | $19.00 | $13.85 | $6.00 | $42.00 | $25.00 |
| 9 | Backfill (type A or B) (134-7004) | STA | 58 | $250.00 | $195.00 | $260.00 | $380.00 | $249.00 | $440.00 | $325.00 |
| 10 | Furn & place topsoil (4") (160-7002) | SY | 8,286 | $1.50 | $0.75 | $2.25 | $1.50 | $0.41 | $1.80 | $1.20 |
| 11 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 8,286 | $0.50 | $0.32 | $0.38 | $0.30 | $0.33 | $0.33 | $0.38 |
| 12 | Broadcast seed (temporary_warm) (164-7005) | SY | 4,143 | $0.35 | $0.32 | $0.38 | $0.30 | $0.33 | $0.33 | $0.38 |
| 13 | Broadcast seed (temporary_cool) (164-7006) | SY | 4,143 | $0.35 | $0.32 | $0.38 | $0.30 | $0.33 | $0.33 | $0.38 |
| 14 | Vegetative watering (168-7001) | TGL | 83 | $40.00 | $35.00 | $31.00 | $30.00 | $41.00 | $52.00 | $100.00 |
| 15 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 10,755 | $22.50 | $17.50 | $23.00 | $30.30 | $20.84 | $24.00 | $32.00 |
| 16 | Cement (275-7001) | TON | 143 | $250.00 | $235.00 | $230.00 | $240.00 | $242.00 | $243.00 | $260.00 |
| 17 | Cement TRT (subgrade)(10") (275-7028) | SY | 11,521 | $4.00 | $2.00 | $3.50 | $3.25 | $1.18 | $2.55 | $6.00 |
| 18 | Cem TRT(PLNT MX)(CL N)(tyd)(GR1-2)(12") (276-7337) | SY | 1,666 | $35.00 | $58.00 | $45.00 | $55.00 | $60.62 | $74.00 | $65.00 |
| 19 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 2,484 | $6.50 | $4.25 | $6.50 | $4.50 | $4.80 | $6.00 | $6.00 |
| 20 | SP mixes SP-B PG64-22 (344-7001) | TON | 3,176 | $125.00 | $96.00 | $130.00 | $118.50 | $134.60 | $130.00 | $140.00 |
| 21 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 4,369 | $130.00 | $112.00 | $140.00 | $130.00 | $148.80 | $146.00 | $150.00 |
| 22 | Tack coat (344-7077) | GAL | 4,996 | $3.50 | $3.50 | $5.00 | $3.00 | $4.20 | $4.00 | $4.50 |
| 23 | SP mixes SP-C PG70-22 (level-UP) (344-7078) | TON | 210 | $130.00 | $117.00 | $150.00 | $150.00 | $192.00 | $209.00 | $160.00 |
| 24 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 22,915 | $2.50 | $2.00 | $2.25 | $1.75 | $3.62 | $2.40 | $3.50 |
| 25 | Cem stabil BKFL (400-7010) | CY | 7 | $250.00 | $250.00 | $110.00 | $225.00 | $220.00 | $125.00 | $275.00 |
| 26 | Riprap (mow strip)(4 in) (432-7013) | CY | 20 | $775.00 | $675.00 | $770.00 | $805.00 | $1,000.00 | $850.00 | $1,100.00 |
| 27 | Concrete box culvert (4 FT X 3 FT)(extend) (462-7059) | LF | 14 | $1,000.00 | $1,060.00 | $840.00 | $850.00 | $1,170.00 | $1,087.00 | $1,070.00 |
| 28 | RC pipe (CL III)(18 in) (464-7003) | LF | 282 | $100.00 | $81.00 | $81.00 | $65.00 | $92.00 | $100.00 | $80.00 |
| 29 | RC pipe (CL III)(24 in) (464-7005) | LF | 28 | $175.00 | $110.00 | $120.00 | $150.00 | $122.50 | $260.00 | $185.00 |
| 30 | Wingwall (PW - 2) (HW=5 FT) (466-7189) | EACH | 1 | $20,000 | $14,100 | $11,000 | $7,500.00 | $17,250 | $14,000 | $9,300.00 |
| 31 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 16 | $1,400.00 | $1,450.00 | $1,100.00 | $900.00 | $1,250.00 | $2,300.00 | $1,200.00 |
| 32 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,500.00 | $2,000.00 | $2,000.00 | $2,500.00 | $1,415.00 | $2,600.00 | $2,900.00 |
| 33 | Clean existing culverts (480-7001) | EACH | 1 | $4,500.00 | $2,700.00 | $3,100.00 | $2,000.00 | $12,900 | $7,800.00 | $2,500.00 |
| 34 | Removing structure (set) (496-7004) | EACH | 19 | $600.00 | $350.00 | $250.00 | $750.00 | $476.00 | $250.00 | $900.00 |
| 35 | Removing structure (wingwall) (496-7005) | EACH | 1 | $2,500.00 | $2,200.00 | $1,700.00 | $1,500.00 | $2,695.00 | $1,160.00 | $2,000.00 |
| 36 | Removing structure (pipe) (496-7037) | EACH | 9 | $1,000.00 | $550.00 | $530.00 | $1,500.00 | $1,000.00 | $590.00 | $1,800.00 |
| 37 | Mobilization (500-7001) | LS | 1 | $175,000 | $179,000 | $205,000 | $150,000 | $162,350 | $208,398 | $200,000 |
| 38 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $6,000.00 | $3,200.00 | $4,400.00 | $6,000.00 | $8,230.00 | $4,700.00 | $6,500.00 |
| 39 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $10,300 | $2,800.00 | $10,000 | $6,000.00 | $5,000.00 | $7,000.00 |
| 40 | TMA (stationary) (505-7001) | DAY | 63 | $175.00 | $210.00 | $260.00 | $125.00 | $500.00 | $300.00 | $300.00 |
| 41 | TMA (mobile operation) (505-7003) | DAY | 26 | $350.00 | $850.00 | $600.00 | $125.00 | $900.00 | $300.00 | $300.00 |
| 42 | Rock filter dams (install) (type 2) (506-7002) | LF | 135 | $55.00 | $35.00 | $45.00 | $36.00 | $40.00 | $40.00 | $60.00 |
| 43 | Rock filter dams (remove) (506-7011) | LF | 135 | $17.50 | $5.00 | $13.00 | $10.00 | $11.00 | $11.00 | $15.00 |
| 44 | Temporary sediment control fence (install) (506-7039) | LF | 1,530 | $4.00 | $3.50 | $4.75 | $3.75 | $4.17 | $4.15 | $4.00 |
| 45 | Temporary sediment control fence (remove) (506-7041) | LF | 1,530 | $1.75 | $1.00 | $1.25 | $1.00 | $1.00 | $1.00 | $1.30 |
| 46 | Concrete curb (type II) (529-7002) | LF | 46 | $50.00 | $130.00 | $10.00 | $80.00 | $85.00 | $100.00 | $100.00 |
| 47 | Concrete curb & gutter (type II) (529-7009) | LF | 104 | $50.00 | $70.00 | $59.00 | $100.00 | $68.00 | $100.00 | $125.00 |
| 48 | Driveways (concrete) (530-7006) | SY | 329 | $115.00 | $125.00 | $120.00 | $200.00 | $138.00 | $110.00 | $250.00 |
| 49 | Driveways (ACP) (530-7010) | SY | 234 | $75.00 | $72.00 | $50.00 | $85.80 | $131.00 | $135.00 | $80.00 |
| 50 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 10,060 | $0.50 | $0.35 | $0.66 | $0.15 | $0.68 | $0.30 | $0.50 |
| 51 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 10,033 | $0.50 | $0.35 | $0.66 | $0.15 | $0.41 | $0.30 | $0.50 |
| 52 | Fill milled asphalt RMBL strip(centerline) (533-7006) | LF | 5,753 | $7.50 | $4.50 | $5.00 | $3.00 | $2.36 | $8.00 | $5.00 |
| 53 | Metal W-beam guard fence (timber post) (540-7001) | LF | 200 | $32.50 | $30.00 | $34.00 | $30.80 | $30.00 | $30.00 | $38.00 |
| 54 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,400.00 | $3,600.00 | $4,100.00 | $3,505.00 | $3,555.00 | $3,650.00 | $4,000.00 |
| 55 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 2 | $300.00 | $400.00 | $480.00 | $315.00 | $350.00 | $426.00 | $400.00 |
| 56 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 21 | $750.00 | $625.00 | $730.00 | $720.00 | $800.00 | $647.00 | $900.00 |
| 57 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $1,000.00 | $800.00 | $940.00 | $920.00 | $1,022.00 | $835.00 | $1,150.00 |
| 58 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,000.00 | $1,100.00 | $1,200.00 | $1,155.00 | $1,283.00 | $1,035.00 | $1,443.75 |
| 59 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 3 | $950.00 | $500.00 | $590.00 | $660.00 | $735.00 | $525.00 | $825.00 |
| 60 | Remove SM RD SN sup&AM (644-7073) | EACH | 19 | $150.00 | $130.00 | $160.00 | $110.00 | $125.00 | $109.00 | $130.00 |
| 61 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015) | EACH | 4 | $25.00 | $27.00 | $31.00 | $24.00 | $30.00 | $27.00 | $30.00 |
| 62 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 4 | $75.00 | $90.00 | $110.00 | $53.00 | $60.00 | $95.00 | $65.00 |
| 63 | Remove delin & object marker assms (658-7078) | EACH | 4 | $20.00 | $27.00 | $31.00 | $20.00 | $25.00 | $28.00 | $30.00 |
| 64 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 23 | $15.00 | $38.50 | $44.00 | $35.00 | $40.00 | $39.00 | $45.00 |
| 65 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 700 | $1.75 | $0.45 | $1.25 | $0.42 | $0.47 | $0.46 | $0.45 |
| 66 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 15,425 | $1.10 | $0.45 | $0.80 | $0.42 | $0.47 | $0.46 | $0.45 |
| 67 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 28,425 | $1.00 | $0.45 | $0.80 | $0.42 | $0.47 | $0.46 | $0.45 |
| 68 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 978 | $1.75 | $1.50 | $0.71 | $1.00 | $0.67 | $1.10 | $2.00 |
| 69 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 1,549 | $1.50 | $1.50 | $0.71 | $1.00 | $0.67 | $1.10 | $2.00 |
| 70 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 240 | $1.25 | $2.20 | $1.25 | $2.00 | $2.30 | $2.20 | $2.50 |
| 71 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 64 | $2.25 | $2.20 | $1.25 | $2.00 | $2.30 | $2.20 | $2.50 |
| 72 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 300 | $2.00 | $2.20 | $1.25 | $2.00 | $2.30 | $2.20 | $2.50 |
| 73 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 34 | $17.50 | $15.00 | $29.00 | $14.00 | $16.00 | $15.00 | $16.00 |
| 74 | Pavement sler 6" (666-7347) | LF | 1,018 | $1.00 | $0.22 | $0.36 | $0.20 | $0.25 | $0.22 | $0.25 |
| 75 | Pavement sler 8" (666-7348) | LF | 344 | $1.25 | $0.28 | $0.50 | $0.25 | $0.30 | $0.28 | $0.30 |
| 76 | Pavement sler 24" (666-7352) | LF | 34 | $7.50 | $1.10 | $10.00 | $1.00 | $2.00 | $1.10 | $2.00 |
| 77 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 1,090 | $1.00 | $0.85 | $1.25 | $0.80 | $1.00 | $0.89 | $0.92 |
| 78 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 13,021 | $0.85 | $0.85 | $1.25 | $0.80 | $0.89 | $0.89 | $0.90 |
| 79 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 2,600 | $1.00 | $0.85 | $1.25 | $0.80 | $0.90 | $0.89 | $0.92 |
| 80 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 15,370 | $0.85 | $0.85 | $1.25 | $0.80 | $0.89 | $0.89 | $0.90 |
| 81 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 8 | $250.00 | $225.00 | $530.00 | $215.00 | $239.00 | $238.00 | $250.00 |
| 82 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 2 | $550.00 | $320.00 | $880.00 | $300.00 | $335.00 | $332.00 | $350.00 |
| 83 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $325.00 | $270.00 | $630.00 | $250.00 | $300.00 | $277.00 | $300.00 |
| 84 | Reflectorized pavement marker type I-C (672-7002) | EACH | 55 | $6.25 | $6.50 | $7.50 | $6.00 | $7.00 | $6.65 | $7.00 |
| 85 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 328 | $6.25 | $6.50 | $7.50 | $6.00 | $7.00 | $6.65 | $7.00 |
| 86 | Eliminating existing PM & markers (4") (677-7001) | LF | 2,760 | $1.25 | $0.40 | $0.63 | $0.35 | $0.39 | $0.39 | $0.40 |
| 87 | Eliminating existing PM & markers (6") (677-7002) | LF | 15,571 | $0.75 | $0.45 | $0.63 | $0.40 | $0.44 | $0.44 | $0.45 |
| 88 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,018 | $0.85 | $0.05 | $0.94 | $0.01 | $0.10 | $0.01 | $0.01 |
| 89 | Pavement surface preparation for marking (8") (678-7004) | LF | 344 | $0.50 | $0.05 | $1.25 | $0.01 | $0.10 | $0.01 | $0.01 |
| 90 | Pavement surface preparation for marking (24") (678-7008) | LF | 34 | $2.00 | $0.15 | $1.25 | $0.09 | $0.10 | $0.10 | $0.10 |
| 91 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $20.00 | $11.00 | $6.25 | $10.00 | $11.00 | $11.00 | $20.00 |
| 92 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $50.00 | $11.00 | $6.25 | $10.00 | $11.00 | $11.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 6, 2025. Compiled by Mirage Metrics.