TxDOT contract A00189031 bid tabulation

ASPHALT PAVEMENT REPAIR, IH0045 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area). Let by Texas DOT on June 4, 2025, Harris, Houston District. 4 bids received; low bid $1,718,248 by Elite Kings Construction, LLC, -13% against the engineer's estimate of $1,969,787.

Owner
Texas DOT
Letting
04 JUN 2025
Pay items
65
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Elite Kings Construction, LLC$1,718,248Low-13%
2Isi Contracting, Inc.$2,077,813+21%+5.0%
3MC2 Civil, LLC$2,159,374+26%+10%
4Texas Materials Group, Inc.$4,410,810+157%+124%
TxDOT contract A00189031: bids by rank

Engineer's estimate: $1,969,787.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Elite Kings Construction, LLC2. Isi Contracting, Inc.3. MC2 Civil, LLC4. Texas Materials Group, Inc.
1Remove (2") TRT/untrt base & asphalt pavement (105-7022)SY12,500$5.00$7.65$4.00$6.00$19.00
2Remove (8") TRT/untrt base & asphalt pavement (105-7028)SY260$18.00$12.10$20.00$15.00$76.00
3D-GR HMA type D sac-B PG70-22 (341-7050)TON1,375$175.00$175.00$183.00$220.00$336.00
4Tack coat (341-7082)GAL1,375$4.00$6.00$5.00$4.00$5.30
5Flexible pavement structure repair(6") (351-7005)SY2,500$48.00$6.00$65.00$75.00$111.00
6Concrete pavement (CRCP) (8") (360-7002)SY260$196.00$60.00$150.00$200.00$264.00
7Full-depth repair CRCP (var depth) (361-7044)CY588$985.00$60.00$1,100.00$1,200.00$2,900.00
8Mobilization (500-7001)LS1$179,400$300,000$100,000$200,000$447,000
9Barricades, signs and traffic handling (502-7001)MO4$6,210.00$1,500.00$8,500.00$20,000$1,200.00
10Portable changeable message sign (503-7001)DAY200$220.00$200.00$185.00$75.00$380.00
11TMA (stationary) (505-7001)DAY150$420.00$260.00$1,000.00$250.00$316.50
12TMA (mobile operation) (505-7003)DAY30$305.00$200.00$625.00$600.00$681.00
13Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013)LF270$46.00$23.81$10.00$30.00$65.00
14Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037)LF270$27.00$11.35$14.00$30.00$65.00
15Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF270$172.00$98.96$80.00$200.00$152.00
16Mill rumble strips (asphalt) (shoulder) (533-7001)LF3,050$4.00$1.27$4.25$7.00$1.10
17Remove metal beam guard fence (542-7001)LF175$43.00$5.25$15.00$6.00$6.00
18Guardrail end treatment (remove) (544-7003)EACH1$320.00$350.14$500.00$250.00$725.00
19Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH1$24,600$31,000$26,500$30,000$35,400
20Cca (install)(N)(TL3)(work zone) (545-7018)EACH2$12,400$6,800.00$7,500.00$9,500.00$35,400
21Aluminum signs (type A) (636-7001)SF84$41.00$55.73$20.18$40.00$103.00
22Install small roadside sign support and assembly (rail mount) (644-7063)EACH2$4,000.00$4,350.00$5,083.08$4,500.00$8,800.00
23Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH8$50.00$12.00$25.52$30.00$28.00
24Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH14$15.00$22.00$167.03$30.00$28.00
25Work zone pavement marking removing (reflectorized) type I-C (662-7049)EACH249$2.00$2.50$4.86$6.00$7.25
26Work zone pavement marking removing (traffic BTN) type W (662-7057)EACH166$2.00$4.00$2.09$6.00$7.25
27Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069)EACH4$760.00$970.13$627.20$500.00$660.00
28Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072)EACH8$773.00$999.91$836.27$600.00$791.00
29Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF20,670$1.60$0.75$0.94$0.70$1.00
30Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF11,040$1.50$0.77$1.05$0.70$1.00
31Reflectorized pavement marking type III (W)(6")(DOT) (666-7238)LF208$1.65$5.50$1.05$3.00$4.00
32Reflectorized pavement marking type III (W)(12")(solid) (666-7242)LF6,390$5.40$2.10$5.23$4.00$5.50
33Reflectorized pavement marking type III (W)(12")(DOT) (666-7243)LF4,147$2.50$5.50$5.23$5.00$7.00
34Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF21,045$1.00$11.00$1.05$0.70$1.00
35Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262)LF11,040$1.60$2.19$2.09$1.00$1.50
36Pavement sler (entr gore) (666-7361)EACH4$473.00$127.91$209.07$140.00$185.00
37Pavement sler (exit gore) (666-7362)EACH8$419.00$142.86$209.07$270.00$360.00
38PRFB rumble strip (BLK)(4')(transverse) (668-7001)LF160$10.00$43.92$261.33$10.00$45.00
39Prefabricated PM type C (W)(arrow) (668-7091)EACH16$306.00$283.68$261.33$250.00$330.00
40Prefabricated PM type C (W)(double arrow) (668-7093)EACH5$498.00$312.94$357.12$470.00$620.00
41Prefabricated PM type C (W)(number) (668-7102)EACH9$266.00$97.81$261.33$200.00$264.00
42Prefabricated PM type C (W)(word) (668-7103)EACH25$300.00$305.88$261.33$345.00$455.00
43Prefabricated PM type C (multi)(shield) (668-7135)EACH18$2,165.00$1,987.50$2,613.35$3,000.00$4,000.00
44Reflectorized pavement marker type II-C-R (672-7006)EACH1,492$5.50$3.70$7.32$6.00$8.00
45Eliminating existing PM & markers (6") (677-7002)LF64,253$0.70$1.20$1.31$0.40$0.55
46Eliminating existing PM & markers (12") (677-7006)LF10,537$1.50$2.50$2.61$2.00$2.70
47Eliminating existing PM & markers (arrow) (677-7009)EACH16$76.00$65.29$52.27$75.00$100.00
48Eliminating existing PM & markers (double arrow) (677-7010)EACH5$155.00$75.31$67.95$75.00$100.00
49Eliminating existing PM & markers (number) (677-7014)EACH9$34.70$55.29$104.53$75.00$100.00
50Eliminating existing PM & markers (word) (677-7015)EACH25$40.00$67.56$52.27$75.00$100.00
51Eliminating existing PM & markers (entr gore) (677-7016)EACH4$736.00$260.00$339.74$100.00$132.00
52Eliminating existing PM & markers (exit gore) (677-7017)EACH8$668.00$350.00$339.74$100.00$132.00
53Eliminating existing PM & markers (shield) (677-7022)EACH18$200.00$95.00$193.39$100.00$132.00
54Pavement surface preparation for marking (6") (678-7002)LF64,253$0.04$0.88$0.26$0.01$0.01
55Pavement surface preparation for marking (12") (678-7006)LF10,537$0.45$0.94$0.52$0.10$0.15
56Pavement surface preparation for marking (arrow) (678-7009)EACH16$6.50$29.08$26.13$5.00$6.50
57Pavement surface preparation for marking (double arrow) (678-7010)EACH5$9.00$165.90$59.35$5.00$6.50
58Pavement surface preparation for marking (number) (678-7015)EACH9$14.50$90.00$104.53$5.00$6.50
59Pavement surface preparation for marking (word) (678-7016)EACH25$5.00$56.50$26.13$5.00$6.50
60Pavement surface preparation for marking (entr gore) (678-7017)EACH4$302.00$65.00$104.53$10.00$13.00
61Pavement surface preparation for marking (exit gore) (678-7018)EACH8$263.00$75.00$104.53$10.00$13.00
62Pavement surface preparation for marking (shield) (678-7025)EACH18$43.00$82.00$167.25$10.00$13.00
63Pavement surface preparation for marking (RPM) (678-7033)EACH1,492$1.20$2.61$1.45$0.25$0.35
64Fiber reinforced polymer patching materials (721-7001)LB15,300$7.00$7.72$3.00$4.00$26.50
65Bulking aggregate (721-7002)LB53,450$0.50$2.10$0.32$0.30$1.45
TxDOT contract A00189031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy