TxDOT contract A00184365 bid tabulation
Hazard Elimination & Safety, SH 158 (ASTER AVE to MIDLAND COUNTY LINE). Let by Texas DOT on June 4, 2025, Ector, Odessa District. 3 bids received; low bid $5,970,353 by Jones Bros. Dirt & Paving Contractors, Inc., -44% against the engineer's estimate of $10,589,343.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 65
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jones Bros. Dirt & Paving Contractors, Inc. | $5,970,353 | Low | -44% |
| 2 | Reece Albert, Inc. | $7,330,797 | +23% | -31% |
| 3 | Ragle Construction, Inc. | $10,833,155 | +81% | +2.0% |
Engineer's estimate: $10,589,343.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jones Bros. Dirt & Paving Contractors, Inc. | 2. Reece Albert, Inc. | 3. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 2,011 | $25.00 | $11.06 | $23.39 | $19.00 |
| 2 | Removing concrete (curb & gutter) (104-7017) | LF | 98 | $15.00 | $50.00 | $9.19 | $16.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 22,277 | $12.00 | $18.00 | $20.02 | $53.00 |
| 4 | Embankment (final)(OC)(type A) (132-7001) | CY | 5,253 | $55.00 | $9.50 | $10.39 | $25.00 |
| 5 | FL BS (compacted in place)(type A GR 4) (12") (247-7115) | SY | 63,452 | $60.00 | $17.25 | $23.28 | $25.00 |
| 6 | Prime coat (MC-30) (310-7004) | GAL | 12,694 | $8.00 | $5.21 | $5.18 | $6.00 |
| 7 | Asphalt (AC-20-5TR) (316-7007) | GAL | 24,124 | $4.00 | $4.48 | $4.51 | $8.00 |
| 8 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 701 | $180.00 | $139.00 | $236.67 | $165.78 |
| 9 | Tom-C PG76-22 sac-A (347-7001) | TON | 12,657 | $200.00 | $132.85 | $176.45 | $185.00 |
| 10 | Flexible pavement structure repair(3") (351-7002) | SY | 2,500 | $41.00 | $46.00 | $36.87 | $60.00 |
| 11 | Cut & restore asphalt paving (400-7008) | SY | 553 | $110.00 | $293.42 | $316.19 | $78.00 |
| 12 | Cem stabil BKFL (400-7010) | CY | 369 | $220.00 | $157.50 | $439.66 | $195.00 |
| 13 | RC pipe (CL III)(18 in) (464-7003) | LF | 0 | $70.00 | $0.00 | $0.00 | $0.00 |
| 14 | RC pipe (CL III)(24 in) (464-7005) | LF | 0 | $130.00 | $0.00 | $0.00 | $0.00 |
| 15 | RC pipe (CL III)(30 in) (464-7007) | LF | 0 | $250.00 | $0.00 | $0.00 | $0.00 |
| 16 | RC pipe (CL III)(36 in) (464-7009) | LF | 0 | $300.00 | $0.00 | $0.00 | $0.00 |
| 17 | RC pipe (CL III)(42 in) (464-7010) | LF | 0 | $260.00 | $0.00 | $0.00 | $0.00 |
| 18 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 18 | $1,800.00 | $1,575.00 | $2,964.32 | $1,900.00 |
| 19 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 1 | $1,800.00 | $1,890.00 | $2,857.07 | $2,050.00 |
| 20 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 3 | $2,000.00 | $1,995.00 | $2,989.64 | $2,050.00 |
| 21 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 6 | $3,000.00 | $2,940.00 | $3,198.12 | $2,050.00 |
| 22 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 10 | $2,500.00 | $2,310.00 | $3,198.12 | $2,050.00 |
| 23 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 6 | $4,000.00 | $3,675.00 | $3,399.38 | $2,500.00 |
| 24 | Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365) | EACH | 4 | $5,000.00 | $3,990.00 | $4,791.56 | $3,500.00 |
| 25 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 2 | $5,500.00 | $4,830.00 | $7,406.74 | $3,500.00 |
| 26 | Set (type II) (42 in) (RCP) (4: 1) (C) (467-7378) | EACH | 2 | $6,500.00 | $5,250.00 | $5,719.52 | $4,910.00 |
| 27 | Removing structure (headwall) (496-7006) | EACH | 24 | $1,800.00 | $550.00 | $1,272.16 | $7,500.00 |
| 28 | Removing structure (pipe) (496-7007) | LF | 1,613 | $25.00 | $22.00 | $35.09 | $30.00 |
| 29 | Mobilization (500-7001) | LS | 1 | $665,100 | $245,000 | $399,419 | $1,080,000 |
| 30 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $15,500 | $20,000 | $5,266.09 | $150,000 |
| 31 | TMA (stationary) (505-7001) | DAY | 442 | $230.00 | $165.00 | $41.72 | $346.00 |
| 32 | TMA (mobile operation) (505-7003) | DAY | 52 | $500.00 | $935.00 | $393.62 | $670.00 |
| 33 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 677 | $10.00 | $7.70 | $6.72 | $7.00 |
| 34 | Biodegradable erosion control logs (remove) (506-7046) | LF | 677 | $2.00 | $2.20 | $3.10 | $2.00 |
| 35 | Intersections (ACP) (530-7002) | SY | 3,291 | $100.00 | $51.00 | $56.34 | $67.00 |
| 36 | Driveways (concrete) (530-7006) | SY | 1,805 | $120.00 | $134.19 | $170.45 | $98.00 |
| 37 | Driveways (ACP) (530-7010) | SY | 7,766 | $85.00 | $52.00 | $65.49 | $67.00 |
| 38 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 19 | $750.00 | $660.00 | $1,155.74 | $600.00 |
| 39 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 38 | $1,000.00 | $968.00 | $797.81 | $880.00 |
| 40 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $1,000.00 | $935.00 | $899.04 | $850.00 |
| 41 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $1,400.00 | $1,089.00 | $1,026.79 | $990.00 |
| 42 | Install small roadside sign support and assembly (inst sign only) (644-7064) | EACH | 41 | $120.00 | $385.00 | $368.78 | $350.00 |
| 43 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 15 | $700.00 | $715.00 | $907.48 | $650.00 |
| 44 | Install delineator assembly (D-SW)SZ 2(WC)GND(BI) (658-7010) | EACH | 17 | $65.00 | $82.50 | $75.92 | $75.00 |
| 45 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 18 | $100.00 | $82.50 | $106.05 | $75.00 |
| 46 | Remove delin & object marker assms (658-7078) | EACH | 36 | $35.00 | $60.00 | $60.27 | $20.00 |
| 47 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 16,000 | $0.30 | $0.09 | $0.10 | $0.34 |
| 48 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 2,200 | $0.35 | $1.05 | $1.14 | $0.31 |
| 49 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 100 | $1.75 | $2.20 | $2.41 | $2.82 |
| 50 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 716 | $1.10 | $0.99 | $1.08 | $1.47 |
| 51 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 69,538 | $0.85 | $1.01 | $1.11 | $0.88 |
| 52 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 69,112 | $0.85 | $1.01 | $1.11 | $0.88 |
| 53 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 16,372 | $0.85 | $1.08 | $1.18 | $1.06 |
| 54 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 7 | $250.00 | $275.00 | $301.29 | $210.00 |
| 55 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 3 | $300.00 | $352.00 | $385.65 | $275.00 |
| 56 | Prefabricated PM type C (Y)(24")(solid) (668-7127) | LF | 184 | $17.50 | $15.40 | $16.87 | $12.75 |
| 57 | Reflectorized pavement marker type I-C (672-7002) | EACH | 37 | $4.00 | $5.50 | $6.03 | $6.00 |
| 58 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,728 | $4.00 | $4.68 | $5.12 | $6.00 |
| 59 | Eliminating existing PM & markers (4") (677-7001) | LF | 3,000 | $0.80 | $2.43 | $6.83 | $2.00 |
| 60 | Bonding course (3007-7001) | GAL | 23,006 | $5.90 | $2.08 | $2.79 | $7.00 |
| 61 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 464 | $70.00 | $61.95 | $66.76 | $72.00 |
| 62 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 638 | $130.00 | $101.85 | $77.97 | $84.00 |
| 63 | Thermoplastic pipe (PP) (30") (468-7003) | LF | 246 | $250.00 | $115.50 | $109.68 | $105.00 |
| 64 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 279 | $300.00 | $157.50 | $116.92 | $115.00 |
| 65 | Thermoplastic pipe (PP) (42") (468-7005) | LF | 81 | $260.00 | $204.75 | $183.05 | $160.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.