TxDOT contract A00190666 bid tabulation

Total Maintenance, IH0610 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area). Let by Texas DOT on June 4, 2025, Harris, Houston District. 3 bids received; low bid $7,981,349 by Hazmat International, Inc., -5.1% against the engineer's estimate of $8,414,517.

Owner
Texas DOT
Letting
04 JUN 2025
Pay items
180
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hazmat International, Inc.$7,981,349Low-5.0%
2Isi Contracting, Inc.$9,290,685+16%+10%
3Roy Jorgensen Associates, Inc.$11,772,865+48%+40%
TxDOT contract A00190666: bids by rank

Engineer's estimate: $8,414,517.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Hazmat International, Inc.2. Isi Contracting, Inc.3. Roy Jorgensen Associates, Inc.
1Blading (150-7001)STA100$200.00$200.00$280.00$350.00
2Blading (150-7003)LF50,000$1.30$0.25$1.50$2.00
3Full-depth repair CRCP (var depth) (361-7044)CY15$500.00$200.00$1,260.00$3,000.00
4Concrete structure repair(rapid vert and overhead) (429-7008)SF40$125.00$50.00$85.00$300.00
5Concrete structure repair (standard) (429-7009)SF50$150.00$50.00$85.00$250.00
6Riprap (mow strip)(4 in) (432-7013)CY75$300.00$150.00$300.00$1,000.00
7Cleaning and sealing existing joints (438-7001)LF10,000$32.00$32.00$23.00$70.00
8Cleaning existing joints (438-7008)LF10,000$15.00$15.00$17.00$30.00
9Mobilization (callout) (500-7002)EACH100$250.00$1.00$350.00$100.00
10Mobilization (emergency) (500-7033)EACH150$600.00$1,000.00$700.00$1,000.00
11Portable changeable message sign (503-7001)DAY365$75.00$25.00$250.00$200.00
12TMA (stationary) (505-7001)DAY750$150.00$300.00$200.00$200.00
13TMA (mobile operation) (505-7003)DAY750$150.00$300.00$315.00$200.00
14Portable concrete traffic barrier (des source) (safety SH)(type 2) (512-7062)LF150$26.00$26.00$19.60$50.00
15Portable concrete traffic barrier (move)(safety SH)(type 2) (512-7063)LF2,400$3.00$20.00$3.00$20.00
16Portable concrete traffic barrier (stockpile)(safety SH)(type 2) (512-7064)LF150$26.00$26.00$19.60$50.00
17Landscape pavers (528-7001)SY100$40.00$1.50$35.00$100.00
18Remove and relay pavers (528-7003)SY100$24.00$1.00$17.50$100.00
19Concrete curb (doweled) (529-7012)LF50$18.00$5.00$14.00$100.00
20Metal beam guard fence trans (thrie-beam) (540-7005)EACH10$1,800.00$1,800.00$2,000.00$3,000.00
21Downstream anchor terminal section (540-7015)EACH12$1,800.00$1,800.00$1,800.00$2,750.00
22Remove metal beam guard fence (542-7001)LF50$2.00$1.00$10.00$100.00
23Chain link fence (install) (6') (550-7001)LF500$20.00$20.00$25.00$50.00
24Chain link fence (repair) (6') (550-7002)LF500$15.00$25.00$20.00$50.00
25Chain link fence (install) (8') (550-7005)LF300$24.00$20.00$18.20$50.00
26Chain link fence (remove) (550-7007)LF500$1.00$1.00$3.00$50.00
27Gate (install) (double) (6' X 14') (550-7009)EACH1$800.00$800.00$1,700.00$3,000.00
28Gate (repair) (double) (6' X 14') (550-7010)EACH1$800.00$1.00$1,000.00$3,000.00
29Gate (install)(6'X16') (550-7013)EACH1$800.00$800.00$1,758.77$3,000.00
30Gate (remove) (550-7016)EACH1$150.00$1.00$105.00$5,000.00
31Gate (install)(6'X24') (550-7018)EACH1$1,200.00$300.00$1,750.00$5,000.00
32In bridge MNT clearance sign assembly(type N) (644-7061)EACH5$1,500.00$1,000.00$2,100.00$3,000.00
33In bridge MNT clearance sign assembly(type S) (644-7062)EACH5$1,500.00$1,000.00$2,100.00$3,000.00
34Relocate BRDG MNT clearance sign assembly (644-7069)EACH5$1,500.00$250.00$1,833.89$3,000.00
35Remove BRDG MNT clearance sign assembly (644-7074)EACH5$1,500.00$250.00$1,833.89$3,000.00
36Install delineator assembly (D-SW)SZ 1(WFLX)SRF (658-7006)EACH50$100.00$100.00$75.00$150.00
37Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH15,000$7.00$7.00$6.00$7.00
38Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015)EACH1,000$10.00$1.00$25.00$1.00
39Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH5,000$7.00$7.00$6.00$10.00
40Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH10,000$7.00$7.50$26.67$8.00
41Install delineator assembly (D-SY)SZ 1(BRF)GF1 (658-7034)EACH1,000$10.00$1.00$13.00$1.00
42Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF5,000$1.00$1.50$1.57$1.80
43Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF40,000$2.00$2.15$2.09$1.30
44Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027)LF5,000$5.00$5.50$5.22$4.05
45Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF20,000$5.00$6.05$5.79$4.05
46Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF20,000$6.00$7.25$7.46$7.05
47Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH400$200.00$210.00$214.00$155.00
48Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH200$255.00$260.00$245.31$170.00
49Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH50$235.00$250.00$234.87$160.00
50Reflectorized pavement marking type I(W)(U-LT arrow)(100 mil) (666-7054)EACH25$310.00$250.00$234.87$200.00
51Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060)EACH50$400.00$100.00$234.87$155.00
52Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH200$210.00$220.00$208.78$225.00
53Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069)EACH50$1,600.00$1,700.00$1,565.82$1,100.00
54Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072)EACH50$1,600.00$1,700.00$1,565.82$1,100.00
55Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH10$275.00$100.00$730.72$500.00
56Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114)LF5,000$1.40$2.10$2.04$2.00
57Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF10,000$3.20$3.55$3.60$3.05
58RE PV marking type I(black)6"(shadow)(100MIL) (666-7138)LF100,000$1.20$1.50$1.25$1.25
59Reflectorized pavement marking type II (W) 18" (yld tri) (666-7200)EACH500$35.00$20.00$46.97$15.00
60Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201)EACH250$50.00$70.00$67.85$30.00
61Pavement sler 6" (666-7347)LF405,000$0.05$0.06$0.01$0.11
62Pavement sler 8" (666-7348)LF45,000$0.10$0.17$0.16$0.22
63Pavement sler 12" (666-7350)LF35,000$0.20$0.25$0.26$0.55
64Pavement sler 24" (666-7352)LF20,000$0.20$0.45$0.26$1.10
65Pavement sler (arrow) (666-7353)EACH400$5.00$6.00$5.22$15.00
66Pavement sler (word) (666-7354)EACH200$5.00$6.00$5.22$15.00
67Pavement sler (double arrow) (666-7356)EACH200$5.00$6.00$5.22$19.00
68Pavement sler (uturn arrow) (666-7358)EACH50$5.00$11.00$10.44$27.00
69Pavement sler (LN reduct arrow) (666-7359)EACH50$5.00$5.00$10.44$27.00
70Pavement sler (U-L arrow) (666-7360)EACH25$5.00$11.00$10.44$27.00
71Pavement sler (entr gore) (666-7361)EACH50$5.00$11.00$10.44$100.00
72Pavement sler (exit gore) (666-7362)EACH50$5.00$11.00$10.44$185.00
73Pavement sler (RR crossing) (666-7364)EACH10$5.00$5.00$10.44$49.00
74Pavement sler (yld tri) (666-7365)EACH750$5.00$10.00$5.22$3.00
75Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF100,000$1.15$1.20$1.10$1.10
76Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF100,000$1.15$1.20$1.10$1.10
77Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF100,000$1.15$1.20$1.10$1.10
78Prefabricated PM type C (multi)(shield) (668-7135)EACH30$3,800.00$4,000.00$3,131.65$3,550.00
79Reflectorized pavement marker type I-R (672-7003)EACH1,400$8.00$8.00$7.83$10.00
80Reflectorized pavement marker type II-A-A (672-7004)EACH250$7.00$7.00$6.26$10.00
81Reflectorized pavement marker type II-C-R (672-7006)EACH2,500$15.00$15.00$6.26$15.00
82Eliminating existing PM & markers (6") (677-7002)LF40,500$0.26$0.35$0.37$0.35
83Eliminating existing PM & markers (8") (677-7004)LF45,000$0.35$0.65$0.68$0.60
84Eliminating existing PM & markers (12") (677-7006)LF35,000$1.00$1.25$1.30$1.55
85Eliminating existing PM & markers (24") (677-7008)LF20,000$2.00$3.00$3.13$2.55
86Eliminating existing PM & markers (arrow) (677-7009)EACH400$50.00$85.00$78.29$100.00
87Eliminating existing PM & markers (double arrow) (677-7010)EACH200$50.00$80.00$78.29$50.00
88Eliminating existing PM & markers (uturn arrow) (677-7012)EACH50$50.00$75.00$78.29$100.00
89Eliminating existing PM & markers (utrn/LT arr) (677-7013)EACH25$55.00$75.00$78.29$55.00
90Eliminating existing PM & markers (word) (677-7015)EACH200$50.00$75.00$78.29$120.00
91Eliminating existing PM & markers (entr gore) (677-7016)EACH50$200.00$200.00$208.78$200.00
92Eliminating existing PM & markers (exit gore) (677-7017)EACH50$200.00$200.00$208.78$200.00
93Eliminating existing PM & markers (RR crossing) (677-7019)EACH10$50.00$100.00$104.39$200.00
94Eliminating existing PM & markers (shield) (677-7022)EACH30$60.00$15.00$260.97$200.00
95Pavement surface preparation for marking (6") (678-7002)LF405,000$0.20$0.20$0.01$0.05
96Pavement surface preparation for marking (8") (678-7004)LF45,000$0.02$0.09$0.08$0.10
97Pavement surface preparation for marking (12") (678-7006)LF35,000$0.12$0.12$0.13$0.30
98Pavement surface preparation for marking (24") (678-7008)LF20,000$0.08$0.24$0.25$0.35
99Pavement surface preparation for marking (arrow) (678-7009)EACH400$10.00$10.00$5.22$20.00
100Pavement surface preparation for marking (double arrow) (678-7010)EACH200$10.00$10.00$5.22$20.00
101Pavement surface preparation for marking (uturn arr) (678-7012)EACH50$10.00$6.00$5.22$50.00
102Pavement surface preparation for marking (U/LT arrow) (678-7013)EACH25$10.00$6.00$5.22$50.00
103Pavement surface preparation for marking (word) (678-7016)EACH200$10.00$10.00$5.22$50.00
104Pavement surface preparation for marking (entr gore) (678-7017)EACH50$10.00$25.00$26.10$100.00
105Pavement surface preparation for marking (exit gore) (678-7018)EACH50$10.00$25.00$26.10$100.00
106Pavement surface preparation for marking (RR crossing) (678-7020)EACH10$10.00$10.00$10.44$100.00
107Pavement surface preparation for marking (18")(yld tri) (678-7022)EACH500$10.00$5.00$5.22$10.00
108Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH250$4.00$5.00$5.22$10.00
109Pavement surface preparation for marking (shield) (678-7025)EACH30$15.00$100.00$104.39$20.00
110Pothole repair (standard) (700-7006)LB10,000$4.00$6.00$7.00$10.00
111Spot mowing (730-7021)ACRE250$285.00$25.00$300.00$150.00
112Broadcast application (731-7002)MI200$1,000.00$10.00$500.00$500.00
113Pavement edges, structures & fixtures (731-7003)MI300$150.00$400.00$330.00$700.00
114Litter removal (spot) (734-7003)ACRE150$30.00$10.00$30.00$100.00
115Debris removal (spot debris) (735-7072)MI100$75.00$150.00$300.00$750.00
116Cleaning / sweeping (spot) (738-7104)MI50$200.00$200.00$140.00$400.00
117Cleaning / sweeping (handwork) (738-7105)SY750,000$0.55$0.05$0.45$0.50
118Graffiti removal (abrasive clean) (740-7002)SF5,000$1.20$3.00$1.20$10.00
119Graffiti removal (painting) (740-7003)SF250,000$0.80$3.00$0.90$1.00
120Tree trimming / brush removal (752-7001)MI50$1,000.00$750.00$1,000.00$2,000.00
121Tree removal (4" - 12" diameter) (752-7005)EACH250$130.00$100.00$175.00$150.00
122Tree removal (12" - 18" diameter) (752-7006)EACH75$150.00$100.00$250.00$200.00
123Tree removal (18" - 24" diameter) (752-7007)EACH5$200.00$50.00$250.00$300.00
124Tree removal (24" - 30" diameter) (752-7008)EACH5$400.00$50.00$350.00$300.00
125Tree removal (30" - 36" diameter) (752-7009)EACH10$500.00$50.00$525.00$300.00
126Tree removal (36" - 42" diameter) (752-7010)EACH5$1,000.00$25.00$1,000.00$300.00
127Tree removal (42" - 48" diameter) (752-7011)EACH1$1,000.00$25.00$700.00$300.00
128Tree removal (48" - 60" diameter) (752-7012)EACH1$1,000.00$25.00$840.00$300.00
129Ditch cleaning and reshaping (foot) (760-7001)LF500$5.25$1.00$6.25$25.00
130Drain inlet cleaning (764-7001)EACH1,000$32.00$32.00$32.00$75.00
131Replace rail element (W-beam) (770-7001)LF10,000$15.00$10.00$18.00$15.00
132Replace rail element (thrie-beam) (770-7002)LF50$1.00$1.00$16.80$100.00
133Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH50$1.00$1.00$50.00$500.00
134Replace timber post W/O concrete FND (770-7006)EACH450$50.00$32.00$40.00$100.00
135Replace steel post W/O concrete FND (770-7007)EACH200$30.00$32.00$110.07$125.00
136Replace timber post W/ concrete FND (770-7008)EACH300$80.00$75.00$110.00$125.00
137Replace steel post W/ concrete FND (770-7009)EACH300$30.00$75.00$149.20$150.00
138Realign posts (770-7010)EACH200$10.00$10.00$8.00$100.00
139Rem obsolete get & repl W/ SGT (770-7013)EACH30$3,400.00$2,200.00$3,700.00$5,000.00
140Repl single gdrail terminal impact head (770-7015)EACH30$75.00$900.00$1,300.00$2,000.00
141Replace single gdrail terminal rail (770-7016)LF4,500$22.00$30.00$35.00$35.00
142Replace single gdrail terminal post (770-7017)EACH500$35.00$40.00$45.00$1.00
143Reset SGT impact head (770-7020)EACH30$75.00$75.00$275.00$1,000.00
144Replace SGT object marker (770-7021)EACH150$22.00$50.00$27.00$100.00
145Replace SGT cable assembly (770-7023)EACH100$100.00$100.00$155.00$200.00
146Replace SGT strut (770-7024)EACH40$120.00$120.00$100.00$200.00
147Raise rail (770-7025)LF2,000$12.00$5.00$16.67$20.00
148Replace downstream anchor terminal (770-7026)EACH5$630.00$1,800.00$1,611.75$4,000.00
149Replace single gdrail terminal post (wood) (770-7030)EACH350$35.00$35.00$139.39$100.00
150Replace single gdrail terminal post (steel) (770-7031)EACH150$35.00$35.00$186.29$150.00
151Remove (SMTC) narrow (774-7001)EACH20$2,500.00$0.10$397.03$5,000.00
152Replace (SMTC) narrow (774-7002)EACH20$26,000$26,000$28,000$25,000
153Repair (SMTC) narrow (774-7003)LF500$150.00$200.00$56.00$500.00
154Remove (SMTC) wide (774-7004)EACH20$1,000.00$0.10$397.03$5,000.00
155Replace (SMTC) wide (774-7005)EACH20$47,000$35,000$34,000$35,000
156Repair (SMTC) wide (774-7006)LF500$190.00$200.00$80.00$600.00
157Remove (react) wide (774-7016)EACH1$28,000$0.10$397.03$5,000.00
158Replace (react) wide (774-7017)EACH1$45,000$250.00$42,897$45,000
159Repair (react) wide (774-7018)LF100$45.00$100.00$165.07$350.00
160Repair (react)(N) (774-7069)LF100$25.50$100.00$514.27$350.00
161Repair (react)(N)(cylinder only) (774-7070)EACH15$2,000.00$1.00$2,100.00$2,000.00
162Repair (react)(W)(cylinder only) (774-7071)EACH15$2,500.00$1.00$3,000.00$2,000.00
163Snow and ice control (truck) (2001-7001)HR1,000$130.00$10.00$75.00$175.00
164Snow and ice control (shadow vehicle) (2001-7002)HR1,000$60.00$125.00$50.00$150.00
165Snow and ice control (loader) (2001-7003)HR50$80.00$1.00$75.00$500.00
166Snow and ice control (season) (2001-7004)MO4$50,000$40,000$75,000$100,000
167Snow and ice control (spray rig) (2001-7005)HR1,000$200.00$100.00$250.00$250.00
168Repair large RDSD sign supt & assem (6074-7001)EACH50$1,300.00$1,000.00$2,200.00$1,000.00
169Relocate large RDSD sign supt & assem (6074-7002)EACH50$120.00$25.75$2,200.00$1,000.00
170Replace large RDSD sign supt & assem (6074-7003)EACH50$875.00$500.00$4,000.00$6,000.00
171Remove large RDSD sign supt & assem (6074-7004)EACH10$300.00$250.00$500.00$1,000.00
172Repair small RDSD sign supt & assem (6076-7001)EACH1,000$142.90$300.00$500.00$75.00
173Relocate small RDSD sign supt & assem (6076-7002)EACH50$100.33$25.00$280.00$100.00
174Replace small RDSD sign supt & assem (6076-7003)EACH1,000$346.67$442.50$550.00$500.00
175Remove small RDSD sign supt & assem (6076-7004)EACH200$300.00$25.75$150.00$100.00
176Delineator/object marker cleaning (7034-7002)EACH5,000$12.00$2.50$1.76$50.00
177Reflectors/reflective tape tape install (7034-7003)EACH1,000$12.00$0.10$7.50$100.00
178Sign cleaning (7034-7004)EACH2,000$22.00$5.00$5.88$100.00
179Sign straightening (7034-7005)EACH250$18.00$300.00$17.65$350.00
180Brine solution(del)(site 1) (8002-7382)GAL1,000,000$0.50$0.20$0.18$0.50
TxDOT contract A00190666: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy