TxDOT contract A00184778 bid tabulation
Traffic Signal Improvements, SL 12 (At Peavy to In the City of Dallas). Let by Texas DOT on June 4, 2025, Dallas, Dallas District. 6 bids received; low bid $4,223,543 by WG Engineering & Construction, LLC, -0.7% against the engineer's estimate of $4,251,881.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 136
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | WG Engineering & Construction, LLC | $4,223,543 | Low | -1.0% |
| 2 | Durable Specialties, Inc. | $4,445,283 | +5.0% | +5.0% |
| 3 | Select Maintenance, L.L.C. | $4,531,907 | +7.0% | +7.0% |
| 4 | American Lighting and Signalization, LLC | $4,715,321 | +12% | +11% |
| 5 | O. Trevino Construction, LLC | $4,769,967 | +13% | +12% |
| 6 | Grey Sky Construction LLC | $5,584,124 | +32% | +31% |
Engineer's estimate: $4,251,881.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. WG Engineering & Construction, LLC | 2. Durable Specialties, Inc. | 3. Select Maintenance, L.L.C. | 4. American Lighting and Signalization, LLC | 5. O. Trevino Construction, LLC | 6. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 312 | $51.30 | $45.00 | $80.00 | $169.41 | $50.00 | $100.00 | |
| 2 | Removing concrete (medians) (104-7008) | SY | 185 | $90.00 | $76.90 | $70.00 | $80.00 | $208.28 | $100.00 | $100.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 42 | $64.10 | $60.00 | $250.00 | $227.35 | $50.00 | $100.00 | |
| 4 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 73 | $80.00 | $64.10 | $60.00 | $60.00 | $229.37 | $75.00 | $100.00 |
| 5 | Removing concrete (curb) (104-7016) | LF | 374 | $38.50 | $35.00 | $40.00 | $23.45 | $7.00 | $100.00 | |
| 6 | Excavation (roadway) (110-7001) | CY | 158 | $150.00 | $128.10 | $120.00 | $250.00 | $267.00 | $60.00 | $100.00 |
| 7 | Embankment (final)(OC)(type A) (132-7001) | CY | 24 | $128.10 | $120.00 | $250.00 | $2,167.66 | $115.00 | $100.00 | |
| 8 | Block sodding (162-7002) | SY | 447 | $50.00 | $23.90 | $40.00 | $20.00 | $188.31 | $12.00 | $10.00 |
| 9 | Vegetative watering (168-7001) | TGL | 10.75 | $500.00 | $3,320.30 | $100.00 | $500.00 | $137.86 | $450.00 | $50.00 |
| 10 | Rework BS metal (type C)(10")(ord comp) (251-7045) | STA | 403 | $150.00 | $128.10 | $120.00 | $35.00 | $122.40 | $65.00 | $695.00 |
| 11 | Concrete pavement (CRCP) (11") (360-7005) | SY | 403 | $400.00 | $281.70 | $260.00 | $250.00 | $322.31 | $250.00 | $200.00 |
| 12 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 48 | $600.00 | $615.50 | $715.00 | $400.00 | $535.75 | $770.00 | $450.00 |
| 13 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 44 | $683.70 | $790.00 | $400.00 | $630.30 | $850.00 | $500.00 | |
| 14 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 156 | $700.00 | $801.20 | $815.00 | $600.00 | $670.77 | $990.00 | $550.00 |
| 15 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 132 | $1,000.00 | $1,090.80 | $985.00 | $750.00 | $821.28 | $1,345.00 | $650.00 |
| 16 | Riprap (concrete)(4 in) (432-7001) | CY | 14.50 | $1,000.00 | $2,383.50 | $2,100.00 | $2,200.00 | $1,175.29 | $1,800.00 | $650.00 |
| 17 | Mobilization (500-7001) | LS | 1 | $325,000 | $476,549 | $285,000 | $460,000 | $386,898 | $450,000 | $500,000 |
| 18 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $10,000 | $14,894 | $12,000 | $36,250 | $5,740.59 | $33,000 | $25,000 |
| 19 | Portable changeable message sign (503-7001) | DAY | 12 | $175.00 | $128.10 | $85.00 | $500.00 | $60.00 | $250.00 | $150.00 |
| 20 | TMA (stationary) (505-7001) | DAY | 240 | $250.00 | $281.70 | $750.00 | $200.00 | $284.00 | $175.00 | $250.00 |
| 21 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 300 | $9.00 | $12.90 | $2.00 | $5.00 | $9.78 | $8.00 | $18.00 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 300 | $5.00 | $9.00 | $1.00 | $1.00 | $6.36 | $5.00 | $9.00 |
| 23 | Concrete curb (type II) (529-7002) | LF | 546 | $60.00 | $76.90 | $70.00 | $35.00 | $34.64 | $38.00 | $80.00 |
| 24 | Concrete curb & gutter (type II) (529-7009) | LF | 1,331 | $90.00 | $83.30 | $75.00 | $65.00 | $62.74 | $60.00 | $80.00 |
| 25 | Concrete sidewalks (6") (531-7003) | SY | 610 | $200.00 | $192.10 | $180.00 | $200.00 | $210.71 | $225.00 | $85.00 |
| 26 | Curb ramps (type 1) (531-7005) | EACH | 8 | $6,144.10 | $5,700.00 | $3,000.00 | $6,237.81 | $2,300.00 | $3,850.00 | |
| 27 | Curb ramps (type 2) (531-7006) | EACH | 4 | $4,500.00 | $6,400.10 | $6,000.00 | $3,000.00 | $6,899.68 | $3,100.00 | $3,850.00 |
| 28 | Curb ramps (type 3) (531-7007) | EACH | 15 | $6,016.10 | $5,600.00 | $2,600.00 | $5,310.51 | $2,600.00 | $3,850.00 | |
| 29 | Curb ramps (type 5) (531-7008) | EACH | 1 | $6,400.10 | $6,000.00 | $3,200.00 | $12,500 | $5,700.00 | $3,850.00 | |
| 30 | Curb ramps (type 7) (531-7010) | EACH | 16 | $5,000.00 | $6,016.10 | $5,600.00 | $3,000.00 | $4,480.19 | $2,400.00 | $3,850.00 |
| 31 | Curb ramps (type 10) (531-7011) | EACH | 1 | $6,400.10 | $6,000.00 | $4,000.00 | $7,318.08 | $3,400.00 | $3,850.00 | |
| 32 | Curb ramps (type 20) (531-7012) | EACH | 1 | $7,680.10 | $7,200.00 | $3,600.00 | $7,318.08 | $5,000.00 | $3,850.00 | |
| 33 | Curb ramps (type 21) (531-7013) | EACH | 4 | $7,680.10 | $7,200.00 | $5,600.00 | $9,353.64 | $4,000.00 | $3,850.00 | |
| 34 | Curb ramps (type 22) (531-7014) | EACH | 1 | $7,680.10 | $7,200.00 | $5,000.00 | $9,251.90 | $6,900.00 | $3,850.00 | |
| 35 | Curb ramps (type 5) (531-7018) | SY | 55 | $350.00 | $384.10 | $340.00 | $250.00 | $686.72 | $300.00 | $3,850.00 |
| 36 | Concrete median (mono nose) (536-7006) | SY | 53 | $350.00 | $256.10 | $240.00 | $250.00 | $436.67 | $570.00 | $250.00 |
| 37 | Remove RD IL asm (shoe-base) (610-7007) | EACH | 1 | $1,075.30 | $1,000.00 | $1,500.00 | $3,357.24 | $1,350.00 | $1,500.00 | |
| 38 | Remove RD IL asm (trans-base) (610-7009) | EACH | 1 | $1,433.70 | $1,000.00 | $1,500.00 | $3,357.24 | $1,800.00 | $1,500.00 | |
| 39 | In RD IL (type SA) 20T-4 (150W EQ) LED (610-7034) | EACH | 2 | $4,659.30 | $5,600.00 | $5,000.00 | $5,860.04 | $5,800.00 | $12,500 | |
| 40 | In RD IL (type SA) 30T-8 (250W EQ) LED (610-7072) | EACH | 3 | $7,500.00 | $4,787.30 | $6,500.00 | $5,000.00 | $5,909.16 | $6,000.00 | $12,500 |
| 41 | In RD IL (type SA) 30T-8-8 (250W EQ) LED (610-7073) | EACH | 1 | $6,694.50 | $6,800.00 | $5,500.00 | $8,326.67 | $8,300.00 | $15,000 | |
| 42 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 970 | $28.00 | $20.90 | $36.00 | $24.00 | $29.27 | $26.00 | $30.00 |
| 43 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 1,145 | $33.00 | $24.00 | $39.00 | $24.00 | $37.27 | $30.00 | $45.00 |
| 44 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 3,805 | $40.00 | $34.00 | $72.00 | $36.00 | $48.63 | $42.00 | $65.00 |
| 45 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 475 | $38.00 | $29.80 | $42.00 | $24.00 | $38.00 | $37.00 | $60.00 |
| 46 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 2,440 | $49.00 | $40.00 | $75.00 | $40.00 | $56.87 | $50.00 | $75.00 |
| 47 | Electrical conductor (no.14) insulated (620-7002) | LF | 1,445 | $2.50 | $1.90 | $2.00 | $1.50 | $2.62 | $2.50 | $3.00 |
| 48 | Electrical conductor (no.12) insulated (620-7004) | LF | 1,695 | $2.50 | $2.00 | $2.00 | $1.50 | $2.65 | $2.50 | $3.00 |
| 49 | Electrical conductor (no.6) bare (620-7009) | LF | 7,375 | $3.00 | $2.80 | $4.00 | $2.25 | $3.60 | $3.50 | $3.00 |
| 50 | Electrical conductor (no.6) insulated (620-7010) | LF | 5,770 | $4.00 | $2.80 | $4.00 | $2.50 | $4.32 | $3.50 | $3.00 |
| 51 | ITS GND box (poly) type 1 (243624)W/aprn (623-7014) | EACH | 6 | $4,000.00 | $4,569.70 | $7,500.00 | $3,500.00 | $4,637.09 | $5,800.00 | $2,500.00 |
| 52 | Ground box type A (122311) (624-7001) | EACH | 6 | $1,700.00 | $1,446.50 | $1,940.00 | $2,200.00 | $1,596.78 | $2,000.00 | $1,500.00 |
| 53 | Ground box type A (122311)W/apron (624-7002) | EACH | 8 | $2,000.00 | $1,907.30 | $2,660.00 | $2,500.00 | $1,843.69 | $2,400.00 | $1,650.00 |
| 54 | Ground box type D (162922) (624-7007) | EACH | 12 | $2,100.00 | $1,446.50 | $2,100.00 | $2,200.00 | $2,032.35 | $2,000.00 | $1,650.00 |
| 55 | Ground box type D (162922)W/apron (624-7008) | EACH | 24 | $2,300.00 | $1,907.30 | $2,800.00 | $2,500.00 | $2,300.00 | $2,400.00 | $1,850.00 |
| 56 | Remove ground box (624-7013) | EACH | 32 | $600.00 | $268.90 | $450.00 | $250.00 | $614.37 | $350.00 | $150.00 |
| 57 | Elc SRV type D 120/240 100(NS)SS(E)PS(U) (628-7246) | EACH | 5 | $10,500 | $9,984.10 | $12,000 | $26,000 | $10,702 | $15,000 | $12,500 |
| 58 | Aluminum signs (type A) (636-7001) | SF | 371 | $70.00 | $35.40 | $80.00 | $70.00 | $91.18 | $50.00 | $50.00 |
| 59 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 3 | $1,048.40 | $1,500.00 | $1,500.00 | $1,338.77 | $1,000.00 | $1,500.00 | |
| 60 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $1,200.00 | $1,158.50 | $1,500.00 | $1,500.00 | $1,061.14 | $1,100.00 | $1,600.00 |
| 61 | Remove SM RD SN sup&AM (644-7073) | EACH | 3 | $179.30 | $450.00 | $500.00 | $982.31 | $250.00 | $500.00 | |
| 62 | Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003) | LF | 112 | $3.90 | $0.85 | $2.00 | $6.00 | $2.50 | $10.00 | |
| 63 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,641 | $5.00 | $2.00 | $2.00 | $1.75 | $8.00 | $2.00 | $20.00 |
| 64 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 4,453 | $13.00 | $10.30 | $8.00 | $8.00 | $14.19 | $9.00 | $20.00 |
| 65 | Pavement sler 4" (666-7346) | LF | 4,419 | $0.70 | $0.10 | $0.25 | $1.09 | $0.30 | $5.00 | |
| 66 | Pavement sler 6" (666-7347) | LF | 11,246 | $1.00 | $0.80 | $0.20 | $0.27 | $1.25 | $0.35 | $6.00 |
| 67 | Pavement sler 8" (666-7348) | LF | 2,641 | $1.50 | $1.30 | $0.25 | $0.30 | $1.69 | $0.35 | $8.00 |
| 68 | Pavement sler 24" (666-7352) | LF | 4,408 | $3.00 | $2.60 | $2.50 | $0.75 | $3.51 | $0.90 | $10.00 |
| 69 | Pavement sler (arrow) (666-7353) | EACH | 36 | $75.00 | $89.70 | $18.00 | $25.00 | $131.97 | $27.00 | $250.00 |
| 70 | Pavement sler (word) (666-7354) | EACH | 6 | $75.00 | $102.50 | $24.00 | $25.00 | $308.87 | $27.00 | $250.00 |
| 71 | Pavement sler (double arrow) (666-7356) | EACH | 6 | $121.70 | $30.00 | $30.00 | $341.07 | $33.00 | $500.00 | |
| 72 | Reflectorized pavement marking type I (W)4"(broken)(100MIL) (666-7402) | LF | 1,150 | $6.50 | $1.00 | $2.00 | $3.12 | $2.25 | $2.00 | |
| 73 | Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405) | LF | 752 | $1.70 | $1.00 | $1.50 | $3.63 | $1.75 | $2.00 | |
| 74 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,440 | $3.50 | $6.50 | $1.00 | $2.00 | $3.38 | $2.25 | $6.00 |
| 75 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 6,341 | $3.50 | $2.00 | $1.00 | $1.55 | $3.69 | $2.00 | $6.00 |
| 76 | Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417) | LF | 2,400 | $1.70 | $1.00 | $2.00 | $2.46 | $2.25 | $2.00 | |
| 77 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 3,468 | $3.50 | $2.00 | $1.00 | $1.75 | $2.78 | $2.00 | $6.00 |
| 78 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 36 | $350.00 | $249.70 | $270.00 | $275.00 | $397.59 | $325.00 | $250.00 |
| 79 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 6 | $505.70 | $540.00 | $375.00 | $848.17 | $425.00 | $500.00 | |
| 80 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 6 | $450.00 | $326.50 | $275.00 | $325.00 | $630.84 | $375.00 | $250.00 |
| 81 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 55 | $15.00 | $12.90 | $5.00 | $5.00 | $33.62 | $5.50 | $6.00 |
| 82 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,119 | $12.00 | $9.00 | $5.00 | $5.00 | $11.60 | $5.50 | $6.00 |
| 83 | Eliminating existing PM & markers (4") (677-7001) | LF | 9,860 | $1.00 | $1.30 | $1.00 | $1.00 | $1.58 | $1.10 | $1.00 |
| 84 | Eliminating existing PM & markers (6") (677-7002) | LF | 2,607 | $1.30 | $1.00 | $1.00 | $1.94 | $1.10 | $2.00 | |
| 85 | Eliminating existing PM & markers (8") (677-7004) | LF | 2,577 | $2.00 | $2.60 | $2.00 | $1.10 | $2.10 | $1.25 | $6.00 |
| 86 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,124 | $3.00 | $3.90 | $3.00 | $2.25 | $4.35 | $2.50 | $10.00 |
| 87 | Eliminating existing PM & markers (24") (677-7008) | LF | 2,833 | $6.00 | $7.70 | $5.00 | $3.00 | $6.08 | $3.50 | $20.00 |
| 88 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 29 | $90.00 | $128.10 | $54.00 | $75.00 | $172.71 | $85.00 | $250.00 |
| 89 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 5 | $185.70 | $96.00 | $80.00 | $496.21 | $90.00 | $500.00 | |
| 90 | Eliminating existing PM & markers (word) (677-7015) | EACH | 6 | $150.00 | $153.70 | $60.00 | $75.00 | $341.07 | $85.00 | $250.00 |
| 91 | Pavement surface preparation for marking (4") (678-7001) | LF | 4,414 | $0.80 | $0.10 | $0.20 | $0.37 | $0.25 | $1.00 | |
| 92 | Pavement surface preparation for marking (6") (678-7002) | LF | 11,249 | $1.00 | $0.70 | $0.10 | $0.20 | $0.45 | $0.25 | $2.00 |
| 93 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,641 | $1.50 | $0.70 | $0.10 | $0.21 | $0.64 | $0.25 | $6.00 |
| 94 | Pavement surface preparation for marking (24") (678-7008) | LF | 4,408 | $2.50 | $2.60 | $1.00 | $0.50 | $1.09 | $0.75 | $10.00 |
| 95 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 36 | $50.00 | $83.30 | $12.00 | $15.00 | $83.68 | $20.00 | $250.00 |
| 96 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 6 | $102.50 | $24.00 | $18.00 | $260.57 | $20.00 | $500.00 | |
| 97 | Pavement surface preparation for marking (word) (678-7016) | EACH | 6 | $50.00 | $96.10 | $18.00 | $15.00 | $260.57 | $20.00 | $250.00 |
| 98 | Removing traffic signals (680-7004) | EACH | 6 | $20,000 | $8,960.10 | $7,000.00 | $35,000 | $25,000 | $25,000 | $10,000 |
| 99 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 6 | $50,000 | $52,353 | $35,000 | $95,000 | $48,000 | $75,000 | $50,000 |
| 100 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 75 | $400.00 | $435.30 | $775.00 | $400.00 | $522.38 | $550.00 | $385.00 |
| 101 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 18 | $400.00 | $435.30 | $775.00 | $400.00 | $576.16 | $550.00 | $385.00 |
| 102 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 75 | $400.00 | $435.30 | $775.00 | $400.00 | $522.38 | $550.00 | $385.00 |
| 103 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 26 | $400.00 | $435.30 | $775.00 | $400.00 | $554.39 | $550.00 | $385.00 |
| 104 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 75 | $400.00 | $435.30 | $775.00 | $400.00 | $522.38 | $550.00 | $385.00 |
| 105 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 28 | $400.00 | $435.30 | $775.00 | $400.00 | $550.89 | $550.00 | $385.00 |
| 106 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 50 | $1,000.00 | $755.30 | $1,450.00 | $1,500.00 | $788.67 | $950.00 | $4,500.00 |
| 107 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 71 | $250.00 | $217.70 | $305.00 | $400.00 | $270.38 | $300.00 | $350.00 |
| 108 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 6 | $300.00 | $275.30 | $320.00 | $400.00 | $350.00 | $340.00 | $350.00 |
| 109 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 12 | $350.00 | $288.10 | $330.00 | $400.00 | $425.00 | $360.00 | $360.00 |
| 110 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 3,054 | $4.00 | $3.00 | $3.00 | $3.50 | $6.85 | $4.00 | $3.00 |
| 111 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 1,128 | $4.00 | $3.40 | $3.00 | $3.50 | $10.50 | $4.50 | $3.00 |
| 112 | Traffic signal CBL (type A)(14 AWG)(12 conductor) (684-7038) | LF | 4,565 | $7.00 | $4.40 | $6.00 | $6.50 | $11.00 | $6.00 | $3.00 |
| 113 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 3,150 | $11.00 | $8.10 | $8.00 | $6.50 | $13.00 | $11.00 | $3.00 |
| 114 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 7,330 | $4.00 | $2.50 | $3.00 | $3.00 | $10.27 | $3.50 | $3.00 |
| 115 | Ins traffic signal PL AM (S)1 arm(28') (686-7029) | EACH | 3 | $15,104 | $11,900 | $15,000 | $15,750 | $19,000 | $16,500 | |
| 116 | Ins traffic signal PL AM(S)1 arm(28')lum (686-7031) | EACH | 1 | $16,768 | $14,200 | $16,000 | $18,777 | $21,000 | $17,000 | |
| 117 | Ins traffic signal PL AM(S)1 arm(36') (686-7037) | EACH | 1 | $17,000 | $16,768 | $14,300 | $16,000 | $18,777 | $21,000 | $18,000 |
| 118 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 1 | $18,560 | $16,100 | $18,000 | $20,781 | $23,000 | $20,000 | |
| 119 | Ins traffic signal PL AM(S)1 arm(40') (686-7041) | EACH | 1 | $17,536 | $15,200 | $18,000 | $19,648 | $22,000 | $25,000 | |
| 120 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 1 | $18,048 | $15,700 | $19,000 | $20,084 | $23,000 | $26,000 | |
| 121 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $19,840 | $17,100 | $20,000 | $22,262 | $25,000 | $30,000 | |
| 122 | Ins traffic signal PL AM(S)1 arm(48') (686-7049) | EACH | 1 | $18,432 | $16,900 | $20,000 | $22,443 | $23,000 | $35,000 | |
| 123 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 6 | $25,000 | $20,608 | $18,100 | $21,000 | $24,000 | $26,000 | $36,000 |
| 124 | Ins traffic signal PL AM(S)1 arm(55') (686-7057) | EACH | 1 | $35,226 | $45,800 | $32,000 | $50,011 | $45,000 | $38,000 | |
| 125 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $38,426 | $49,100 | $35,000 | $53,496 | $48,000 | $45,000 | |
| 126 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 1 | $39,450 | $49,900 | $36,000 | $54,367 | $50,000 | $48,000 | |
| 127 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 2 | $46,000 | $40,346 | $52,450 | $36,500 | $56,000 | $51,000 | $50,000 |
| 128 | Ins traffic signal PL AM(S)2 arm(60-44') (686-7249) | EACH | 1 | $44,724 | $56,350 | $42,000 | $62,209 | $56,000 | $50,000 | |
| 129 | Pedestrian pole assembly (687-7001) | EACH | 26 | $3,000.00 | $4,006.50 | $6,500.00 | $2,000.00 | $1,886.74 | $5,000.00 | $4,500.00 |
| 130 | Pedestrian push button pole (687-7002) | EACH | 1 | $3,814.50 | $5,300.00 | $3,500.00 | $1,500.00 | $4,800.00 | $6,500.00 | |
| 131 | Pedestrian detect push button (APS) (688-7001) | EACH | 51 | $1,000.00 | $1,255.70 | $1,450.00 | $1,500.00 | $1,400.00 | $1,800.00 | $1,850.00 |
| 132 | Pedestrian detector controller unit (688-7003) | EACH | 7 | $5,000.00 | $4,999.80 | $7,000.00 | $8,000.00 | $7,321.47 | $6,200.00 | $6,500.00 |
| 133 | Removal of timber poles (690-7021) | EACH | 2 | $1,075.30 | $1,000.00 | $1,500.00 | $1,709.23 | $1,500.00 | $1,500.00 | |
| 134 | Spot tree trimming / brush removal (752-7002) | LF | 70 | $44.90 | $20.00 | $150.00 | $165.00 | $35.00 | $100.00 | |
| 135 | RVDS (presence det)(install only) (6008-7004) | EACH | 9 | $2,100.00 | $1,948.50 | $2,100.00 | $1,200.00 | $1,783.68 | $2,500.00 | $5,000.00 |
| 136 | RVDS (pres and adv)(install only) (6008-7006) | EACH | 14 | $2,100.00 | $1,942.90 | $2,100.00 | $1,200.00 | $1,733.14 | $2,500.00 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.