TTG Utilities, LP: TxDOT bid record

TTG Utilities, LP submitted 10 bids on Texas DOT contracts in the data, from 09 APR 2020 to 06 NOV 2025, and was the low bidder on 3 of them (30%). When it was not low, its total sat a median +15% above the low bid.

Owner
Texas DOT
Low bid volume
$11,857,046
Latest bid
06 NOV 2025
Data through
19 NOV 2026
10Bids
3Low bids
30Win rate, percent
+15%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
20204250%
2021200%
20254125%
TTG Utilities, LP, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Waco District8338%
Austin District100%
Atlanta District100%
TTG Utilities, LP, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Concrete curb & gutter (type II)529-7009LF54 (80%)$30.00$42.58
Barricades, signs and traffic handling502-7001MO102 (20%)$4,475.00$5,000.00
Temporary sediment control fence (remove)506-7041LF92 (22%)$2.00$1.00
Preparing row100-7002STA62 (33%)$500.00$2,750.00
Excavation (roadway)110-7001CY62 (33%)$16.00$20.00
Temporary sediment control fence (install)506-7039LF91 (11%)$5.00$4.00
Removing structure (pipe)496-7007LF61 (17%)$30.00$24.00
Remove SM RD SN sup&AM644-7073EACH51 (20%)$136.00$110.00
RC pipe (CL III)(24 in)464-7005LF51 (20%)$133.00$108.13
TMA (mobile operation)505-7002HR51 (20%)$85.00$78.00
TTG Utilities, LP, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

TTG Utilities, LP, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 NOV 2025A00206360Waco DistrictConstruct Pedestrian Infrastructure, FM 436 (Lamar St to SH 95)5 of 7$2,197,197+3.0%
05 NOV 2025A00206364Waco DistrictConstruct Pedestrian Infrastructure, Various (FM 2483 City Limits to Morgan's Pt Rd to Morgan's Pt Rd from FM 2483 to Sobrante)7 of 11$3,034,034+23%
04 JUN 2025A00201726Waco DistrictReconstruct Existing Roadway, 704540 (Clear Creek Rd to West Range Rd)1 of 4$4,647,464Low, 17% under the second
06 FEB 2025A00134101Waco DistrictReconstruct Existing Roadway, FM 1829 (US 84 to FM 107)4 of 6$5,498,498+15%
04 AUG 202108213063Atlanta DistrictVA Plant wildflowers on right of way from VARIOUS LOCATIONS to VARIOUS LOCATIONS5 of 6$181,636+54%
04 FEB 202102213011Austin DistrictFM 971 Adding shoulders with no added capacity from SH 130 to 6.704 MILES EAST OF SH 1309 of 13$10,196,622+21%
04 SEP 202009203206Waco DistrictBU 190E Widen pavement, construct raised median from FM 1113(AVENUE D) to CONSTITUTION DRIVE1 of 5$4,762,517Low, 13% under the second
05 AUG 202008203063Waco DistrictSH 6 Safety treat fixed objects from HAMILTON COUNTY LINE to FM 12382 of 4$323,890+10%
08 MAY 202005203228Waco DistrictFM 1741 Construct sidewalk and pedestrian bridge from WEST AVENUE A to PALERMO PARKWAY1 of 8$2,447,065Low, 8.0% under the second
09 APR 202004203230Waco DistrictFM 1695 Construction of pedestrian, sidewalks & curb ramp from MARS DR. to PANTHER WY, ETC.5 of 9$960,918+11%
TTG Utilities, LP: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy