TxDOT contract A00194689 bid tabulation
Widen Road - Add Shoulders, FM 373 (Dry Elm Creek to CR 485). Let by Texas DOT on June 4, 2025, Cooke, Wichita Falls District. 6 bids received; low bid $7,282,548 by Jagoe-Public Company, -3.5% against the engineer's estimate of $7,545,120.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 83
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jagoe-Public Company | $7,282,548 | Low | -3.0% |
| 2 | Eurovia Atlantic Coast LLC | $7,436,891 | +2.0% | -1.0% |
| 3 | Foutsco Paving Company, LLC | $7,738,068 | +6.0% | +3.0% |
| 4 | A. L. Helmcamp, Inc. | $8,117,649 | +11% | +8.0% |
| 5 | Overland Corporation | $9,194,052 | +26% | +22% |
| 6 | Austin Bridge & Road Services, LP | $9,214,639 | +27% | +22% |
Engineer's estimate: $7,545,120.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jagoe-Public Company | 2. Eurovia Atlantic Coast LLC | 3. Foutsco Paving Company, LLC | 4. A. L. Helmcamp, Inc. | 5. Overland Corporation | 6. Austin Bridge & Road Services, LP |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Excavation (roadway) (110-7001) | CY | 8,000 | $28.00 | $40.00 | $30.00 | $8.00 | $55.00 | $57.25 | $29.89 |
| 2 | Embankment (final)(DC)(type B) (132-7004) | CY | 7,754 | $65.00 | $30.00 | $41.00 | $15.00 | $65.00 | $45.00 | $40.00 |
| 3 | Drill seed (permanent_rural_clay) (164-7010) | SY | 88,571 | $0.12 | $0.25 | $0.14 | $0.14 | $0.14 | $0.14 | $0.20 |
| 4 | Drill seed (temporary_warm) (164-7013) | SY | 44,286 | $0.20 | $0.15 | $0.14 | $0.01 | $0.14 | $0.14 | $0.16 |
| 5 | Drill seed (temporary_cool) (164-7014) | SY | 44,286 | $0.20 | $0.15 | $0.14 | $0.01 | $0.14 | $0.14 | $0.16 |
| 6 | Vegetative watering (168-7001) | TGL | 740 | $25.00 | $55.00 | $55.00 | $0.01 | $20.00 | $74.34 | $51.00 |
| 7 | Cement (275-7001) | TON | 580 | $280.00 | $350.00 | $250.00 | $235.00 | $240.00 | $300.00 | $220.00 |
| 8 | Cement TRT (existing material)(8") (275-7003) | SY | 40,226 | $6.70 | $3.75 | $4.40 | $4.50 | $6.00 | $12.00 | $9.98 |
| 9 | Emuls asphalt (erosion control)(MS-2) (314-7012) | GAL | 11,088 | $3.50 | $2.00 | $4.00 | $0.01 | $5.00 | $3.24 | $5.19 |
| 10 | D-GR HMA type-B sac-B PG64-22 (341-7002) | TON | 7,925 | $112.00 | $100.00 | $113.00 | $145.00 | $123.00 | $133.00 | $145.26 |
| 11 | D-GR HMA type-C sac-B PG70-28 (341-7028) | TON | 15,898 | $125.00 | $120.00 | $131.00 | $150.00 | $125.00 | $143.50 | $152.49 |
| 12 | D-GR HMA type-C PG70-28 (level-UP) (341-7029) | TON | 3,478 | $125.00 | $125.00 | $132.50 | $140.00 | $141.00 | $205.00 | $168.70 |
| 13 | Tack coat (341-7082) | GAL | 10,431 | $4.90 | $3.00 | $3.00 | $6.50 | $5.50 | $3.66 | $4.00 |
| 14 | Flexible pavement structure repair(8") (351-7007) | SY | 13,574 | $60.00 | $60.00 | $61.00 | $71.90 | $83.00 | $82.75 | $90.65 |
| 15 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 6,468 | $10.00 | $3.25 | $4.25 | $4.00 | $3.00 | $4.99 | $6.49 |
| 16 | Cut & restoring pavement (400-7006) | SY | 220 | $60.00 | $124.00 | $80.00 | $70.00 | $194.94 | $112.53 | |
| 17 | Cem stabil BKFL (400-7010) | CY | 136 | $450.00 | $325.00 | $250.00 | $260.00 | $445.16 | $325.00 | |
| 18 | Flowable backfill (401-7001) | CY | 20 | $200.00 | $450.00 | $420.00 | $260.00 | $445.16 | $450.00 | |
| 19 | Trench excavation protection (402-7001) | LF | 95 | $30.00 | $1.00 | $10.00 | $16.00 | $20.00 | $1.00 | |
| 20 | Temporary special shoring (403-7001) | SF | 2,473 | $24.00 | $5.00 | $40.00 | $29.00 | $36.00 | $39.45 | $45.00 |
| 21 | Class A concrete (plug) (420-7009) | EACH | 2 | $2,500.00 | $2,000.00 | $2,000.00 | $2,100.00 | $2,000.00 | $2,000.00 | |
| 22 | Riprap (mow strip)(4 in) (432-7013) | CY | 72 | $715.00 | $900.00 | $815.00 | $700.00 | $700.00 | $650.00 | $700.00 |
| 23 | Riprap (stone protection)(12 in) (432-7041) | CY | 19 | $500.00 | $700.00 | $400.00 | $250.00 | $246.87 | $400.00 | |
| 24 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 168 | $76.00 | $50.00 | $45.00 | $55.00 | $85.00 | $75.00 | $45.00 |
| 25 | Retrofit rail (type T131RC) (451-7049) | LF | 240 | $245.00 | $275.00 | $265.00 | $210.00 | $220.00 | $240.00 | $200.00 |
| 26 | CMP (gal steel 18 in) (460-7003) | LF | 321 | $84.00 | $100.00 | $59.00 | $85.00 | $110.00 | $213.63 | $59.00 |
| 27 | Concrete box culvert (8 FT X 5 FT) (462-7022) | LF | 16 | $900.00 | $1,500.00 | $1,725.00 | $1,150.00 | $1,700.00 | $1,150.00 | $1,725.00 |
| 28 | RC pipe (CL III)(18 in) (464-7003) | LF | 51 | $90.00 | $135.00 | $90.00 | $90.00 | $74.00 | $94.87 | $90.00 |
| 29 | RC pipe (CL III)(24 in) (464-7005) | LF | 50 | $150.00 | $100.00 | $100.00 | $108.00 | $131.29 | $100.00 | |
| 30 | RC pipe (CL III)(42 in) (464-7010) | LF | 6 | $240.00 | $275.00 | $500.00 | $500.00 | $190.00 | $241.00 | $500.00 |
| 31 | RC pipe (CL III)(48 in) (464-7011) | LF | 130 | $300.00 | $425.00 | $283.00 | $365.00 | $293.56 | $425.00 | |
| 32 | Headwall (CH - FW - 45) (diameter= 48 in) (466-7056) | EACH | 1 | $25,000 | $19,000 | $20,000 | $15,000 | $7,150.00 | $19,000 | |
| 33 | Headwall (CH - PW - 0) (diameter= 42 in) (466-7106) | EACH | 2 | $13,750 | $21,000 | $20,000 | $15,000 | $15,500 | $12,200 | $20,000 |
| 34 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 1 | $25,000 | $25,000 | $17,000 | $18,500 | $16,090 | $25,000 | |
| 35 | Wingwall (PW - 2) (HW=6 FT) (466-7190) | EACH | 2 | $44,000 | $30,000 | $19,800 | $25,000 | $26,000 | $21,600 | $19,800 |
| 36 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 22 | $1,400.00 | $1,700.00 | $1,100.00 | $1,800.00 | $1,400.00 | $1,722.00 | $1,100.00 |
| 37 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 4 | $1,600.00 | $1,600.00 | $1,100.00 | $1,800.00 | $1,400.00 | $1,500.00 | $1,100.00 |
| 38 | Set (type II) (24 in) (CMP) (4: 1) (C) (467-7322) | EACH | 1 | $3,000.00 | $2,000.00 | $1,150.00 | $2,000.00 | $1,400.00 | $2,250.00 | $1,150.00 |
| 39 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,200.00 | $1,340.00 | $2,500.00 | $1,700.00 | $2,250.00 | $1,340.00 | |
| 40 | Removing structure (set) (496-7004) | EACH | 4 | $400.00 | $750.00 | $300.00 | $750.00 | $1,100.00 | $852.68 | $300.00 |
| 41 | Removing structure (wingwall) (496-7005) | EACH | 2 | $1,000.00 | $3,400.00 | $1,500.00 | $1,500.00 | $16,000 | $2,187.37 | $1,500.00 |
| 42 | Removing structure (headwall) (496-7006) | EACH | 1 | $2,000.00 | $1,500.00 | $1,500.00 | $1,100.00 | $2,582.06 | $1,500.00 | |
| 43 | Removing structure (pipe) (496-7007) | LF | 718 | $15.00 | $24.00 | $12.00 | $22.00 | $21.00 | $48.91 | $12.00 |
| 44 | Mobilization (500-7001) | LS | 1 | $665,920 | $815,000 | $480,000 | $600,000 | $515,000 | $945,510 | $1,013,610 |
| 45 | Barricades, signs and traffic handling (502-7001) | MO | 22 | $10,000 | $12,500 | $16,000 | $20,000 | $10,000 | $4,000.00 | $17,391 |
| 46 | TMA (stationary) (505-7001) | DAY | 290 | $260.00 | $100.00 | $375.00 | $150.00 | $260.00 | $205.00 | $4.00 |
| 47 | TMA (mobile operation) (505-7003) | DAY | 40 | $260.00 | $100.00 | $975.00 | $50.00 | $130.00 | $275.00 | $25.00 |
| 48 | Rock filter dams (install) (type 2) (506-7002) | LF | 80 | $60.00 | $60.00 | $29.00 | $30.00 | $31.00 | $29.00 | $50.00 |
| 49 | Rock filter dams (remove) (506-7011) | LF | 80 | $15.00 | $20.00 | $22.00 | $10.00 | $16.00 | $93.21 | $18.00 |
| 50 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $2.00 | $5.00 | $3.00 | $3.00 | $3.20 | $3.00 | $5.00 |
| 51 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $0.50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 52 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 2,910 | $4.00 | $6.00 | $2.95 | $3.00 | $3.20 | $2.95 | $5.50 |
| 53 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,910 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.50 |
| 54 | Driveways (concrete) (530-7006) | SY | 217 | $98.00 | $130.00 | $146.00 | $95.00 | $145.00 | $120.00 | $152.32 |
| 55 | Driveways (ACP) (530-7010) | SY | 2,063 | $45.00 | $45.00 | $43.00 | $50.00 | $65.00 | $66.22 | $59.23 |
| 56 | Driveways (base) (530-7015) | SY | 4,005 | $30.00 | $18.00 | $25.00 | $40.00 | $40.00 | $28.16 | $24.95 |
| 57 | Turnouts (ACP) (530-7018) | SY | 66 | $90.00 | $45.00 | $105.00 | $100.00 | $65.00 | $544.46 | $149.92 |
| 58 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 91,640 | $0.14 | $0.15 | $0.25 | $0.15 | $0.23 | $0.17 | $0.06 |
| 59 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 45,820 | $0.24 | $0.20 | $0.29 | $0.15 | $0.23 | $0.17 | $0.06 |
| 60 | Metal W-beam guard fence (timber post) (540-7001) | LF | 275 | $30.00 | $35.00 | $34.20 | $28.00 | $24.00 | $28.22 | $23.25 |
| 61 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,100.00 | $3,500.00 | $2,210.00 | $1,800.00 | $1,800.00 | $1,981.00 | $1,750.00 |
| 62 | Remove metal beam guard fence (542-7001) | LF | 275 | $4.00 | $3.00 | $8.00 | $8.00 | $3.20 | $8.00 | $2.50 |
| 63 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,500.00 | $3,500.00 | $3,340.00 | $3,000.00 | $3,400.00 | $3,010.00 | $3,025.00 |
| 64 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $250.00 | $325.00 | $600.00 | $300.00 | $320.00 | $300.00 | $200.00 |
| 65 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 2 | $330.00 | $225.00 | $200.00 | $200.00 | $220.00 | $325.00 | $200.00 |
| 66 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $600.00 | $650.00 | $550.00 | $550.00 | $580.00 | $798.00 | $550.00 |
| 67 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 10 | $765.00 | $625.00 | $515.00 | $500.00 | $540.00 | $705.00 | $515.00 |
| 68 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 1 | $1,300.00 | $800.00 | $655.00 | $650.00 | $690.00 | $828.00 | $655.00 |
| 69 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 51 | $520.00 | $450.00 | $380.00 | $350.00 | $400.00 | $432.00 | $380.00 |
| 70 | Relocate SM RD SN sup&AM type TWT (644-7068) | EACH | 2 | $605.00 | $225.00 | $200.00 | $200.00 | $220.00 | $550.00 | $200.00 |
| 71 | Remove SM RD SN sup&AM (644-7073) | EACH | 53 | $110.00 | $120.00 | $100.00 | $100.00 | $110.00 | $105.00 | $100.00 |
| 72 | Relocate SM RD SN sup & AM type temporary (644-7077) | EACH | 2 | $150.00 | $230.00 | $1,000.00 | $200.00 | $250.00 | $370.00 | $400.00 |
| 73 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 11 | $120.00 | $60.00 | $50.00 | $50.00 | $55.00 | $100.00 | $50.00 |
| 74 | Remove delin & object marker assms (658-7078) | EACH | 3 | $20.00 | $18.00 | $15.00 | $15.00 | $16.00 | $65.00 | $15.00 |
| 75 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 5,562 | $1.50 | $2.25 | $1.75 | $0.01 | $0.75 | $2.86 | $2.14 |
| 76 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 91,861 | $0.57 | $0.75 | $0.63 | $0.55 | $0.59 | $0.57 | $0.57 |
| 77 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 5,573 | $0.65 | $0.85 | $0.70 | $0.59 | $0.61 | $0.59 | $0.59 |
| 78 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 66,953 | $0.70 | $0.75 | $0.63 | $0.55 | $0.59 | $0.57 | $0.57 |
| 79 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,137 | $4.65 | $5.00 | $4.45 | $4.00 | $4.10 | $3.88 | $3.88 |
| 80 | Spot tree trimming / brush removal (752-7002) | LF | 8,344 | $3.00 | $6.00 | $3.84 | $0.50 | $5.00 | $6.50 | $5.72 |
| 81 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 0.07 | $40,000 | $200,000 | $172,000 | $15,000 | $116,000 | $5,000.00 | $2,500.00 |
| 82 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 7 | $1,000.00 | $1,500.00 | $860.00 | $750.00 | $1,200.00 | $300.00 | $900.00 |
| 83 | Tree removal (18" - 24" diameter) (752-7007) | EACH | 7 | $3,500.00 | $2,300.00 | $1,075.00 | $1,500.00 | $1,800.00 | $600.00 | $1,868.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.