TxDOT contract A00059543 bid tabulation
Highway Improvement, SL 287 (BU 59-G to COPELAND STREET). Let by Texas DOT on June 4, 2025, Angelina, Lufkin District. 4 bids received; low bid $11,124,512 by Longview Bridge and Road, LTD., -16% against the engineer's estimate of $13,188,203.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 140
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Longview Bridge and Road, LTD. | $11,124,512 | Low | -16% |
| 2 | Texas Materials Group, Inc. | $11,886,780 | +7.0% | -10% |
| 3 | Drewery Construction Company, Incorporated | $12,101,916 | +9.0% | -8.0% |
| 4 | A. L. Helmcamp, Inc. | $13,582,047 | +22% | +3.0% |
Engineer's estimate: $13,188,203.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Longview Bridge and Road, LTD. | 2. Texas Materials Group, Inc. | 3. Drewery Construction Company, Incorporated | 4. A. L. Helmcamp, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 93 | $1,500.00 | $4,500.00 | $875.00 | $3,000.00 | $2,350.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 22 | $65.00 | $75.00 | $66.00 | $100.00 | $75.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 1,899 | $55.00 | $30.00 | $36.25 | $38.00 | $37.00 |
| 4 | Removing concrete (curb & gutter) (104-7017) | LF | 808 | $30.00 | $16.25 | $39.00 | $40.00 | $40.00 |
| 5 | Removing concrete (rail) (104-7036) | LF | 58 | $150.00 | $56.00 | $145.00 | $750.00 | $145.00 |
| 6 | Remove (4") TRT/untrt base & asphalt pavement (105-7024) | SY | 30 | $60.00 | $23.00 | $100.00 | $100.00 | $120.00 |
| 7 | Remove (14") TRT/untrt base & asphalt pavement (105-7034) | SY | 1,279 | $50.00 | $15.00 | $26.24 | $42.00 | $24.00 |
| 8 | Subgr widen (DC) (112-7002) | STA | 151 | $500.00 | $1,750.00 | $3,135.00 | $2,950.00 | $3,000.00 |
| 9 | Blading (150-7001) | STA | 86 | $350.00 | $300.00 | $743.00 | $625.00 | $290.00 |
| 10 | Spec excavation work (hyd excavator) (158-7002) | HR | 95 | $175.00 | $470.00 | $204.00 | $195.00 | $200.00 |
| 11 | Block sodding (162-7002) | SY | 601 | $10.00 | $5.00 | $5.50 | $7.25 | $5.50 |
| 12 | Roll sodding (162-7008) | SY | 36,188 | $10.00 | $5.00 | $5.45 | $6.00 | $5.50 |
| 13 | Broadcast seed (temporary_warm) (164-7005) | SY | 36,188 | $1.00 | $0.15 | $0.18 | $0.25 | $0.18 |
| 14 | Broadcast seed (temporary_cool) (164-7006) | SY | 36,188 | $1.00 | $0.15 | $0.17 | $0.25 | $0.18 |
| 15 | Vegetative watering (168-7001) | TGL | 2,183.90 | $20.00 | $20.00 | $10.00 | $10.00 | $40.00 |
| 16 | Cement (275-7001) | TON | 379 | $275.00 | $300.00 | $290.00 | $230.00 | $265.00 |
| 17 | Cement TRT (subgrade)(12") (275-7015) | SY | 24,032 | $6.00 | $5.50 | $8.10 | $7.75 | $14.00 |
| 18 | Prime coat (MC-30) (310-7004) | GAL | 4,816 | $8.00 | $6.50 | $14.15 | $4.00 | $7.50 |
| 19 | D-GR HMA type D PG 64-22 (exempt) (341-7064) | TON | 16 | $250.00 | $380.00 | $700.00 | $500.00 | $735.00 |
| 20 | SP mixes SP-B PG70-22 (344-7004) | TON | 15,340 | $195.00 | $170.00 | $165.25 | $165.00 | $165.25 |
| 21 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 11,174 | $185.00 | $180.00 | $177.42 | $175.00 | $177.42 |
| 22 | Flexible pavement structure repair(12") (351-7011) | SY | 580 | $250.00 | $200.00 | $179.14 | $215.00 | $179.14 |
| 23 | Planing asphalt concrete pavement(2") (354-7051) | SY | 78,873 | $5.00 | $2.75 | $3.43 | $4.00 | $3.50 |
| 24 | Cut & restoring pavement (400-7006) | SY | 157 | $200.00 | $230.00 | $265.00 | $252.00 | $260.00 |
| 25 | Flowable backfill (401-7001) | CY | 10 | $450.00 | $270.00 | $376.00 | $360.00 | $370.00 |
| 26 | Temporary special shoring (403-7001) | SF | 110 | $70.00 | $100.00 | $65.00 | $63.00 | $65.00 |
| 27 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 69 | $300.00 | $220.00 | $250.00 | $201.50 | $200.00 |
| 28 | Drilled shaft (sign mounts) (48 in) (416-7032) | LF | 91 | $600.00 | $900.00 | $1,652.00 | $450.00 | $900.00 |
| 29 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 140 | $300.00 | $270.00 | $350.00 | $202.00 | $270.00 |
| 30 | Class C concrete (collar) (420-7061) | EACH | 2 | $1,700.00 | $1,200.00 | $1,650.00 | $1,575.00 | $1,700.00 |
| 31 | Riprap (concrete)(4 in) (432-7001) | CY | 31.30 | $800.00 | $550.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 32 | Riprap (mow strip)(4 in) (432-7013) | CY | 102 | $800.00 | $675.00 | $825.00 | $787.50 | $850.00 |
| 33 | Riprap (stone common)(dry)(24 in) (432-7034) | CY | 38 | $300.00 | $305.00 | $295.00 | $300.00 | $290.00 |
| 34 | RC pipe (CL III)(18 in) (464-7003) | LF | 396 | $100.00 | $55.00 | $83.00 | $80.00 | $83.00 |
| 35 | RC pipe (CL III)(24 in) (464-7005) | LF | 92 | $175.00 | $107.00 | $120.00 | $113.50 | $119.00 |
| 36 | RC pipe (CL III)(30 in) (464-7007) | LF | 74 | $275.00 | $145.00 | $189.00 | $178.50 | $188.00 |
| 37 | RC pipe (CL III)(36 in) (464-7009) | LF | 16 | $365.00 | $260.00 | $220.00 | $210.00 | $220.00 |
| 38 | Junction box(complete)(PJB)(4FTX4FT) (465-7006) | EACH | 1 | $8,000.00 | $7,000.00 | $7,800.00 | $7,476.00 | $7,900.00 |
| 39 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 1 | $12,000 | $15,000 | $16,000 | $15,225 | $16,000 |
| 40 | Headwall (CH - PW - S) (diameter= 30 in) (466-7118) | EACH | 1 | $12,000 | $15,000 | $15,500 | $14,700 | $16,000 |
| 41 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 18 | $1,800.00 | $1,300.00 | $1,050.00 | $997.50 | $1,100.00 |
| 42 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,600.00 | $1,670.00 | $1,700.00 | $1,627.50 | $1,700.00 |
| 43 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 1 | $3,000.00 | $3,000.00 | $2,850.00 | $2,730.00 | $2,900.00 |
| 44 | Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365) | EACH | 1 | $2,500.00 | $3,050.00 | $2,850.00 | $2,730.00 | $2,900.00 |
| 45 | Set(type II)(24 in)(RCP)(3:1)(P) (467-7469) | EACH | 1 | $1,600.00 | $1,950.00 | $1,325.00 | $1,260.00 | $1,300.00 |
| 46 | Adjusting inlets (479-7002) | EACH | 2 | $4,500.00 | $1,600.00 | $3,300.00 | $3,150.00 | $3,400.00 |
| 47 | Removing structure (pipe) (496-7037) | EACH | 14 | $1,000.00 | $1,000.00 | $530.00 | $500.00 | $530.00 |
| 48 | Mobilization (500-7001) | LS | 1 | $1,220,000 | $1,000,000 | $1,165,000 | $1,575,000 | $1,200,000 |
| 49 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $15,000 | $4,500.00 | $4,500.00 | $20,000 | $40,000 |
| 50 | Portable changeable message sign (503-7002) | EACH | 6 | $20,000 | $21,000 | $20,000 | $10,000 | $20,000 |
| 51 | TMA (stationary) (505-7001) | DAY | 320 | $250.00 | $300.00 | $200.00 | $450.00 | $350.00 |
| 52 | TMA (mobile operation) (505-7003) | DAY | 72 | $250.00 | $400.00 | $25.00 | $550.00 | $350.00 |
| 53 | Rock filter dams (install) (type 2) (506-7002) | LF | 250 | $50.00 | $50.00 | $43.00 | $45.00 | $43.00 |
| 54 | Rock filter dams (remove) (506-7011) | LF | 250 | $15.00 | $17.00 | $11.00 | $1.00 | $11.00 |
| 55 | Construction exits (install) (type 1) (506-7020) | SY | 448 | $40.00 | $47.00 | $35.25 | $30.00 | $35.00 |
| 56 | Construction exits (remove) (506-7024) | SY | 448 | $15.00 | $14.00 | $11.00 | $5.00 | $11.00 |
| 57 | Temporary sediment control fence (install) (506-7039) | LF | 8,865 | $5.00 | $5.00 | $4.26 | $3.75 | $4.30 |
| 58 | Temporary sediment control fence (remove) (506-7041) | LF | 8,865 | $1.00 | $1.10 | $1.00 | $0.50 | $1.00 |
| 59 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 840 | $8.00 | $9.65 | $8.70 | $7.50 | $9.00 |
| 60 | Biodegradable erosion control logs (remove) (506-7046) | LF | 840 | $5.00 | $1.10 | $1.10 | $0.50 | $1.20 |
| 61 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 9,120 | $100.00 | $82.00 | $72.00 | $80.00 | $120.00 |
| 62 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 280 | $125.00 | $100.00 | $72.00 | $80.00 | $120.00 |
| 63 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 3,360 | $15.00 | $25.00 | $16.50 | $1.00 | $45.00 |
| 64 | Portable concrete traffic barrier (move)(single slope)(type 2) (512-7026) | LF | 400 | $15.00 | $42.00 | $23.00 | $1.00 | $45.00 |
| 65 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 9,120 | $65.00 | $9.00 | $26.00 | $13.00 | $45.00 |
| 66 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 280 | $80.00 | $25.00 | $23.00 | $13.00 | $45.00 |
| 67 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 3,216 | $100.00 | $90.00 | $127.52 | $110.00 | $158.00 |
| 68 | Permanent CTB (single slope)(42)(mod) (514-7004) | LF | 40 | $150.00 | $375.00 | $220.00 | $210.00 | $230.00 |
| 69 | Concrete curb (mono) (type II) (529-7007) | LF | 618 | $65.00 | $28.00 | $53.00 | $50.00 | $53.00 |
| 70 | Concrete curb & gutter (type II) (529-7009) | LF | 588 | $85.00 | $42.00 | $61.00 | $57.75 | $61.00 |
| 71 | Driveways (concrete) (530-7006) | SY | 2,054 | $175.00 | $150.00 | $206.00 | $198.00 | $210.00 |
| 72 | Driveways (ACP) (530-7010) | SY | 2,069 | $110.00 | $70.00 | $66.24 | $80.00 | $73.00 |
| 73 | Turnouts (ACP) (530-7018) | SY | 12 | $110.00 | $555.00 | $800.00 | $80.00 | $800.00 |
| 74 | Concrete directional island (536-7004) | SY | 1,379 | $190.00 | $130.00 | $185.00 | $176.00 | $185.00 |
| 75 | Metal W-beam guard fence (timber post) (540-7001) | LF | 100 | $35.00 | $29.00 | $39.30 | $33.50 | $37.00 |
| 76 | Guardrail end treatment (install) (544-7001) | EACH | 1 | $3,500.00 | $3,300.00 | $3,600.00 | $3,800.00 | $4,000.00 |
| 77 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | $725.00 | $530.00 | $1,320.00 | $210.00 | $1,350.00 |
| 78 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $800.00 | $1,760.00 | $3,520.00 | $1,050.00 | $3,600.00 |
| 79 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 1 | $400.00 | $200.00 | $313.00 | $300.00 | $600.00 |
| 80 | Remove RD IL asm (trans-base) (610-7009) | EACH | 16 | $1,000.00 | $1,050.00 | $860.00 | $450.00 | $1,100.00 |
| 81 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 16 | $7,000.00 | $6,300.00 | $6,900.00 | $4,300.00 | $6,300.00 |
| 82 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 3,835 | $11.00 | $6.50 | $10.50 | $11.25 | $6.50 |
| 83 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 2,160 | $25.00 | $14.00 | $34.10 | $17.25 | $14.00 |
| 84 | Electrical conductor (no.8) bare (620-7007) | LF | 6,260 | $2.30 | $1.25 | $2.59 | $1.55 | $1.50 |
| 85 | Electrical conductor (no.8) insulated (620-7008) | LF | 12,520 | $2.50 | $1.50 | $3.30 | $1.80 | $1.70 |
| 86 | Ground box type A (122311)W/apron (624-7002) | EACH | 34 | $1,000.00 | $1,200.00 | $1,625.00 | $1,350.00 | $1,200.00 |
| 87 | Remove ground box (624-7013) | EACH | 8 | $500.00 | $350.00 | $670.00 | $425.00 | $350.00 |
| 88 | Aluminum signs (type G) (636-7002) | SF | 398.50 | $40.00 | $41.00 | $33.55 | $28.75 | $40.00 |
| 89 | Aluminum signs (type O) (636-7003) | SF | 1,369 | $40.00 | $29.00 | $33.85 | $23.75 | $30.00 |
| 90 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 34 | $840.00 | $710.00 | $733.00 | $700.00 | $710.00 |
| 91 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 9 | $900.00 | $814.00 | $980.00 | $935.00 | $815.00 |
| 92 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 47 | $1,025.00 | $820.00 | $760.00 | $725.00 | $820.00 |
| 93 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 1 | $950.00 | $950.00 | $988.00 | $945.00 | $950.00 |
| 94 | Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035) | EACH | 1 | $1,500.00 | $1,400.00 | $1,200.00 | $1,200.00 | $1,400.00 |
| 95 | Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049) | EACH | 3 | $1,500.00 | $2,200.00 | $1,985.00 | $1,900.00 | $2,200.00 |
| 96 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 20 | $815.00 | $700.00 | $570.00 | $550.00 | $700.00 |
| 97 | Remove SM RD SN sup&AM (644-7073) | EACH | 39 | $185.00 | $121.00 | $110.00 | $100.00 | $120.00 |
| 98 | Install LRSS (struct steel) (647-7001) | LB | 2,474.77 | $8.00 | $7.00 | $8.75 | $7.00 | $7.00 |
| 99 | Remove lrsa (647-7003) | EACH | 5 | $800.00 | $3,120.00 | $1,055.00 | $2,000.00 | $3,200.00 |
| 100 | Install overhead sign support(35 FT cant) (650-7038) | EACH | 4 | $40,000 | $46,000 | $50,600 | $37,500 | $50,000 |
| 101 | Remove overhd sign sup (sign only) (650-7194) | EACH | 2 | $2,000.00 | $1,450.00 | $2,785.00 | $4,500.00 | $1,400.00 |
| 102 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 3 | $50.00 | $32.00 | $105.00 | $75.00 | $50.00 |
| 103 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 7 | $40.00 | $45.00 | $65.00 | $100.00 | $50.00 |
| 104 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 6,582 | $1.00 | $0.80 | $0.61 | $0.74 | $0.44 |
| 105 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 31,324 | $1.00 | $0.80 | $0.61 | $0.74 | $0.44 |
| 106 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 869 | $1.00 | $1.10 | $0.61 | $1.05 | $1.10 |
| 107 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 6,065 | $1.00 | $0.55 | $0.72 | $0.53 | $0.78 |
| 108 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 1,451 | $5.00 | $2.50 | $1.65 | $2.36 | $1.90 |
| 109 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 108 | $15.00 | $3.60 | $3.30 | $3.41 | $4.30 |
| 110 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 6 | $250.00 | $110.00 | $110.00 | $105.00 | $97.00 |
| 111 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 6 | $250.00 | $110.00 | $110.00 | $105.00 | $110.00 |
| 112 | Work zone pavement marking non-removing(W)36"(yld tri) (662-7032) | EACH | 26 | $25.00 | $110.00 | $22.00 | $105.00 | $28.00 |
| 113 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 26,629 | $1.00 | $0.80 | $0.61 | $0.74 | $0.44 |
| 114 | Work zone pavement marking removing (reflectorized) type II-C-R (662-7053) | EACH | 332 | $5.00 | $5.50 | $6.60 | $5.25 | $8.50 |
| 115 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 216 | $15.00 | $11.00 | $7.15 | $10.50 | $11.00 |
| 116 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,723 | $2.00 | $2.45 | $2.00 | $2.00 | $0.78 |
| 117 | Work zone pavement marking SHT terminal remove (W)(6") (662-7122) | LF | 3,792 | $2.50 | $2.90 | $2.50 | $3.25 | $2.75 |
| 118 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 300 | $2.00 | $1.10 | $1.40 | $1.05 | $2.30 |
| 119 | Reflectorized pavement marking type I (W)8"(lane drop)(090MIL) (666-7020) | LF | 1,443 | $2.00 | $1.10 | $1.40 | $1.05 | $1.55 |
| 120 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 5,591 | $0.75 | $1.00 | $1.40 | $0.95 | $1.10 |
| 121 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 3,534 | $3.00 | $4.40 | $3.25 | $4.20 | $3.70 |
| 122 | Reflectorized pavement marking type I (Y)12"(solid)(090MIL) (666-7116) | LF | 170 | $3.00 | $4.40 | $3.85 | $4.20 | $3.70 |
| 123 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 4,550 | $0.75 | $1.10 | $1.05 | $1.05 | $0.66 |
| 124 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 22,860 | $0.75 | $0.90 | $1.02 | $0.84 | $0.66 |
| 125 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 23,075 | $0.75 | $0.90 | $1.02 | $0.84 | $0.66 |
| 126 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 686 | $19.00 | $16.00 | $12.00 | $15.23 | $25.00 |
| 127 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 15 | $250.00 | $250.00 | $220.00 | $231.00 | $300.00 |
| 128 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 6 | $300.00 | $310.00 | $303.00 | $294.00 | $550.00 |
| 129 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 2 | $350.00 | $350.00 | $310.00 | $336.00 | $500.00 |
| 130 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 17 | $250.00 | $280.00 | $300.00 | $267.75 | $420.00 |
| 131 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 3 | $600.00 | $715.00 | $690.00 | $682.50 | $940.00 |
| 132 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 24 | $55.00 | $66.00 | $16.50 | $63.00 | $60.00 |
| 133 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 26 | $65.00 | $66.00 | $28.00 | $63.00 | $72.00 |
| 134 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 589 | $7.00 | $5.50 | $5.50 | $5.25 | $8.50 |
| 135 | Eliminating existing PM & markers (6") (677-7002) | LF | 27,937 | $0.60 | $0.55 | $0.55 | $0.53 | $0.55 |
| 136 | Eliminating existing PM & markers (8") (677-7004) | LF | 2,615 | $0.60 | $0.90 | $0.65 | $0.79 | $0.88 |
| 137 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $100.00 | $110.00 | $85.00 | $105.00 | $193.00 |
| 138 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $100.00 | $110.00 | $85.00 | $105.00 | $193.00 |
| 139 | Underseal course (3006-7001) | GAL | 20,303 | $12.00 | $6.60 | $12.71 | $2.50 | $12.71 |
| 140 | Bonding course (3007-7001) | GAL | 3,596 | $6.50 | $6.00 | $6.00 | $2.50 | $6.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.