TxDOT contract A00208481 bid tabulation
Install/Rehabilitate Its, US 75 (Wilson Creek to Exchange Parkway). Let by Texas DOT on September 3, 2026, Collin, Dallas District. 7 bids received; low bid $2,840,382 by Sice, Inc., -9.5% against the engineer's estimate of $3,140,077.
- Owner
- Texas DOT
- Letting
- 03 SEP 2026
- Pay items
- 63
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sice, Inc. | $2,840,382 | Low | -10% |
| 2 | Elecnor Belco Electric, Inc. | $3,012,157 | +6.0% | -4.0% |
| 3 | Light It Up Electric | $3,019,376 | +6.0% | -4.0% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $3,068,127 | +8.0% | -2.0% |
| 5 | American Lighting and Signalization, LLC | $3,075,000 | +8.0% | -2.0% |
| 6 | Mica Corporation | $3,158,892 | +11% | +1.0% |
| 7 | Lumin8 Transportation Technologies, LLC | $3,231,256 | +14% | +3.0% |
Engineer's estimate: $3,140,077.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Sice, Inc. | 2. Elecnor Belco Electric, Inc. | 3. Light It Up Electric | 4. Highway Intelligent Traffic Solutions, Inc. | 5. American Lighting and Signalization, LLC | 6. Mica Corporation |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (48 in) (416-7008) | LF | 21 | $540.00 | $451.27 | $494.00 | $625.00 | $930.38 | $1,070.00 | $712.00 |
| 2 | Riprap (concrete)(4 in) (432-7001) | CY | 1.25 | $1,065.00 | $1,088.78 | $929.00 | $1,500.00 | $1,105.75 | $1,215.00 | $2,440.00 |
| 3 | Riprap (mow strip)(4 in) (432-7013) | CY | 12 | $1,030.00 | $890.66 | $387.00 | $1,500.00 | $1,105.75 | $1,275.00 | $985.00 |
| 4 | Mobilization (500-7001) | LS | 1 | $250,000 | $281,458 | $252,918 | $285,000 | $264,768 | $124,944 | $258,000 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $10,500 | $4,782.52 | $6,663.00 | $5,000.00 | $26,183 | $7,000.00 | $30,400 |
| 6 | Portable changeable message sign (503-7001) | DAY | 40 | $160.00 | $148.42 | $149.00 | $100.00 | $54.92 | $35.00 | $120.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 80 | $225.00 | $279.49 | $180.00 | $275.00 | $351.17 | $345.00 | $433.00 |
| 8 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 200 | $8.50 | $4.46 | $14.00 | $8.00 | $9.44 | $4.50 | $6.85 |
| 9 | Biodegradable erosion control logs (remove) (506-7046) | LF | 200 | $1.75 | $0.86 | $5.00 | $2.00 | $3.54 | $0.70 | $1.05 |
| 10 | Metal W-beam guard fence (timber post) (540-7001) | LF | 225 | $27.00 | $39.59 | $30.00 | $40.00 | $31.74 | $51.00 | $27.30 |
| 11 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,400.00 | $2,968.87 | $1,549.00 | $1,850.00 | $2,135.80 | $6,450.00 | $1,444.00 |
| 12 | Remove terminal anchor section (542-7002) | EACH | 1 | $250.00 | $989.62 | $238.00 | $800.00 | $590.00 | $1,920.00 | $210.00 |
| 13 | Conduit (HDPE) (3") bore (618-7014) | LF | 310 | $32.00 | $23.76 | $34.00 | $40.00 | $33.81 | $31.00 | $26.00 |
| 14 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,025 | $12.00 | $14.37 | $17.00 | $14.00 | $19.54 | $23.00 | $14.85 |
| 15 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 460 | $32.00 | $17.27 | $28.00 | $32.00 | $32.77 | $28.00 | $19.60 |
| 16 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 2,730 | $14.00 | $25.79 | $20.00 | $16.00 | $25.89 | $26.00 | $13.90 |
| 17 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 330 | $28.00 | $13.34 | $26.00 | $20.00 | $26.99 | $28.00 | $8.90 |
| 18 | Conduit (RM) (2") (618-7078) | LF | 335 | $50.00 | $48.75 | $60.00 | $40.00 | $35.18 | $50.00 | $56.00 |
| 19 | Conduit (prepare) (618-7090) | LF | 12,145 | $1.25 | $1.11 | $2.00 | $1.00 | $1.86 | $1.50 | $2.00 |
| 20 | ITS multi-duct CND (PVC-40) (619-7001) | LF | 18,035 | $30.00 | $38.20 | $29.20 | $26.25 | $20.53 | $35.00 | $22.87 |
| 21 | ITS multi-duct CND (RMC) (619-7008) | LF | 775 | $94.50 | $95.80 | $122.20 | $96.50 | $126.77 | $60.00 | $125.70 |
| 22 | ITS multi-duct CND (HDPE)(bore) (619-7011) | LF | 14,450 | $40.00 | $29.25 | $53.95 | $51.00 | $36.07 | $40.00 | $42.65 |
| 23 | Electrical conductor (no.8) insulated (620-7008) | LF | 38,160 | $2.00 | $1.63 | $1.75 | $2.10 | $2.03 | $2.80 | $2.33 |
| 24 | Electrical conductor (no.6) bare (620-7009) | LF | 925 | $2.25 | $1.87 | $2.25 | $2.40 | $3.09 | $3.25 | $2.90 |
| 25 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,850 | $2.50 | $2.26 | $2.25 | $2.80 | $3.55 | $3.50 | $2.90 |
| 26 | Electrical conductor (no.4) bare (620-7011) | LF | 955 | $2.89 | $3.05 | $3.20 | $4.07 | $5.00 | $3.70 | |
| 27 | Electrical conductor (no.4) insulated (620-7012) | LF | 1,910 | $3.22 | $3.05 | $3.65 | $4.39 | $5.50 | $3.70 | |
| 28 | Electrical conductor (no.2) bare (620-7015) | LF | 600 | $4.43 | $4.15 | $4.75 | $5.24 | $5.50 | $5.70 | |
| 29 | Electrical conductor (no.2) insulated (620-7016) | LF | 1,200 | $4.87 | $4.15 | $5.75 | $6.54 | $6.50 | $5.70 | |
| 30 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 9 | $4,700.00 | $4,287.40 | $5,421.00 | $4,650.00 | $6,505.13 | $5,400.00 | $4,060.00 |
| 31 | ITS GND box(pcast) type 1 (243660)W/aprn (623-7006) | EACH | 50 | $5,500.00 | $4,739.38 | $6,005.00 | $5,330.00 | $6,090.12 | $5,500.00 | $4,246.00 |
| 32 | ITS GND box(pcast) type 2 (366060)W/aprn (623-7012) | EACH | 8 | $10,000 | $7,265.36 | $8,251.00 | $7,575.00 | $8,990.21 | $9,175.00 | $6,684.00 |
| 33 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $1,700.00 | $1,670.94 | $1,966.00 | $1,700.00 | $1,422.15 | $5,000.00 | $1,866.00 |
| 34 | Remove ground box (624-7013) | EACH | 7 | $275.00 | $263.90 | $476.00 | $300.00 | $1,187.68 | $200.00 | $364.00 |
| 35 | Remove electrical services (628-7002) | EACH | 2 | $734.06 | $1,072.00 | $800.00 | $2,046.43 | $2,045.00 | $546.00 | |
| 36 | Elc SRV type D 120/240 060(NS)SS(N)PS(U) (628-7154) | EACH | 1 | $7,500.00 | $6,974.88 | $8,613.00 | $7,400.00 | $8,143.14 | $7,500.00 | $9,390.00 |
| 37 | Elc SRV type D 120/240 100(NS)SS(N)EX(O) (628-7355) | EACH | 1 | $2,720.54 | $5,817.00 | $5,200.00 | $5,429.14 | $2,675.00 | $5,462.00 | |
| 38 | Elc SRV type D 120/240 150(NS)SS(N)EX(O) (628-7356) | EACH | 1 | $3,472.66 | $6,510.00 | $5,800.00 | $6,101.74 | $3,700.00 | $5,808.00 | |
| 39 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 3 | $38.00 | $46.18 | $39.00 | $50.00 | $35.40 | $51.00 | $44.00 |
| 40 | Install circuit breaker (690-7304) | EACH | 5 | $875.00 | $599.51 | $197.00 | $500.00 | $803.24 | $70.00 | $309.00 |
| 41 | ITS com CBL (ethernet) (6005-7001) | LF | 905 | $2.25 | $2.15 | $2.50 | $2.00 | $5.78 | $3.20 | $10.35 |
| 42 | System integration (6009-7001) | LS | 1 | $40,000 | $8,458.25 | $22,152 | $17,000 | $39,847 | $6,400.00 | $30,195 |
| 43 | ITS RVSD (data collect & wwa) sys (6010-7001) | EACH | 8 | $14,500 | $12,559 | $14,714 | $11,375 | $16,327 | $13,600 | $16,940 |
| 44 | Remove ITS RSVD (DC only) (6010-7003) | EACH | 7 | $250.00 | $634.82 | $269.00 | $650.00 | $1,087.20 | $575.00 | $1,545.00 |
| 45 | ITS pole (60 FT)(90 MPH) (6011-7003) | EACH | 1 | $26,000 | $33,324 | $28,174 | $26,300 | $30,808 | $34,250 | $23,852 |
| 46 | ITS pole MNT cab (type 3)(conf 1) (6011-7031) | EACH | 1 | $6,500.00 | $6,384.89 | $6,695.00 | $6,000.00 | $9,247.45 | $8,600.00 | $6,295.00 |
| 47 | Ground box (prepare) (6013-7006) | EACH | 37 | $400.00 | $197.93 | $197.00 | $300.00 | $796.16 | $450.00 | $615.00 |
| 48 | Remove ITS radio (6014-7007) | EACH | 22 | $1,000.00 | $846.43 | $197.00 | $1,200.00 | $993.62 | $470.00 | $1,596.00 |
| 49 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 1 | $1,500.00 | $846.43 | $791.00 | $800.00 | $2,299.96 | $970.00 | $3,672.00 |
| 50 | CCTV mount (pedestal) (6018-7010) | EACH | 1 | $750.00 | $763.29 | $243.00 | $400.00 | $367.38 | $900.00 | $1,033.00 |
| 51 | Fiber optic CBL (single-mode)(36 fiber) (6027-7002) | LF | 40,645 | $4.00 | $2.83 | $2.20 | $3.25 | $2.80 | $4.00 | $2.92 |
| 52 | Fiber optic fusion splice (6027-7004) | EACH | 144 | $235.00 | $27.76 | $70.00 | $65.00 | $53.10 | $51.00 | $78.50 |
| 53 | Fiber optic patch panel (36 positions) (6027-7007) | EACH | 2 | $2,200.00 | $1,237.53 | $2,311.00 | $3,400.00 | $1,469.18 | $3,860.00 | $2,170.00 |
| 54 | FO splice enclosure (type 1) (6027-7009) | EACH | 4 | $1,100.00 | $935.53 | $1,072.00 | $1,500.00 | $1,111.44 | $960.00 | $1,972.00 |
| 55 | Fiber optic CBL (single-mode)(6 fiber) (6027-7011) | LF | 21,900 | $2.50 | $2.46 | $1.40 | $2.00 | $1.31 | $3.65 | $3.75 |
| 56 | Fiber optic patch panel (6 position) (6027-7012) | EACH | 18 | $1,650.00 | $704.48 | $760.00 | $950.00 | $1,631.16 | $1,500.00 | $1,096.00 |
| 57 | Fiber optic CBL (SNGL-mode)(48 fiber) (6027-7013) | LF | 42,370 | $5.00 | $2.83 | $2.40 | $3.50 | $1.53 | $4.40 | $3.51 |
| 58 | Fiber optic patch panel (96 position) (6027-7026) | EACH | 6 | $5,000.00 | $17,393 | $4,852.00 | $9,000.00 | $9,446.70 | $9,700.00 | $4,781.00 |
| 59 | Fiber optic patch panel (48 position) (6027-7038) | EACH | 2 | $2,500.00 | $3,763.17 | $2,821.00 | $4,600.00 | $5,097.02 | $5,100.00 | $2,654.00 |
| 60 | Ethernet switch (install only) (6036-7001) | EACH | 8 | $1,000.00 | $328.30 | $395.00 | $750.00 | $938.52 | $625.00 | $1,793.00 |
| 61 | Installation of terminal server (6046-7001) | EACH | 1 | $1,000.00 | $541.72 | $3,164.00 | $500.00 | $1,115.52 | $3,850.00 | $1,005.00 |
| 62 | ITS GRND MNT cab (type 4) (conf 2) (6050-7004) | EACH | 6 | $15,000 | $10,216 | $9,915.00 | $12,075 | $17,433 | $8,500.00 | $14,870 |
| 63 | ITS GRND MNT cab (type 6)(conf 2) (6050-7009) | EACH | 1 | $17,500 | $15,809 | $14,110 | $15,600 | $23,414 | $12,400 | $17,910 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 3, 2026. Compiled by Mirage Metrics.