TxDOT contract A00192267 bid tabulation
Install Intelligent Vehicle Highway System, US 287 (SB off ramp to Riverside Dr. to Village Creek Rd.). Let by Texas DOT on August 8, 2025, Tarrant, Fort Worth District. 5 bids received; low bid $1,430,727 by Light It Up Electric, -13% against the engineer's estimate of $1,635,484.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 49
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Light It Up Electric | $1,430,727 | Low | -13% |
| 2 | Florida Traffic Control Devices, Inc. | $1,538,000 | +7.0% | -6.0% |
| 3 | Sice, Inc. | $1,626,005 | +14% | -1.0% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $1,626,119 | +14% | -1.0% |
| 5 | Mica Corporation | $1,663,240 | +16% | +2.0% |
Engineer's estimate: $1,635,484.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Light It Up Electric | 2. Florida Traffic Control Devices, Inc. | 3. Sice, Inc. | 4. Highway Intelligent Traffic Solutions, Inc. | 5. Mica Corporation |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7007) | CY | 2 | $370.00 | $200.00 | $3,636.00 | $1,479.77 | $1,125.95 | $1,160.00 |
| 2 | Hydro mulch seed (permanent_urban_clay) (164-7020) | SY | 1,009 | $2.00 | $3.00 | $10.15 | $3.36 | $5.33 | $7.60 |
| 3 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 1,009 | $2.00 | $3.00 | $8.85 | $3.36 | $5.33 | $6.60 |
| 4 | Vegetative watering (168-7001) | TGL | 36 | $300.00 | $35.00 | $310.00 | $31.90 | $66.67 | $338.00 |
| 5 | Drilled shaft (48 in) (416-7008) | LF | 21 | $560.00 | $675.00 | $1,100.00 | $835.38 | $609.34 | $600.00 |
| 6 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 156 | $435.00 | $260.00 | $772.00 | $206.61 | $250.01 | $309.00 |
| 7 | Riprap (concrete)(5 in) (432-7002) | CY | 2 | $1,040.00 | $1,200.00 | $4,372.00 | $1,636.07 | $1,333.30 | $3,295.00 |
| 8 | Riprap (concrete)(CL A) (432-7004) | CY | 1.25 | $2,000.00 | $1,000.00 | $6,115.00 | $1,251.28 | $1,333.30 | $2,350.00 |
| 9 | Mobilization (500-7001) | LS | 1 | $150,000 | $150,000 | $153,500 | $125,735 | $158,747 | $156,900 |
| 10 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $12,000 | $10,000 | $4,416.00 | $7,519.81 | $34,893 | $25,925 |
| 11 | Portable changeable message sign (503-7001) | DAY | 52 | $160.00 | $85.00 | $205.00 | $229.50 | $105.41 | $231.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 49 | $330.00 | $300.00 | $205.00 | $569.66 | $365.72 | $231.00 |
| 13 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 325 | $11.40 | $9.00 | $31.65 | $6.46 | $14.67 | $23.65 |
| 14 | Biodegradable erosion control logs (remove) (506-7046) | LF | 325 | $5.00 | $1.50 | $14.75 | $1.29 | $4.11 | $11.00 |
| 15 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 380 | $25.00 | $25.00 | $16.35 | $12.90 | $31.25 | $26.85 |
| 16 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 8,811 | $29.00 | $27.00 | $18.75 | $14.91 | $13.71 | $15.00 |
| 17 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 2,436 | $42.00 | $33.00 | $61.60 | $21.53 | $27.36 | $43.65 |
| 18 | Conduit (prepare) (618-7090) | LF | 875 | $5.60 | $2.00 | $5.05 | $6.37 | $2.67 | $4.75 |
| 19 | Electrical conductor (no.8) bare (620-7007) | LF | 11,100 | $3.10 | $1.60 | $1.90 | $1.28 | $2.40 | $2.05 |
| 20 | Electrical conductor (no.8) insulated (620-7008) | LF | 11,186 | $3.10 | $1.80 | $2.50 | $1.63 | $2.55 | $2.40 |
| 21 | Electrical conductor (no.4) bare (620-7011) | LF | 2,010 | $3.80 | $2.60 | $2.85 | $2.86 | $4.83 | $2.85 |
| 22 | Electrical conductor (no.4) insulated (620-7012) | LF | 4,110 | $4.10 | $3.00 | $3.85 | $3.50 | $4.72 | $3.50 |
| 23 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 29 | $5,760.00 | $5,200.00 | $5,805.00 | $6,582.50 | $6,439.68 | $4,325.00 |
| 24 | Ground box type D (162922)W/apron (624-7008) | EACH | 10 | $2,640.00 | $1,800.00 | $2,110.00 | $1,962.64 | $1,530.74 | $2,225.00 |
| 25 | Elc SRV type D 120/240 060(NS)SS(N)PS(U) (628-7154) | EACH | 7 | $9,385.00 | $10,000 | $8,130.00 | $12,990 | $10,492 | $11,820 |
| 26 | Elc SRV type D 120/240 060(NS)SS(N)SP(O) (628-7156) | EACH | 3 | $9,475.00 | $8,500.00 | $9,353.00 | $5,095.77 | $9,153.37 | $8,685.00 |
| 27 | Aluminum signs (type A) (636-7001) | SF | 16 | $100.00 | $50.00 | $35.10 | $46.22 | $124.20 | $26.15 |
| 28 | Replace existing aluminum signs(type A) (636-7004) | SF | 17.50 | $250.00 | $55.00 | $64.30 | $46.22 | $115.37 | $42.95 |
| 29 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $1,655.00 | $850.00 | $1,445.00 | $1,899.97 | $2,105.55 | $1,110.00 |
| 30 | Remove SM RD SN sup&AM (644-7073) | EACH | 15 | $240.00 | $125.00 | $244.00 | $127.60 | $411.28 | $465.00 |
| 31 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 910 | $19.00 | $6.00 | $11.00 | $9.69 | $11.35 | $47.50 |
| 32 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 1 | $100.00 | $800.00 | $220.65 | $193.84 | $200.00 | $220.00 |
| 33 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 910 | $11.00 | $2.00 | $1.50 | $1.29 | $2.68 | $2.20 |
| 34 | Install circuit breaker (690-7304) | EACH | 2 | $300.00 | $800.00 | $928.00 | $876.03 | $683.29 | $245.00 |
| 35 | ITS RVSD (data collect & wwa) sys (6010-7001) | EACH | 1 | $21,720 | $30,000 | $25,790 | $13,691 | $18,501 | $19,400 |
| 36 | ITS pole (60 FT)(90 MPH) (6011-7003) | EACH | 1 | $23,600 | $29,587 | $33,000 | $30,404 | $31,773 | $25,475 |
| 37 | ITS pole MNT cab (type 3)(conf 2) (6011-7004) | EACH | 1 | $8,700.00 | $7,300.00 | $7,600.00 | $8,176.26 | $11,286 | $8,105.00 |
| 38 | Ground box (prepare) (6013-7006) | EACH | 10 | $705.00 | $600.00 | $375.00 | $328.25 | $806.27 | $865.00 |
| 39 | ITS radio(SNGL)(5 GHZ)-I-U (6014-7001) | EACH | 14 | $8,090.00 | $6,625.00 | $5,728.00 | $9,304.22 | $7,884.60 | $8,285.00 |
| 40 | CCTV field equipment (digital) (6018-7002) | EACH | 1 | $9,370.00 | $9,775.00 | $8,210.00 | $10,036 | $12,618 | $10,500 |
| 41 | CCTV mount (pole) (6018-7003) | EACH | 1 | $670.00 | $600.00 | $550.00 | $1,000.62 | $338.98 | $1,160.00 |
| 42 | Fiber optic CBL (single-mode)(36 fiber) (6027-7002) | LF | 7,996 | $5.30 | $5.00 | $15.40 | $5.66 | $4.87 | $8.17 |
| 43 | Fiber optic fusion splice (6027-7004) | EACH | 168 | $100.00 | $125.00 | $85.00 | $64.61 | $59.45 | $73.00 |
| 44 | FO splice enclosure (type 1) (6027-7009) | EACH | 12 | $2,675.00 | $1,700.00 | $977.00 | $3,191.91 | $2,702.99 | $2,160.00 |
| 45 | FO CBL (12 SMF)(pigtail) (6027-7020) | LF | 1,185 | $4.50 | $10.00 | $4.35 | $5.25 | $5.20 | $21.55 |
| 46 | Preterm fiber patch panel (12 position) (6027-7021) | EACH | 14 | $2,760.00 | $1,800.00 | $2,110.00 | $3,230.68 | $2,795.49 | $1,890.00 |
| 47 | Install wrong way driver detection sys (6038-7001) | EACH | 13 | $9,800.00 | $11,500 | $5,335.00 | $31,879 | $15,497 | $16,180 |
| 48 | Installation of ethernet switch (6052-7001) | EACH | 14 | $2,800.00 | $1,500.00 | $1,300.00 | $358.46 | $1,077.89 | $1,725.00 |
| 49 | Installation of serial server unit (6052-7003) | EACH | 1 | $1,760.00 | $2,000.00 | $162.00 | $440.53 | $1,077.89 | $1,320.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.