TxDOT letting results, March 18, 2025

12 contracts let by Texas DOT on March 18, 2025, $3,045,409 in low bids, a median of 2 bidders per contract. On the 12 with an engineer's estimate, the low bid came in under it 9 times; median low bid -7.0% against the estimate.

Owner
Texas DOT
Contracts
12
Low bids, total
$3,045,409
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
A00214401HOT MIX, IH0020 (West Region to Abilene District)Abilene District3RK Hall, LLC$671,913$713,120+6.0%-8.0%TxDOT
A00214361HOT MIX, IH0020 (Central Region to Abilene District)Abilene District2Zack Burkett Co.$578,564$621,103+7.0%-8.0%TxDOT
A00214319HYDRAULIC CEMENT, US0181 (VARIOUS to .)Corpus Christi District1Aka-Materials$280,010-6.0%TxDOT
A00213885HYDRAULIC CEMENT, SH0358 (VARIOUS to .)Corpus Christi District3Aka-Materials$238,180$239,755+1.0%-3.0%TxDOT
A00214280EMULSION, US0062 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District2Ergon Asphalt & Emulsions, Inc.$221,000$267,000+21%-20%TxDOT
A00214284CUTBACK, US0084 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District3Wright Asphalt Products Company LLC$189,000$247,478+31%+9.0%TxDOT
A00214313LARGE SIGN REPLACEMENT, US0077 (VARIOUS to .)Corpus Christi District2Highway Barricades and Services, LLC$188,952$283,270+50%-5.0%TxDOT
A00213883EMULSION, US0181 (VARIOUS to .)Corpus Christi District1Ergon Asphalt & Emulsions, Inc.$167,400+3.0%TxDOT
A00214282EMULSION, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District2Ergon Asphalt & Emulsions, Inc.$161,900$192,500+19%-20%TxDOT
A00214281EMULSION, US0084 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District2Ergon Asphalt & Emulsions, Inc.$161,800$193,000+19%-19%TxDOT
A00213884EMULSION, US0077 (VARIOUS to .)Corpus Christi District1Ergon Asphalt & Emulsions, Inc.$131,490+1.0%TxDOT
A00214283EMULSION, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)Lubbock District2Ergon Asphalt & Emulsions, Inc.$55,200$67,250+22%-20%TxDOT
TxDOT contracts let on March 18, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy