TxDOT letting results, March 19, 2025
10 contracts let by Texas DOT on March 19, 2025, $2,392,029 in low bids, a median of 6.5 bidders per contract. On the 10 with an engineer's estimate, the low bid came in under it 9 times; median low bid -14% against the estimate.
- Owner
- Texas DOT
- Contracts
- 10
- Low bids, total
- $2,392,029
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00213843 | EMULSION, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 1 | Ergon Asphalt & Emulsions, Inc. | $798,900 | -6.0% | TxDOT | ||
| A00212987 | MOWING HIGHWAY RIGHT OF WAY, US0059 (ANGELINA COUNTY to VARIOUS LOCATIONS) | Lufkin District | 3 | Cehand Services LLC | $367,807 | $473,169 | +29% | +1.0% | TxDOT |
| A00214127 | TREE TRIMMING AND BRUSH REMOVAL, SH0021 (SABINE COUNTY to VARIOUS LOCATIONS) | Lufkin District | 7 | Ace Contractors, Inc. | $259,535 | $267,040 | +3.0% | -9.0% | TxDOT |
| A00214202 | TREE TRIMMING AND BRUSH REMOVAL, FM0357 (TRINITY COUNTY to VARIOUS LOCATIONS) | Lufkin District | 7 | Rhino Equity, LLC | $221,945 | $274,500 | +24% | -24% | TxDOT |
| A00212746 | MOWING HIGHWAY RIGHT OF WAY, SH0016 (Young County to various roadways) | Wichita Falls District | 7 | Abescape Group LLC | $194,729 | $195,000 | 0.0% | -20% | TxDOT |
| A00212744 | MOWING HIGHWAY RIGHT OF WAY, US0082 (Baylor County to various roadways) | Wichita Falls District | 7 | Abescape Group LLC | $185,145 | $205,646 | +11% | -16% | TxDOT |
| A00212745 | MOWING HIGHWAY RIGHT OF WAY, US0183 (Throckmorton County to various roadways) | Wichita Falls District | 7 | Abescape Group LLC | $101,468 | $103,874 | +2.0% | -20% | TxDOT |
| A00214274 | MOWING HIGHWAY RIGHT OF WAY, US0259 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 6 | HX Farms, Inc. | $90,000 | $93,775 | +4.0% | -10% | TxDOT |
| A00214273 | MOWING HIGHWAY RIGHT OF WAY, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 4 | HX Farms, Inc. | $87,500 | $93,775 | +7.0% | -12% | TxDOT |
| A00214275 | MOWING HIGHWAY RIGHT OF WAY, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 5 | Perry West | $85,000 | $93,775 | +10% | -15% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.