HX Farms, Inc.: TxDOT bid record

HX Farms, Inc. submitted 37 bids on Texas DOT contracts in the data, from 19 FEB 2020 to 11 AUG 2026, and was the low bidder on 8 of them (22%). When it was not low, its total sat a median +28% above the low bid.

Owner
Texas DOT
Low bid volume
$2,326,809
Latest bid
11 AUG 2026
Data through
19 NOV 2026
37Bids
8Low bids
22Win rate, percent
+28%Median gap to the low bid when not low, 29 bids

By year

YearBidsLow bidsWin rate
20204125%
20219444%
2022300%
2024700%
20256233%
20268113%
HX Farms, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Atlanta District25624%
Tyler District1119%
San Angelo District11100%
HX Farms, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY83 (38%)$200.00$230.00
Spot mowing730-7021ACRE102 (20%)$49.50$35.00
Barricades, signs and traffic handling502-7001MO72 (29%)$2,000.00$5,000.00
Mobilization (callout)500-7002EACH62 (33%)$2,750.00$688.00
Tree trimming / brush removal752-7001MI81 (13%)$2,000.00$2,300.00
HX Farms, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

HX Farms, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
11 AUG 2026A00220007Tyler DistrictTREE TRIMMING AND BRUSH REMOVAL, FM1252 (Various Locations in to Gregg County.)2 of 6$54,158+9.0%
15 JUL 2026A00221700Atlanta DistrictTREE REMOVAL, SH0049 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)4 of 6$408,299+20%
10 FEB 2026A00219491Tyler DistrictMOWING HIGHWAY RIGHT OF WAY, US0080 (VARIOUS LOCATIONS to IN GREGG COUNTY)4 of 4$465,010+34%
06 FEB 2026A00217713Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, FM0161 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)4 of 6$237,544+18%
06 FEB 2026A00217714Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, FM0556 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)7 of 7$271,068+45%
06 FEB 2026A00217715Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, SH0049 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)1 of 6$180,033Low, 2.0% under the second
06 FEB 2026A00217716Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, FM0251 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)6 of 7$303,702+29%
06 FEB 2026A00217717Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, US0080 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)5 of 6$400,292+23%
16 SEP 2025A00216532Tyler DistrictTREE TRIMMING AND BRUSH REMOVAL, US0069 (Various roadways in to Smith County)9 of 12$329,176+74%
19 MAR 2025A00214275Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)3 of 5$95,000+12%
19 MAR 2025A00214273Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)1 of 4$87,500Low, 7.0% under the second
19 MAR 2025A00214274Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, US0259 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)1 of 6$90,000Low, 4.0% under the second
20 FEB 2025A00212917Atlanta DistrictTREE REMOVAL, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)7 of 9$263,463+44%
11 FEB 2025A00212932Tyler DistrictMOWING HIGHWAY RIGHT OF WAY, US0175 (VARIOUS LOCATIONS IN to HENDERSON COUNTY)5 of 6$1,119,617+52%
20 NOV 2024A00212629Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, SH0049 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)4 of 5$171,161+18%
20 NOV 2024A00212627Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, FM0161 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)5 of 5$228,344+36%
20 NOV 2024A00212626Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)4 of 4$282,568+47%
20 NOV 2024A00212628Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, FM0556 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)6 of 7$257,936+45%
20 NOV 2024A00212630Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, FM0251 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)2 of 3$271,410+19%
20 NOV 2024A00212632Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, US0271 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)5 of 5$358,609+35%
20 NOV 2024A00212631Atlanta DistrictMOWING HIGHWAY RIGHT OF WAY, US0080 (VARIOUS ROADWAYS to VARIOUS ROADWAYS)3 of 4$377,813+35%
13 SEP 202209221006Tyler DistrictUS0059 Tree trimming and brush removal from VARIOUS ROADWAYS IN to RUSK COUNTY3 of 7$244,932+18%
10 AUG 202208221901Atlanta DistrictUS0059 Tree removal from VARIOUS ROADWAYS to VARIOUS ROADWAYS2 of 3$248,221+27%
04 AUG 202208223254Tyler DistrictSL 256 Landscape development from VARIOUS LOCATIONS ON to STATE LOOP 256 IN PALESTINE2 of 4$33,309+4.0%
08 OCT 202110213220Tyler DistrictVA Replacement of missing small roadside signs from VARIOUS LOCATIONS IN SMITH to AND CHEROKEE COUNTIES1 of 7$34,806Low, 0.0% under the second
HX Farms, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy