TxDOT letting results, August 10, 2022
9 contracts let by Texas DOT on August 10, 2022, $1,768,057 in low bids, a median of 3 bidders per contract. On the 9 with an engineer's estimate, the low bid came in under it 4 times; median low bid +2.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 9
- Low bids, total
- $1,768,057
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 08221712 | IH0045 Hot mix from VARIOUS to VARIOUS | Bryan District | 1 | Big Creek Construction, LTD. | $322,750 | +20% | TxDOT | ||
| 08221102 | US0059 Maintenance of large signs from VARIOUS LOCATIONS to DISTRICTWIDE | Lufkin District | 1 | DCC Construction and Services, L.L.C. | $251,830 | +14% | TxDOT | ||
| 08221711 | SH0006 Hot mix from VARIOUS to VARIOUS | Bryan District | 4 | Waller County Asphalt Inc. | $227,000 | $243,200 | +7.0% | -13% | TxDOT |
| 08221708 | SH0006 Hot mix from VARIOUS to VARIOUS | Bryan District | 1 | Knife River Corporation - South | $218,000 | -7.0% | TxDOT | ||
| 08221901 | US0059 Tree removal from VARIOUS ROADWAYS to VARIOUS ROADWAYS | Atlanta District | 3 | H. V. Caver, Inc. | $194,969 | $248,221 | +27% | +10% | TxDOT |
| 08221902 | US0059 Tree removal from VARIOUS ROADWAYS to VARIOUS ROADWAYS | Atlanta District | 3 | Drewery Construction Company, Incorporated | $180,264 | $208,541 | +16% | +2.0% | TxDOT |
| 08221402 | SH0029 Crack seal from VARIOUS LOCATIONS IN BURNET, BLANCO to GILLESPIE, LLANO AND MASON COUNTIES | Austin District | 4 | Fyl Enterprises, LLC | $148,460 | $154,693 | +4.0% | +29% | TxDOT |
| 08221401 | US0290 Crack seal from VARIOUS LOCATIONS IN BASTROP, to CALDWELL, AND LEE COUNTIES | Austin District | 5 | Fyl Enterprises, LLC | $130,773 | $161,901 | +24% | -17% | TxDOT |
| 08221403 | FM0973 Crack seal from VARIOUS LOCATIONS IN to TRAVIS COUNTY | Austin District | 2 | Fyl Enterprises, LLC | $94,010 | $148,906 | +58% | -20% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.