TxDOT letting results, August 9, 2022
11 contracts let by Texas DOT on August 9, 2022, $1,424,303 in low bids, a median of 2 bidders per contract. On the 11 with an engineer's estimate, the low bid came in under it 4 times; median low bid +1.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 11
- Low bids, total
- $1,424,303
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 08220603 | US0385 Mowing highway right of way from VARIOUS to VARIOUS | Odessa District | 2 | Abescape Group LLC | $281,152 | $334,680 | +19% | 0.0% | TxDOT |
| 08221705 | IH0045 Emulsion from VARIOUS to VARIOUS | Bryan District | 3 | Cleveland Asphalt Products, Inc. | $246,000 | $268,200 | +9.0% | +13% | TxDOT |
| 08220602 | IH0010 Cleaning and sealing cracks from VARIOUS to VARIOUS | Odessa District | 3 | Greenpak Solutions, Limited Liability Company | $186,287 | $263,676 | +42% | -38% | TxDOT |
| 08222001 | US0069 Hot-mix cold-laid from DISTRICTWIDE to DISTRICTWIDE | Beaumont District | 1 | Texas Materials Group, Inc. | $152,250 | +30% | TxDOT | ||
| 08221001 | FM1798 Crack seal from VARIOUS ROADWAYS IN to THE TYLER DISTRICT | Tyler District | 6 | Scout 5 Construction LLC | $132,722 | $170,089 | +28% | -43% | TxDOT |
| 08220601 | IH0020 Emulsion from VARIOUS to VARIOUS | Odessa District | 2 | Ergon Asphalt & Emulsions, Inc. | $117,420 | $134,220 | +14% | +9.0% | TxDOT |
| 08221702 | SH0006 Cutback from VARIOUS to VARIOUS | Bryan District | 2 | Martin Resource Management Corporation | $103,280 | $108,240 | +5.0% | -3.0% | TxDOT |
| 08221701 | SH0036 Cutback from VARIOUS to VARIOUS | Bryan District | 2 | Martin Resource Management Corporation | $92,720 | $109,760 | +18% | -13% | TxDOT |
| 08220604 | IH0020 Emulsion from VARIOUS to VARIOUS | Odessa District | 2 | Ergon Asphalt & Emulsions, Inc. | $77,160 | $89,160 | +16% | +31% | TxDOT |
| 08222002 | SH0347 Asphaltic patching material from LIBERTY MAINTENANCE YARD to LIBERTY MAINTENANCE YARD | Beaumont District | 2 | Waller County Asphalt Inc. | $21,702 | $24,150 | +11% | +1.0% | TxDOT |
| 08221707 | IH0045 Asphaltic patching material from VARIOUS to VARIOUS | Bryan District | 1 | Waller County Asphalt Inc. | $13,610 | +9.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.