Bontke Brothers Construction Company: TxDOT bid record

Bontke Brothers Construction Company submitted 24 bids on Texas DOT contracts in the data, from 06 AUG 2020 to 02 JUL 2026, and was the low bidder on 4 of them (17%). When it was not low, its total sat a median +25% above the low bid.

Owner
Texas DOT
Low bid volume
$38,750,827
Latest bid
02 JUL 2026
Data through
19 NOV 2026
24Bids
4Low bids
17Win rate, percent
+25%Median gap to the low bid when not low, 20 bids

By year

YearBidsLow bidsWin rate
2020400%
20235360%
20248113%
2025600%
2026100%
Bontke Brothers Construction Company, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Abilene District23417%
Wichita Falls District100%
Bontke Brothers Construction Company, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO2412 (50%)$10,000$5,000.00
Work zone pavement marking SHT terminal (tab)type Y-2662-7114EACH1310 (77%)$1.00$1.41
TMA (mobile operation)505-7003DAY246 (25%)$500.00$291.17
TMA (stationary)505-7001DAY236 (26%)$250.00$230.00
Prefabricated pavement marking type C (W) (24") (solid)668-6076LF96 (67%)$15.00$15.50
Reflectorized pavement marker type II-A-A672-7004EACH185 (28%)$6.00$5.00
Reflectorized pavement marker type I-C672-7002EACH115 (45%)$6.00$5.00
Rock filter dams (remove)506-7011LF85 (63%)$12.50$12.00
Portable changeable message sign503-7002EACH55 (100%)$5,000.00$10,000
Temporary sediment control fence (install)506-7039LF124 (33%)$5.00$4.00
Excavation (roadway)110-7001CY114 (36%)$20.00$20.00
Work zone pavement marking removing (W)24"(solid)662-7077LF94 (44%)$15.00$10.00
Bontke Brothers Construction Company, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
J. H. Strain & Sons, Inc.1412 of 14
CK Newberry, LLC126 of 12
A. L. Helmcamp, Inc.95 of 9
Gilvin-Terrill, LTD.71 of 7
Foutsco Paving Company, LLC66 of 6
RK Hall, LLC54 of 5
Reece Albert, Inc.54 of 5
Contract Paving Co.42 of 4
Nobles Road Construction, Inc.42 of 4
Grey Sky Construction LLC40 of 4
Bontke Brothers Construction Company, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
02 JUL 2026A00212148Abilene DistrictBicycle And Pedestrian Improvements, FM 3438 (HARTFORD ST to 600 FT N OF LITTLE ELM CREEK)6 of 7$373,248+47%
05 NOV 2025A00187119Abilene DistrictResurface Roadway, US 87 (NEAR RM 33 to NEAR FM 461)5 of 5$3,412,489+68%
01 JUL 2025A00183298Abilene DistrictBicycle And Pedestrian Improvements, SH 36 (BU 83D to FM 1750)3 of 5$4,686,027+12%
02 MAY 2025A00194968Abilene DistrictWiden Road - Add Lanes, SH 36 (CR 123 to CALLAHAN COUNTY)7 of 8$12,464,352+17%
04 APR 2025A00202528Abilene DistrictPreventive Maintenance, IH 20 (RAMPS WEST OF SH 70 to SH 70)4 of 5$872,001+31%
03 APR 2025A00140690Abilene DistrictWiden Road - Add Shoulders, FM 1235 (CR 306 to CR 300)4 of 6$3,585,233+13%
05 MAR 2025A00193322Abilene DistrictWiden Road - Add Shoulders, FM 382 (FM 604 to RUNNELS COUNTY)3 of 6$2,512,502+41%
06 NOV 2024A00064788Abilene DistrictWiden Road - Add Shoulders, FM 608 (.010MI EAST OF SECOND ST IN MARYNEAL to SH 70)5 of 5$10,679,710+35%
03 MAY 202405243210Abilene DistrictFM 1226 Widen road - add shoulders from FM 1636 to US 1802 of 4$10,501,879+10%
03 MAY 202405243216Abilene DistrictIH 20 Rehabilitate existing roadway from SFR EB EXIT TO HOPKINS RD INTERSECT to NFR WB EXIT1 of 2$6,255,552Low, 3.0% under the second
02 MAY 202405243021Abilene DistrictFM 18 Rehabilitate existing roadway from SH 36 to CALLAHAN CO LINE3 of 4$5,658,945+24%
06 MAR 202403243212Abilene DistrictFM 1082 Surfacing/roadway restoration from FM 2833 to FM 35222 of 5$4,142,611+16%
05 MAR 202403243007Abilene DistrictSH 36 Widen road - add lanes from CR 459 to FM 27072 of 5$8,948,613+21%
05 MAR 202403243037Abilene DistrictSH 70 Resurface roadway from SH 153 to 1.099MI SOUTH OF CO RD 2363 of 3$7,205,801+27%
04 JAN 202401243004Abilene DistrictSH 350 Resurface roadway from 1200 FT WEST OF FM 820 to MITCHELL COUNTY LINE4 of 4$25,050,244+40%
06 SEP 202309233014Abilene DistrictFM 608 Rehabilitate existing roadway from FISHER COUNTY to BU 84-J1 of 2$4,084,995Low, 13% under the second
06 SEP 202309233021Abilene DistrictSH 206 Preventive maintenance from SH 279 to BROWN COUNTY LINE4 of 4$2,346,804+47%
28 JUN 202306233607Abilene DistrictVA Intersection improvement from VARIOUS LOCATION IN to ABILENE DISTRICT1 of 2$16,096,056Low, 23% under the second
02 JUN 202306233205Abilene DistrictSH 153 Widen road - add lanes from SH 70 to CR 1761 of 4$12,314,224Low, 5.0% under the second
02 JUN 202306233214Wichita Falls DistrictSH 79 Widen road - add shoulders from YOUNG COUNTY LINE to US 1833 of 3$14,909,725+87%
03 DEC 202012203216Abilene DistrictVA Spot repair mill and fill from BIG SPRING to AREA OFFICE4 of 5$1,430,713+14%
03 DEC 202012203219Abilene DistrictVA Spot repair mill and fill from ABILENE to AREA OFFICE2 of 7$923,660+1.0%
02 DEC 202012203021Abilene DistrictVA Spot repair mill and fill from VARIOUS LOCATIONS IN THE to ABILENE DISTRICT3 of 6$1,149,888+5.0%
06 AUG 202008203225Abilene DistrictUS 83 Add frontage road connecting fm 707 to antilley from NORTH OF FM 707 to NEAR ANTILLEY ROAD4 of 5$4,291,045+27%
Bontke Brothers Construction Company: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy