TxDOT contract A00200988 bid tabulation

Install/Upgrade Drainage Structure(S), IH 35 (Various Locations On IH 35 to Near Downtown). Let by Texas DOT on April 8, 2026, Bexar, San Antonio District. 2 bids received; low bid $32,786,223 by Relmco, Inc., -5.6% against the engineer's estimate of $34,738,196.

Owner
Texas DOT
Letting
08 APR 2026
Pay items
55
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Relmco, Inc.$32,786,223Low-6.0%
2Ragle Construction, Inc.$39,838,291+22%+15%
TxDOT contract A00200988: bids by rank

Engineer's estimate: $34,738,196.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Relmco, Inc.2. Ragle Construction, Inc.
1Removing concrete (riprap) (104-7007)CY76$200.00$100.00$205.00
2Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY524$18.85$50.00$20.00
3Removing concrete (curb) (104-7016)LF521$5.18$30.00$9.50
4Removing concrete (rail) (104-7036)LF30$43.47$150.00$50.00
5Cut & restore asphalt paving (400-7008)SY210$200.00$150.00$110.00
6Flowable backfill (401-7001)CY31$250.00$165.00$470.00
7Trench excavation protection (402-7001)LF1,412$36.00$15.00$9.00
8Retaining wall (MSE) (423-7001)SF3,151$85.00$95.00
9Retaining wall (spread footing) (423-7015)SF550$110.00$60.00$175.00
10Riprap (concrete)(5 in) (432-7002)CY95$575.00$525.00$650.00
11Riprap (mow strip)(4 in) (432-7013)CY0.40$3,500.00$4,350.00
12Rail (handrail)(type F) (450-7063)LF75$150.00$210.00$230.00
13Concrete box culvert (5 FT X 4 FT) (462-7008)LF1,170$595.33$739.00$610.00
14Concrete box culvert (6 FT X 3 FT) (462-7011)LF33$751.80$1,445.00
15Junction box(complete)(PJB)(8FTX8FT) (465-7012)EACH2$14,850$24,920$28,000
16Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160)EACH1$7,500.00$10,570$8,775.00
17Ring & cover (471-7005)EACH3$2,000.00$1,500.00$1,520.00
18Removing structure (inlet) (496-7002)EACH1$875.00$2,500.00$915.00
19Removing structure (headwall) (496-7006)EACH1$1,500.00$1,750.00
20Removing structure (pipe) (496-7007)LF1,170$20.05$15.00$26.00
21Mobilization (500-7001)LS1$3,141,553$2,900,000$4,000,000
22Barricades, signs and traffic handling (502-7001)MO40$2,000.00$3,500.00$5,000.00
23Portable changeable message sign (503-7001)DAY35$57.93$300.00$150.00
24TMA (stationary) (505-7001)DAY35$145.63$300.00$450.00
25Rock filter dams (install) (type 2) (506-7002)LF20$46.54$50.00$80.00
26Temporary sediment control fence (install) (506-7039)LF1,105$3.03$15.00$5.00
27Biodegradable erosion control logs (install) (12") (506-7044)LF914$12.00$15.00$7.50
28Biodegradable erosion control logs (remove) (506-7046)LF914$1.61$8.00$2.00
29Permanent CTB (F-shape) (type 1) (514-7013)LF30$75.00$300.00$120.00
30Concrete curb (type I) (529-7001)LF252$15.47$35.00$50.00
31Driveways (concrete) (530-7006)SY16$135.00$100.00$450.00
32Concrete sidewalks (5") (531-7002)SY126$64.35$75.00$150.00
33Metal W-beam guard fence (timber post) (540-7001)LF305$27.36$34.10$35.00
34Remove metal beam guard fence (542-7001)LF30$5.13$3.30$5.00
35Guardrail end treatment (install) (544-7001)EACH1$4,351.60$2,850.00
36Abate asbestos (conduit) (5009-7002)LF17$200.00$200.00$150.00
37Temporary blow-off (complete)(2") (7040-7004)EACH2$1,500.00$3,500.00$4,880.00
38Tie-in (complete)(8") (7040-7005)EACH2$4,000.00$10,500$26,500
39Concrete encasement (7040-7010)CY1$2,500.00$5,500.00$740.00
40Ductile iron fittings (7040-7013)TON0.26$12,000$30,000$13,250
41Gate valve and box (complete)(8") (7040-7015)EACH1$3,000.00$5,500.00$6,450.00
42Hydrostatic pressure test (7040-7017)EACH1$6,000.06$500.00$3,750.00
43Pipe water main (PVC)(8") (7040-7018)LF50$215.00$100.00$205.00
44NGP (main)(2" plastic W/TW)(open cut) (7048-7001)LF202$200.00$176.00$265.00
45NGP (remove abandoned main)(2") (7048-7004)LF224$100.00$88.00$65.00
46NGP mobilization (7048-7009)LS1$11,080$5,500.00$30,000
47NGP (main)(4'' plastic W/TW)(open cut) (7048-7013)LF327$200.00$919.60$115.00
48NGP (remove abandoned main)(4'') (7048-7023)LF23$100.00$630.30$80.00
49NGP service (RE-run) (7048-7043)EACH5$3,600.00$15,400$19,000
50Storm water pump station # 1 (7096-7001)EACH1$4,937,230$3,977,650$5,400,000
51Storm water pump station # 2 (7096-7002)EACH1$5,942,117$3,977,650$7,600,000
52Storm water pump station # 3 (7096-7003)EACH1$5,109,579$3,977,650$6,400,000
53Storm water pump station # 4 (7096-7004)EACH1$3,985,129$3,977,650$4,300,000
54Storm water pump station #9 (7096-7009)EACH1$7,790,500$10,000,000
55Storm water pump station #10 (7096-7010)EACH1$3,977,650$100,000
TxDOT contract A00200988: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy