TxDOT contract A00221262 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, SH0208 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT). Let by Texas DOT on September 3, 2026, Tom Green, San Angelo District. 11 bids received; low bid $1,383,383 by The Truesdell Corporation, +4.1% against the engineer's estimate of $1,329,347.
- Owner
- Texas DOT
- Letting
- 03 SEP 2026
- Pay items
- 37
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Truesdell Corporation | $1,383,383 | Low | +4.0% |
| 2 | Structural Integrity Group LLC | $1,384,919 | 0.0% | +4.0% |
| 3 | MPB, Inc. | $1,461,026 | +6.0% | +10% |
| 4 | Relmco, Inc. | $1,478,786 | +7.0% | +11% |
| 5 | Gibson & Associates, Inc. | $1,530,864 | +11% | +15% |
| 6 | Roy Jorgensen Associates, Inc. | $1,560,604 | +13% | +17% |
| 7 | Blacksmith Ventures LLC | $1,563,873 | +13% | +18% |
| 8 | Scott Tucker Construction Company, LLC | $1,657,733 | +20% | +25% |
| 9 | Ragle Construction, Inc. | $1,720,028 | +24% | +29% |
| 10 | Cross Plus Construction, LLC | $1,780,955 | +29% | +34% |
| 11 | Ti-Zack Concrete, LLC | $1,790,803 | +29% | +35% |
Engineer's estimate: $1,329,347.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. The Truesdell Corporation | 2. Structural Integrity Group LLC | 3. MPB, Inc. | 4. Relmco, Inc. | 5. Gibson & Associates, Inc. | 6. Roy Jorgensen Associates, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(OC)(type B) (132-7003) | CY | 332 | $50.00 | $125.00 | $70.00 | $85.00 | $40.00 | $68.20 | $25.00 |
| 2 | Flowable backfill (401-7001) | CY | 10 | $350.00 | $555.00 | $450.00 | $310.00 | $220.00 | $600.00 | $200.00 |
| 3 | Penetrating concrete surface treatment (428-7001) | SY | 2,974 | $15.00 | $18.00 | $10.00 | $11.20 | $10.50 | $11.00 | $18.00 |
| 4 | Concrete structure repair (epoxy mortar) (429-7002) | SF | 40 | $150.00 | $185.00 | $500.00 | $135.00 | $225.00 | $148.50 | $200.00 |
| 5 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 195 | $130.00 | $165.00 | $210.00 | $125.00 | $195.00 | $176.00 | $180.00 |
| 6 | Concrete structure repair (standard) (429-7009) | SF | 45 | $138.00 | $155.00 | $335.00 | $125.00 | $205.00 | $141.90 | $150.00 |
| 7 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 203 | $150.00 | $201.00 | $259.00 | $275.00 | $215.00 | $275.00 | $200.00 |
| 8 | Riprap (stone common)(dry)(24 in) (432-7034) | CY | 96 | $180.00 | $215.00 | $240.00 | $335.00 | $215.00 | $286.00 | $275.00 |
| 9 | Cleaning & sealing existing joint (SEJ) (438-7013) | LF | 943 | $45.00 | $40.00 | $63.00 | $56.00 | $38.00 | $88.00 | $70.00 |
| 10 | Multi-layer polymer overlay (439-7014) | SY | 13,010 | $40.00 | $28.00 | $30.50 | $38.75 | $41.00 | $31.00 | $45.00 |
| 11 | Clean & paint existing STR (system II) (446-7002) | LS | 1 | $309,000 | $355,000 | $353,280 | $371,000 | $369,894 | $369,600 | $388,608 |
| 12 | Pipe (galvanized) (4 in X 5IN) (481-7047) | LF | 32 | $140.00 | $100.00 | $325.00 | $380.00 | $150.00 | $550.00 | $100.00 |
| 13 | Shot blasting (483-7016) | SY | 13,010 | $5.00 | $3.00 | $3.00 | $5.00 | $3.00 | $3.30 | $4.00 |
| 14 | Mobilization (500-7001) | LS | 1 | $60,000 | $179,204 | $110,500 | $75,000 | $125,000 | $210,000 | $80,000 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $8,000.00 | $6,000.00 | $1.00 | $3,000.00 | $3,500.00 | $7,250.00 | $5,000.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 50 | $300.00 | $300.00 | $250.00 | $100.00 | $250.00 | $350.00 | $1.00 |
| 17 | TMA (mobile operation) (505-7003) | DAY | 2 | $250.00 | $2,100.00 | $250.00 | $100.00 | $250.00 | $500.00 | $1.00 |
| 18 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 500 | $1.00 | $3.20 | $3.00 | $3.15 | $3.30 | $3.30 | $3.90 |
| 19 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 380 | $3.50 | $5.30 | $5.00 | $5.25 | $5.50 | $5.50 | $6.50 |
| 20 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 840 | $0.30 | $2.15 | $2.00 | $2.10 | $2.20 | $2.20 | $2.60 |
| 21 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 1,500 | $0.30 | $2.15 | $2.00 | $2.10 | $2.20 | $2.20 | $2.60 |
| 22 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 500 | $0.50 | $2.15 | $2.00 | $2.10 | $2.20 | $2.20 | $2.60 |
| 23 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 380 | $1.75 | $3.20 | $3.00 | $3.15 | $3.20 | $3.30 | $3.90 |
| 24 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 2,900 | $0.30 | $2.15 | $2.00 | $2.10 | $2.20 | $2.20 | $2.60 |
| 25 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 840 | $0.50 | $3.20 | $3.00 | $3.15 | $3.30 | $3.30 | $3.90 |
| 26 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,500 | $0.50 | $3.20 | $3.00 | $3.15 | $3.30 | $3.30 | $3.90 |
| 27 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 2,900 | $0.50 | $3.20 | $3.00 | $3.15 | $3.30 | $3.30 | $3.90 |
| 28 | Reflectorized pavement marker type I-C (672-7002) | EACH | 20 | $3.50 | $16.00 | $15.00 | $15.75 | $16.50 | $16.50 | $19.50 |
| 29 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 40 | $3.50 | $16.00 | $15.00 | $15.75 | $16.50 | $16.50 | $19.50 |
| 30 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 20 | $3.50 | $16.00 | $15.00 | $15.75 | $16.50 | $16.50 | $19.50 |
| 31 | Eliminating existing PM & markers (4") (677-7001) | LF | 600 | $0.50 | $3.20 | $3.00 | $3.15 | $3.30 | $3.30 | $3.90 |
| 32 | Driftwood removal (735-7060) | CY | 27 | $75.00 | $110.00 | $240.00 | $60.00 | $300.00 | $530.00 | $100.00 |
| 33 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 0.25 | $1,800.00 | $16,500 | $1,150.00 | $2,000.00 | $40,000 | $10,000 | $10,000 |
| 34 | CNC crack repair (discrete)(gravity) (780-7001) | LF | 140 | $25.00 | $45.00 | $30.00 | $30.00 | $50.00 | $42.90 | $50.00 |
| 35 | CNC crack repair (discrete)(inject) (780-7002) | LF | 214 | $60.00 | $55.00 | $90.00 | $65.00 | $50.00 | $66.00 | $75.00 |
| 36 | Steel bridge zone painting ref STR #1 (4010-7001) | EACH | 1 | $75,000 | $75,000 | $72,000 | $76,000 | $75,600 | $71,500 | $85,000 |
| 37 | Stone masonry repair (5013-7001) | SF | 470 | $45.00 | $21.00 | $120.00 | $85.00 | $50.00 | $25.00 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 3, 2026. Compiled by Mirage Metrics.