TxDOT contract A00206568 bid tabulation
Hazard Elimination & Safety, FM 3016 (FM 228 to CR 1685). Let by Texas DOT on July 1, 2026, Houston, Lufkin District. 5 bids received; low bid $3,814,102 by L. S. Equipment Co., Inc., -7.1% against the engineer's estimate of $4,104,553.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 87
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L. S. Equipment Co., Inc. | $3,814,102 | Low | -7.0% |
| 2 | Pinto Construction Co., Inc. | $3,853,111 | +1.0% | -6.0% |
| 3 | Big Creek Construction, LTD. | $3,925,688 | +3.0% | -4.0% |
| 4 | A. L. Helmcamp, Inc. | $4,041,534 | +6.0% | -2.0% |
| 5 | Drewery Construction Company, Incorporated | $4,166,237 | +9.0% | +2.0% |
Engineer's estimate: $4,104,553.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. L. S. Equipment Co., Inc. | 2. Pinto Construction Co., Inc. | 3. Big Creek Construction, LTD. | 4. A. L. Helmcamp, Inc. | 5. Drewery Construction Company, Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 134.45 | $2,000.00 | $1,200.00 | $892.50 | $1,000.00 | $1,000.00 | $1,455.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 94 | $28.00 | $9.75 | $26.25 | $27.50 | $26.00 | $40.00 |
| 3 | Subgr widen (OC) (112-7001) | STA | 134.45 | $400.00 | $375.00 | $415.62 | $650.00 | $193.00 | $335.00 |
| 4 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 3,038 | $25.00 | $19.50 | $20.11 | $26.00 | $16.00 | $24.00 |
| 5 | Backfill (type B) (134-7002) | STA | 134.45 | $200.00 | $195.00 | $191.70 | $110.00 | $450.00 | $148.00 |
| 6 | Blading (150-7001) | STA | 134.45 | $350.00 | $100.00 | $160.38 | $110.00 | $250.00 | $210.00 |
| 7 | Spec excavation work (hyd excavator) (158-7002) | HR | 164 | $200.00 | $100.00 | $125.00 | $165.00 | $160.00 | $247.00 |
| 8 | Block sodding (162-7002) | SY | 1,240 | $6.50 | $5.75 | $6.30 | $6.50 | $6.30 | $6.00 |
| 9 | Broadcast seed (temporary_warm) (164-7005) | SY | 52,055 | $0.15 | $0.11 | $0.12 | $0.12 | $0.12 | $0.12 |
| 10 | Broadcast seed (temporary_cool) (164-7006) | SY | 52,054 | $0.15 | $0.12 | $0.13 | $0.12 | $0.12 | $0.13 |
| 11 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 104,109 | $0.65 | $0.50 | $0.58 | $0.55 | $0.53 | $0.53 |
| 12 | Vegetative watering (168-7001) | TGL | 4,187.70 | $5.00 | $0.01 | $0.01 | $1.00 | $1.00 | $0.01 |
| 13 | Sprinkling (dust control) (204-7001) | TGL | 419 | $9.00 | $0.01 | $0.01 | $40.00 | $1.00 | $0.01 |
| 14 | FL BS (roadway del) (type D GR 3) (247-7210) | TON | 18,939 | $50.00 | $55.00 | $53.95 | $52.00 | $45.00 | $63.50 |
| 15 | Cement (275-7001) | TON | 753 | $255.00 | $220.00 | $206.99 | $250.00 | $225.00 | $275.00 |
| 16 | Cement TRT (existing material & new base)(12") (275-7009) | SY | 41,829 | $3.50 | $3.50 | $3.29 | $3.50 | $3.00 | $3.45 |
| 17 | Emuls asphalt (erosion control)(SS-1) (314-7008) | GAL | 1,793 | $4.00 | $4.50 | $4.91 | $4.50 | $4.50 | $4.20 |
| 18 | Asphalt (RC-250) (316-7032) | TON | 45 | $1,176.00 | $1,240.00 | $1,338.70 | $1,500.00 | $1,260.00 | $1,520.00 |
| 19 | Asphalt (AC-15P or CRS-2P) (316-7088) | TON | 75 | $1,035.00 | $1,050.00 | $1,035.48 | $1,150.00 | $1,000.00 | $1,135.00 |
| 20 | Aggregate (type E or L, GR-5) (316-7254) | CY | 299 | $244.00 | $152.00 | $168.28 | $185.00 | $300.00 | $183.00 |
| 21 | Aggregate (type E or L, PE or PL GR 4) (316-7268) | CY | 310 | $194.00 | $162.00 | $175.72 | $215.00 | $275.00 | $190.00 |
| 22 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 4,602 | $150.00 | $165.00 | $164.67 | $155.00 | $170.00 | $165.00 |
| 23 | Cem stabil BKFL (400-7010) | CY | 5 | $225.00 | $225.00 | $367.50 | $385.00 | $370.00 | $368.00 |
| 24 | Trench excavation protection (402-7001) | LF | 6 | $5.00 | $18.00 | $10.50 | $17.00 | $10.00 | $21.00 |
| 25 | Temporary special shoring (403-7001) | SF | 350 | $45.00 | $50.00 | $44.10 | $46.00 | $44.00 | $42.00 |
| 26 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 8 | $240.00 | $285.00 | $283.50 | $360.00 | $285.00 | $284.00 |
| 27 | Class C concrete (collar) (420-7061) | EACH | 3 | $1,150.00 | $1,800.00 | $525.00 | $550.00 | $525.00 | $1,943.00 |
| 28 | Riprap (stone common)(dry)(24 in) (432-7034) | CY | 10 | $250.00 | $250.00 | $315.00 | $330.00 | $315.00 | $315.00 |
| 29 | RC pipe (CL III)(18 in) (464-7003) | LF | 676 | $73.00 | $60.00 | $74.55 | $78.00 | $75.00 | $63.00 |
| 30 | RC pipe (CL III)(24 in) (464-7005) | LF | 18 | $115.00 | $85.00 | $110.25 | $115.00 | $110.00 | $94.50 |
| 31 | RC pipe (CL III)(30 in) (464-7007) | LF | 52 | $212.00 | $119.50 | $189.00 | $200.00 | $190.00 | $157.50 |
| 32 | Headwall (CH - FW - 0) (diameter= 48 in) (466-7011) | EACH | 1 | $11,000 | $9,800.00 | $9,660.00 | $10,000 | $9,660.00 | $10,000 |
| 33 | Headwall (CH - FW - 45) (diameter= 18 in) (466-7048) | EACH | 1 | $4,190.00 | $4,500.00 | $5,355.00 | $5,600.00 | $5,355.00 | $8,900.00 |
| 34 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 1 | $8,100.00 | $5,750.00 | $6,825.00 | $7,150.00 | $6,825.00 | $8,400.00 |
| 35 | Headwall (CH - PW - 0) (diameter= 27 in) (466-7102) | EACH | 1 | $8,500.00 | $6,250.00 | $7,245.00 | $7,500.00 | $7,245.00 | $10,500 |
| 36 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $8,500.00 | $7,500.00 | $9,450.00 | $10,000 | $9,450.00 | $12,100 |
| 37 | Headwall (CH - PW - 0) (diameter= 33 in) (466-7104) | EACH | 1 | $16,500 | $8,800.00 | $9,975.00 | $10,500 | $9,975.00 | $12,600 |
| 38 | Headwall (CH - PW - S) (diameter= 54 in) (466-7123) | EACH | 1 | $21,000 | $17,000 | $15,750 | $16,500 | $15,750 | $15,750 |
| 39 | Headwall (CH - PW - S) (diameter= 72 in) (466-7126) | EACH | 2 | $21,600 | $27,000 | $22,050 | $23,000 | $22,050 | $19,000 |
| 40 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 1 | $1,037.00 | $850.00 | $892.50 | $925.00 | $900.00 | $810.00 |
| 41 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 2 | $1,170.00 | $875.00 | $997.50 | $1,050.00 | $1,000.00 | $888.00 |
| 42 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 32 | $1,000.00 | $900.00 | $997.50 | $1,050.00 | $1,000.00 | $888.00 |
| 43 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 1 | $1,800.00 | $1,300.00 | $1,575.00 | $1,650.00 | $1,575.00 | $1,310.00 |
| 44 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 3 | $2,590.00 | $1,900.00 | $1,758.75 | $1,850.00 | $1,760.00 | $1,810.00 |
| 45 | Clean existing culverts (480-7001) | EACH | 2 | $700.00 | $1,000.00 | $945.00 | $1,000.00 | $945.00 | $1,470.00 |
| 46 | Removing structure (pipe) (496-7037) | EACH | 15 | $800.00 | $10.00 | $315.00 | $330.00 | $315.00 | $368.00 |
| 47 | Mobilization (500-7001) | LS | 1 | $340,000 | $300,000 | $400,000 | $390,000 | $300,000 | $355,000 |
| 48 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $4,500.00 | $3,000.00 | $1,500.00 | $1,350.00 | $15,000 | $2,425.00 |
| 49 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $5,000.00 | $5,000.00 | $15,000 | $15,000 | $5,000.00 |
| 50 | TMA (stationary) (505-7001) | DAY | 164 | $225.00 | $150.00 | $250.00 | $200.00 | $260.00 | $155.00 |
| 51 | TMA (mobile operation) (505-7003) | DAY | 10 | $184.00 | $150.00 | $50.00 | $750.00 | $600.00 | $278.00 |
| 52 | Rock filter dams (install) (type 2) (506-7002) | LF | 2,216 | $42.00 | $31.75 | $31.98 | $35.00 | $40.00 | $34.00 |
| 53 | Rock filter dams (remove) (506-7011) | LF | 2,216 | $13.00 | $4.00 | $8.95 | $10.00 | $10.00 | $9.50 |
| 54 | Construction exits (install) (type 1) (506-7020) | SY | 180 | $40.00 | $36.50 | $10.00 | $42.00 | $20.00 | $40.00 |
| 55 | Construction exits (remove) (506-7024) | SY | 180 | $16.00 | $8.00 | $6.00 | $17.00 | $5.00 | $17.00 |
| 56 | Temporary sediment control fence (install) (506-7039) | LF | 4,309 | $4.40 | $3.75 | $4.20 | $4.00 | $4.20 | $3.70 |
| 57 | Temporary sediment control fence (remove) (506-7041) | LF | 4,309 | $1.10 | $0.25 | $0.48 | $0.55 | $0.25 | $0.55 |
| 58 | Driveways (concrete) (530-7006) | SY | 94 | $100.00 | $170.00 | $152.25 | $165.00 | $155.00 | $134.00 |
| 59 | Driveways (ACP) (530-7010) | SY | 2,470 | $72.00 | $70.00 | $56.60 | $45.00 | $110.00 | $58.00 |
| 60 | Turnouts (surface treat) (530-7019) | SY | 202 | $30.00 | $92.00 | $88.64 | $60.00 | $30.00 | $85.00 |
| 61 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 26,890 | $1.00 | $0.18 | $0.30 | $0.22 | $0.25 | $0.10 |
| 62 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 13,445 | $0.50 | $0.40 | $0.30 | $0.22 | $0.25 | $0.15 |
| 63 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 1 | $710.00 | $735.00 | $1,050.00 | $550.00 | $525.00 | $1,050.00 |
| 64 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 6 | $270.00 | $300.00 | $157.50 | $150.00 | $137.00 | $158.00 |
| 65 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 2 | $290.00 | $340.00 | $252.00 | $175.00 | $158.00 | $252.00 |
| 66 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 1 | $5,600.00 | $11,000 | $9,397.50 | $9,250.00 | $9,400.00 | $9,400.00 |
| 67 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 400 | $18.00 | $11.00 | $9.98 | $21.00 | $10.00 | $10.00 |
| 68 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 75 | $22.00 | $25.50 | $26.78 | $30.00 | $27.00 | $27.00 |
| 69 | Electrical conductor (no.8) bare (620-7007) | LF | 523 | $2.00 | $2.30 | $2.42 | $3.50 | $2.40 | $2.45 |
| 70 | Electrical conductor (no.8) insulated (620-7008) | LF | 998 | $2.00 | $2.50 | $2.63 | $3.75 | $2.60 | $2.65 |
| 71 | Ground box type D (162922)W/apron (624-7008) | EACH | 4 | $1,950.00 | $1,600.00 | $1,470.00 | $1,800.00 | $1,470.00 | $1,470.00 |
| 72 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $8,450.00 | $7,500.00 | $7,612.50 | $11,500 | $7,610.00 | $7,615.00 |
| 73 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $800.00 | $845.00 | $787.50 | $880.00 | $840.00 | $788.00 |
| 74 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 13 | $520.00 | $498.00 | $472.50 | $750.00 | $710.00 | $472.00 |
| 75 | Remove SM RD SN sup&AM (644-7073) | EACH | 15 | $120.00 | $105.00 | $84.00 | $165.00 | $158.00 | $130.00 |
| 76 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 20 | $90.00 | $90.00 | $47.25 | $88.00 | $84.00 | $47.00 |
| 77 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 1 | $15.00 | $43.00 | $5.25 | $15.00 | $14.00 | $5.25 |
| 78 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 4 | $15.00 | $43.00 | $10.50 | $13.50 | $13.00 | $11.00 |
| 79 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 53,780 | $0.40 | $0.33 | $0.32 | $0.35 | $0.32 | $0.32 |
| 80 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 6,051 | $1.80 | $2.50 | $2.36 | $2.00 | $1.07 | $1.40 |
| 81 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,689 | $0.80 | $2.00 | $2.50 | $2.00 | $1.07 | $2.50 |
| 82 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 26,792 | $0.55 | $0.60 | $0.58 | $0.60 | $0.58 | $0.60 |
| 83 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 1,654 | $0.55 | $0.66 | $0.63 | $0.65 | $0.63 | $0.65 |
| 84 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 19,996 | $0.55 | $0.60 | $0.58 | $0.60 | $0.58 | $0.60 |
| 85 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 13 | $12.00 | $28.00 | $26.25 | $27.50 | $26.25 | $26.00 |
| 86 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 337 | $4.00 | $6.20 | $6.30 | $6.50 | $6.30 | $6.30 |
| 87 | Bonding course (3007-7001) | GAL | 2,092 | $6.00 | $6.25 | $6.30 | $4.50 | $5.00 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.