TxDOT contract A00196231 bid tabulation
Rehabilitate Existing Roadway, SH 11 (0.1 Mi. E. of US 259 to Cass C/L). Let by Texas DOT on August 5, 2026, Morris, Atlanta District. 7 bids received; low bid $10,759,105 by H. H. Howard & Sons, Inc., -8.5% against the engineer's estimate of $11,759,396.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 96
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | H. H. Howard & Sons, Inc. | $10,759,105 | Low | -9.0% |
| 2 | Longview Bridge and Road, LTD. | $11,611,380 | +8.0% | -1.0% |
| 3 | East Texas Bridge, Inc. | $11,645,262 | +8.0% | -1.0% |
| 4 | H. V. Caver, Inc. | $12,165,388 | +13% | +3.0% |
| 5 | RK Hall, LLC | $12,349,864 | +15% | +5.0% |
| 6 | L. S. Equipment Co., Inc. | $12,846,198 | +19% | +9.0% |
| 7 | Drake Companies LLC | $13,998,024 | +30% | +19% |
Engineer's estimate: $11,759,396.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. H. H. Howard & Sons, Inc. | 2. Longview Bridge and Road, LTD. | 3. East Texas Bridge, Inc. | 4. H. V. Caver, Inc. | 5. RK Hall, LLC | 6. L. S. Equipment Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 159.90 | $1,000.00 | $2,500.00 | $7,000.00 | $4,400.00 | $4,000.00 | $4,055.10 | $4,000.00 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 2,949 | $11.80 | $10.00 | $7.00 | $10.00 | $19.50 | $19.34 | $10.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 14 | $25.00 | $40.00 | $56.00 | $20.00 | $50.00 | $73.41 | $125.00 |
| 4 | Removing concrete (medians) (104-7008) | SY | 3,933 | $46.20 | $15.00 | $8.00 | $12.00 | $20.00 | $12.34 | $85.00 |
| 5 | Removing concrete (driveways) (104-7011) | SY | 226 | $16.00 | $15.00 | $30.00 | $15.00 | $20.00 | $15.75 | $25.00 |
| 6 | Removing concrete (curb) (104-7016) | LF | 4,698 | $9.50 | $5.00 | $4.50 | $6.00 | $5.75 | $7.88 | $10.00 |
| 7 | Embankment (vehicle)(OC)(type A) (132-7013) | CY | 658 | $16.00 | $20.00 | $40.00 | $16.00 | $50.00 | $63.00 | $30.00 |
| 8 | Backfill (type B) (134-7002) | STA | 364 | $210.00 | $200.00 | $150.00 | $200.00 | $250.00 | $130.08 | $200.00 |
| 9 | Blading (150-7003) | LF | 975 | $47.00 | $10.00 | $1.00 | $3.00 | $2.50 | $315.00 | $25.00 |
| 10 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 28,422 | $0.63 | $0.50 | $0.57 | $0.53 | $0.50 | $0.50 | $0.50 |
| 11 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 14,211 | $0.64 | $0.50 | $0.56 | $0.50 | $0.47 | $0.47 | $0.49 |
| 12 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 14,211 | $0.64 | $0.50 | $0.56 | $0.50 | $0.47 | $0.47 | $0.49 |
| 13 | Vegetative watering (168-7001) | TGL | 2,724 | $8.81 | $1.00 | $15.00 | $4.00 | $0.01 | $39.68 | $0.01 |
| 14 | FL BS (roadway del) (type D GR 4) (in vehicle) (247-7233) | CY | 1,573 | $6.00 | $80.00 | $94.00 | $115.00 | $60.00 | $63.00 | $155.00 |
| 15 | Cement (275-7001) | TON | 2,426 | $227.00 | $230.00 | $256.00 | $245.00 | $220.00 | $262.50 | $300.00 |
| 16 | Cement TRT (existing material & new base)(10") (275-7008) | SY | 118,332 | $5.00 | $3.00 | $2.00 | $2.30 | $5.50 | $7.04 | $4.00 |
| 17 | Prime coat & blotter (MC-30) (310-7010) | GAL | 11,833 | $8.00 | $6.00 | $6.80 | $5.50 | $7.70 | $8.14 | $8.00 |
| 18 | Asphalt (AC-20-5TR) (316-7007) | GAL | 42,600 | $3.25 | $6.00 | $6.50 | $4.50 | $6.60 | $6.56 | $6.00 |
| 19 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 845 | $64.40 | $200.00 | $248.00 | $205.00 | $187.09 | $115.50 | $190.00 |
| 20 | SP mixes SP-C PG70-22 (344-7019) | TON | 19,525 | $140.00 | $125.68 | $134.00 | $135.00 | $127.00 | $128.26 | $128.82 |
| 21 | SP mixes SP-C sac-A PG76-22 (344-7030) | TON | 27,088 | $145.00 | $126.88 | $136.00 | $137.00 | $129.00 | $129.48 | $129.42 |
| 22 | Tack coat (344-7077) | GAL | 24,111 | $4.10 | $6.00 | $4.00 | $4.75 | $6.10 | $4.74 | $7.00 |
| 23 | Flexible pavement structure repair(4") (351-7003) | SY | 4,000 | $29.08 | $40.00 | $38.00 | $45.00 | $38.33 | $38.03 | $50.00 |
| 24 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 5,266 | $3.88 | $5.00 | $2.00 | $6.85 | $4.25 | $6.23 | $6.50 |
| 25 | Planing asphalt concrete pavement(2") (354-7051) | SY | 114,400 | $2.60 | $2.70 | $1.75 | $2.65 | $1.60 | $2.73 | $4.00 |
| 26 | Planing asphalt concrete pavement (0.5") (354-7102) | SY | 73,468 | $2.00 | $1.50 | $1.35 | $1.67 | $1.20 | $1.82 | $3.25 |
| 27 | Riprap (mow strip)(4 in) (432-7013) | CY | 336 | $400.00 | $615.00 | $514.00 | $595.00 | $500.00 | $735.00 | $660.00 |
| 28 | Cleaning and sealing existing joints (438-7001) | LF | 400 | $50.00 | $60.00 | $45.00 | $45.00 | $38.00 | $47.25 | $75.00 |
| 29 | Cleaning existing joints (438-7008) | LF | 100 | $40.00 | $55.00 | $37.00 | $37.00 | $25.00 | $50.40 | $75.00 |
| 30 | RC pipe (CL III)(18 in) (464-7003) | LF | 192 | $52.94 | $85.00 | $82.00 | $57.00 | $48.00 | $68.25 | $55.00 |
| 31 | RC pipe (CL III)(24 in) (464-7005) | LF | 52 | $62.66 | $200.00 | $109.00 | $77.00 | $81.00 | $94.50 | $80.00 |
| 32 | RC pipe (CL III)(36 in) (464-7009) | LF | 4 | $164.48 | $250.00 | $220.00 | $150.00 | $130.00 | $204.75 | $125.00 |
| 33 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 21 | $728.05 | $850.00 | $1,000.00 | $875.00 | $795.00 | $892.50 | $950.00 |
| 34 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 6 | $1,953.57 | $1,000.00 | $1,450.00 | $1,325.00 | $1,225.00 | $1,575.00 | $1,200.00 |
| 35 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 1 | $6,573.18 | $10,000 | $5,700.00 | $6,000.00 | $6,446.25 | $7,875.00 | $7,500.00 |
| 36 | Adjusting inlets (479-7002) | EACH | 4 | $1,761.00 | $3,000.00 | $1,980.00 | $2,000.00 | $7,500.00 | $2,100.00 | $1,000.00 |
| 37 | Removing structure (set) (496-7004) | EACH | 1 | $203.00 | $100.00 | $900.00 | $400.00 | $500.00 | $210.00 | $400.00 |
| 38 | Removing structure (pipe) (496-7007) | LF | 124 | $17.06 | $10.00 | $22.00 | $12.00 | $20.00 | $10.50 | $20.00 |
| 39 | Mobilization (500-7001) | LS | 1 | $1,069,000 | $400,000 | $550,000 | $670,000 | $1,200,000 | $493,995 | $1,000,000 |
| 40 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $5,000.00 | $10,000 | $3,000.00 | $11,000 | $11,000 | $22,159 | $13,500 |
| 41 | Portable changeable message sign (503-7002) | EACH | 4 | $6,000.00 | $15,000 | $6,600.00 | $14,000 | $13,000 | $5,334.54 | $10,000 |
| 42 | TMA (stationary) (505-7001) | DAY | 227 | $85.00 | $100.00 | $200.00 | $200.00 | $200.00 | $432.55 | $250.00 |
| 43 | TMA (mobile operation) (505-7003) | DAY | 8 | $255.00 | $500.00 | $300.00 | $200.00 | $250.00 | $796.85 | $250.00 |
| 44 | Rock filter dams (install) (type 2) (506-7002) | LF | 100 | $44.84 | $40.00 | $64.00 | $37.00 | $35.00 | $35.70 | $37.00 |
| 45 | Rock filter dams (remove) (506-7011) | LF | 100 | $5.08 | $10.00 | $22.00 | $7.00 | $8.00 | $7.35 | $7.00 |
| 46 | Temporary sediment control fence (install) (506-7039) | LF | 1,600 | $3.67 | $5.00 | $4.40 | $4.00 | $3.60 | $3.68 | $3.65 |
| 47 | Temporary sediment control fence (remove) (506-7041) | LF | 1,600 | $0.97 | $1.00 | $1.10 | $0.50 | $0.60 | $0.53 | $0.50 |
| 48 | Concrete curb & gutter (type II) (529-7009) | LF | 140 | $38.00 | $70.00 | $49.00 | $38.00 | $23.00 | $42.00 | $110.00 |
| 49 | Driveways (concrete) (530-7006) | SY | 226 | $110.00 | $100.00 | $155.00 | $110.00 | $141.00 | $105.00 | $125.00 |
| 50 | Driveways (ACP) (530-7010) | SY | 3,895 | $45.00 | $60.00 | $45.00 | $35.00 | $100.00 | $42.67 | $50.00 |
| 51 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 45,066 | $0.34 | $0.30 | $0.30 | $0.28 | $0.25 | $0.26 | $0.32 |
| 52 | Metal W-beam guard fence (timber post) (540-7001) | LF | 6,225 | $30.00 | $22.00 | $24.20 | $23.50 | $22.00 | $23.10 | $25.00 |
| 53 | Metal W-beam guard fence (steel post) (540-7002) | LF | 75 | $32.00 | $91.00 | $91.00 | $90.00 | $83.00 | $87.15 | $90.00 |
| 54 | Downstream anchor terminal section (540-7015) | EACH | 10 | $1,180.50 | $1,330.00 | $1,350.00 | $1,325.00 | $1,230.00 | $1,291.50 | $1,500.00 |
| 55 | Metal thrie-beam guard fence (timber post) (540-7019) | EACH | 12 | $1,403.00 | $1,650.00 | $1,760.00 | $1,800.00 | $1,600.00 | $1,575.00 | $1,800.00 |
| 56 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 12 | $831.00 | $585.00 | $715.00 | $700.00 | $650.00 | $682.50 | $750.00 |
| 57 | Remove metal beam guard fence (542-7001) | LF | 6,175 | $2.96 | $3.00 | $1.65 | $1.65 | $1.50 | $1.58 | $3.00 |
| 58 | Remove downstream anchor terminal (542-7003) | EACH | 10 | $158.50 | $160.00 | $165.00 | $165.00 | $150.00 | $157.50 | $175.00 |
| 59 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 10 | $234.94 | $155.00 | $165.00 | $165.00 | $750.00 | $733.76 | $175.00 |
| 60 | Guardrail end treatment (install) (544-7001) | EACH | 28 | $3,800.00 | $3,200.00 | $3,325.00 | $3,250.00 | $3,020.00 | $3,171.00 | $3,250.00 |
| 61 | Guardrail end treatment (remove) (544-7003) | EACH | 18 | $148.60 | $220.00 | $165.00 | $165.00 | $150.00 | $157.50 | $175.00 |
| 62 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 17 | $275.00 | $340.00 | $220.00 | $215.00 | $220.00 | $231.00 | $245.00 |
| 63 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 2 | $293.33 | $400.00 | $245.00 | $240.00 | $240.00 | $252.00 | $280.00 |
| 64 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 5 | $1,075.00 | $800.00 | $750.00 | $730.00 | $750.00 | $787.50 | $805.00 |
| 65 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 12 | $851.82 | $875.00 | $800.00 | $780.00 | $800.00 | $840.00 | $875.00 |
| 66 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $1,047.22 | $1,300.00 | $1,100.00 | $1,100.00 | $990.00 | $1,039.50 | $1,050.00 |
| 67 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 20 | $777.83 | $1,100.00 | $1,320.00 | $1,300.00 | $990.00 | $1,039.50 | $1,050.00 |
| 68 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 65 | $427.14 | $550.00 | $475.00 | $465.00 | $450.00 | $472.50 | $475.00 |
| 69 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 13 | $542.75 | $550.00 | $540.00 | $525.00 | $500.00 | $525.00 | $525.00 |
| 70 | Remove SM RD SN sup&AM (644-7073) | EACH | 99 | $110.00 | $150.00 | $110.00 | $110.00 | $100.00 | $105.00 | $105.00 |
| 71 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 91 | $14.60 | $45.00 | $43.00 | $45.00 | $39.00 | $40.95 | $45.00 |
| 72 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 103 | $31.30 | $45.00 | $44.00 | $45.00 | $40.00 | $42.00 | $45.00 |
| 73 | Remove delin & object marker assms (658-7078) | EACH | 103 | $18.37 | $15.00 | $16.50 | $16.50 | $10.00 | $10.50 | $12.00 |
| 74 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 11,850 | $0.30 | $0.27 | $0.39 | $0.27 | $0.35 | $0.26 | $0.40 |
| 75 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 47,306 | $0.32 | $0.27 | $0.28 | $0.27 | $0.25 | $0.26 | $0.32 |
| 76 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 11,850 | $0.36 | $0.27 | $0.38 | $0.27 | $0.35 | $0.26 | $0.40 |
| 77 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 47,306 | $0.31 | $0.27 | $0.28 | $0.27 | $0.25 | $0.26 | $0.32 |
| 78 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 11,850 | $1.19 | $1.25 | $1.50 | $2.25 | $3.00 | $2.31 | $1.50 |
| 79 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 11,850 | $0.55 | $1.25 | $1.50 | $2.25 | $3.00 | $2.24 | $1.50 |
| 80 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,183 | $1.50 | $5.00 | $1.50 | $1.50 | $1.00 | $1.77 | $2.00 |
| 81 | Work zone pavement marking SHT terminal remove (Y)(6") (662-7123) | LF | 2,365 | $1.50 | $1.00 | $1.50 | $1.50 | $3.00 | $2.24 | $5.00 |
| 82 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 316 | $6.33 | $7.55 | $5.80 | $8.00 | $5.25 | $7.88 | $5.75 |
| 83 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 48,184 | $1.00 | $1.05 | $0.63 | $1.10 | $0.57 | $1.05 | $0.65 |
| 84 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 12,610 | $0.80 | $1.05 | $0.70 | $1.10 | $0.63 | $1.05 | $0.70 |
| 85 | All-wther PM type I (W)6"(DOT)(100MIL) (666-7311) | LF | 1,340 | $1.00 | $2.50 | $0.70 | $2.15 | $0.65 | $2.10 | $0.70 |
| 86 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 48,184 | $1.49 | $1.10 | $0.63 | $1.10 | $0.57 | $1.05 | $0.65 |
| 87 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 5,390 | $1.06 | $1.10 | $0.70 | $1.10 | $0.63 | $1.05 | $0.70 |
| 88 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 13,416 | $3.00 | $3.70 | $3.50 | $3.85 | $3.20 | $3.78 | $3.50 |
| 89 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 26 | $215.00 | $225.00 | $230.00 | $230.00 | $210.00 | $225.75 | $240.00 |
| 90 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 12 | $245.00 | $255.00 | $270.00 | $265.00 | $245.00 | $257.25 | $275.00 |
| 91 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 153 | $48.56 | $60.00 | $55.00 | $60.00 | $50.00 | $57.75 | $55.00 |
| 92 | Reflectorized pavement marker type I-C (672-7002) | EACH | 266 | $5.00 | $6.00 | $5.80 | $5.35 | $5.25 | $5.25 | $5.75 |
| 93 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 422 | $5.10 | $6.00 | $5.80 | $5.35 | $5.25 | $5.25 | $5.75 |
| 94 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 352 | $5.00 | $6.00 | $5.80 | $5.35 | $5.25 | $5.25 | $5.75 |
| 95 | Traffic button type Y (672-7008) | EACH | 26 | $5.00 | $5.00 | $4.35 | $4.30 | $3.95 | $4.20 | $4.05 |
| 96 | Install bridge identification numbers (4019-7001) | EACH | 8 | $500.00 | $500.00 | $330.00 | $235.00 | $1,800.00 | $525.00 | $1,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.