TxDOT contract A00184659 bid tabulation
Hazard Elimination & Safety, US 259 (BU 259 to FM 850). Let by Texas DOT on August 7, 2025, Rusk, Tyler District. 4 bids received; low bid $2,495,224 by True Roads Construction, LLC, -12% against the engineer's estimate of $2,849,485.
- Owner
- Texas DOT
- Letting
- 07 AUG 2025
- Pay items
- 54
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | True Roads Construction, LLC | $2,495,224 | Low | -12% |
| 2 | Reynolds & Kay, LTD. | $2,696,692 | +8.0% | -5.0% |
| 3 | L. S. Equipment Co., Inc. | $2,996,013 | +20% | +5.0% |
| 4 | Grey Sky Construction LLC | $3,409,967 | +37% | +20% |
Engineer's estimate: $2,849,485.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. True Roads Construction, LLC | 2. Reynolds & Kay, LTD. | 3. L. S. Equipment Co., Inc. | 4. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 2,593 | $11.00 | $16.00 | $12.00 | $15.00 | $25.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 863 | $20.00 | $32.00 | $27.00 | $15.00 | $30.00 |
| 3 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 567 | $20.00 | $40.00 | $40.00 | $35.00 | $50.00 |
| 4 | Backfill (type A) (134-7001) | STA | 112 | $175.00 | $265.00 | $280.00 | $200.00 | $450.00 |
| 5 | Blading (150-7001) | STA | 112 | $700.00 | $115.00 | $105.00 | $300.00 | $450.00 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 22,806 | $4.00 | $4.00 | $4.15 | $5.00 | $6.00 |
| 7 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 11,401 | $1.00 | $0.19 | $0.16 | $0.25 | $1.00 |
| 8 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 22,806 | $2.00 | $0.62 | $0.60 | $0.70 | $1.00 |
| 9 | Bonded fiber MTRX seed (temporary)(warm) (164-7074) | SY | 11,401 | $2.00 | $0.60 | $0.55 | $0.60 | $1.00 |
| 10 | Bonded fiber MTRX seed (temporary)(cool) (164-7075) | SY | 11,401 | $2.00 | $0.60 | $0.60 | $0.62 | $1.00 |
| 11 | Vegetative watering (168-7001) | TGL | 51 | $99.00 | $40.00 | $30.00 | $0.01 | $50.00 |
| 12 | Cement (275-7001) | TON | 345 | $275.00 | $300.00 | $315.00 | $300.00 | $350.00 |
| 13 | Cement TRT (existing material)(8") (275-7003) | SY | 19,144 | $8.00 | $6.25 | $13.00 | $8.50 | $12.00 |
| 14 | Prime coat (MC-30) (310-7004) | GAL | 2,683 | $6.00 | $9.00 | $5.00 | $6.50 | $6.00 |
| 15 | Emuls asphalt (erosion control)(CSS-1) (314-7010) | GAL | 1,786 | $5.00 | $6.25 | $5.00 | $5.00 | $6.00 |
| 16 | Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068) | GAL | 6,439 | $6.00 | $5.50 | $8.50 | $6.00 | $6.00 |
| 17 | Aggregate (type-PD or PL, GR-4) (316-7258) | CY | 149 | $190.00 | $300.00 | $375.00 | $220.00 | $500.00 |
| 18 | SP mixes SP-B PG64-22 (344-7001) | TON | 5,903 | $190.00 | $172.00 | $180.00 | $212.50 | $210.00 |
| 19 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 1,968 | $185.00 | $172.00 | $200.00 | $212.50 | $240.00 |
| 20 | Tack coat (344-7077) | GAL | 3,494 | $5.00 | $4.00 | $0.01 | $5.00 | $6.00 |
| 21 | Class A concrete (plug) (420-7009) | EACH | 2 | $1,725.00 | $2,000.00 | $1,500.00 | $600.00 | $1,500.00 |
| 22 | Class C concrete (collar) (420-7061) | EACH | 1 | $2,100.00 | $2,200.00 | $1,500.00 | $2,200.00 | $1,500.00 |
| 23 | RC pipe (CL III)(18 in) (464-7003) | LF | 20 | $120.00 | $100.00 | $100.00 | $60.00 | $85.00 |
| 24 | RC pipe (CL III)(30 in) (464-7007) | LF | 8 | $300.00 | $330.00 | $150.00 | $96.50 | $120.00 |
| 25 | Inlet (complete)(FG)(8'X 3'-3' X 3')(FTW) (465-7223) | EACH | 1 | $20,000 | $12,500 | $20,000 | $14,000 | $12,500 |
| 26 | Set (type II) (18 in) (TP) (6: 1) (P) (467-7312) | EACH | 1 | $2,500.00 | $2,000.00 | $1,500.00 | $950.00 | $1,850.00 |
| 27 | Removing structure (inlet) (496-7002) | EACH | 2 | $1,626.00 | $200.00 | $800.00 | $1,200.00 | $2,500.00 |
| 28 | Removing structure (pipe) (496-7007) | LF | 8 | $54.00 | $60.00 | $65.00 | $125.00 | $50.00 |
| 29 | Removing structure (pipe) (496-7037) | EACH | 7 | $690.00 | $2,000.00 | $1,000.00 | $1,750.00 | $500.00 |
| 30 | Removing structure (junction box) (496-7044) | EACH | 1 | $2,095.00 | $900.00 | $800.00 | $1,150.00 | $2,500.00 |
| 31 | Mobilization (500-7001) | LS | 1 | $251,352 | $230,000 | $221,463 | $315,000 | $300,000 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $8,500.00 | $5,500.00 | $5,000.00 | $5,000.00 | $15,000 |
| 33 | Portable changeable message sign (503-7001) | DAY | 80 | $175.00 | $75.00 | $90.00 | $150.00 | $150.00 |
| 34 | Portable changeable message sign (503-7002) | EACH | 2 | $13,000 | $18,000 | $9,000.00 | $150.00 | $20,000 |
| 35 | TMA (stationary) (505-7001) | DAY | 80 | $200.00 | $200.00 | $150.00 | $300.00 | $250.00 |
| 36 | TMA (mobile operation) (505-7003) | DAY | 6 | $357.00 | $200.00 | $150.00 | $350.00 | $550.00 |
| 37 | Rock filter dams (install) (type 2) (506-7002) | LF | 420 | $54.00 | $50.00 | $55.84 | $75.00 | $40.00 |
| 38 | Rock filter dams (remove) (506-7011) | LF | 420 | $16.00 | $20.00 | $19.01 | $20.00 | $20.00 |
| 39 | Earthwork (erosion & sediment control, in vehicle) (506-7029) | CY | 350 | $57.00 | $20.00 | $25.00 | $15.00 | $4.00 |
| 40 | Backhoe work (erosion & sediment control) (506-7030) | HR | 190 | $150.00 | $75.00 | $60.00 | $100.00 | $150.00 |
| 41 | Temporary sediment control fence (install) (506-7039) | LF | 1,168 | $5.00 | $4.40 | $4.04 | $3.50 | $4.00 |
| 42 | Temporary sediment control fence (remove) (506-7041) | LF | 1,168 | $2.00 | $1.10 | $1.31 | $1.50 | $2.00 |
| 43 | Trackhoe work (erosion & sediment control) (506-7051) | HR | 190 | $250.00 | $75.00 | $120.00 | $150.00 | $150.00 |
| 44 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 5 | $467.00 | $1,300.00 | $1,100.00 | $800.00 | $1,500.00 |
| 45 | Remove SM RD SN sup&AM (644-7073) | EACH | 34 | $75.00 | $80.00 | $150.00 | $140.00 | $500.00 |
| 46 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 12 | $25.00 | $80.00 | $55.00 | $50.00 | $100.00 |
| 47 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 20,563 | $1.00 | $0.55 | $0.55 | $1.00 | $1.00 |
| 48 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 3,000 | $1.00 | $2.20 | $2.25 | $2.50 | $6.00 |
| 49 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 10,245 | $2.00 | $1.40 | $1.50 | $2.00 | $6.00 |
| 50 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 13,816 | $2.00 | $1.38 | $1.40 | $1.50 | $1.00 |
| 51 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 44 | $271.00 | $230.00 | $240.00 | $275.00 | $250.00 |
| 52 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 44 | $320.00 | $266.00 | $275.00 | $290.00 | $250.00 |
| 53 | Full - width mowing (730-7019) | CYC | 2 | $5,000.00 | $5,000.00 | $3,000.00 | $20,000 | $5,000.00 |
| 54 | Litter removal (734-7002) | CYC | 2 | $1,000.00 | $1,650.00 | $1,500.00 | $2,500.00 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.