TxDOT contract A00196862 bid tabulation
Hazard Elimination & Safety, FM 855 (US 175 to US 69). Let by Texas DOT on August 8, 2025, Cherokee, Tyler District. 13 bids received; low bid $4,101,439 by 3LW Civil LLC, -26% against the engineer's estimate of $5,515,548.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 91
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | 3LW Civil LLC | $4,101,439 | Low | -26% |
| 2 | Skyline Bridge LLC | $4,685,132 | +14% | -15% |
| 3 | THK Construction LLC | $4,790,166 | +17% | -13% |
| 4 | L. S. Equipment Co., Inc. | $4,986,544 | +22% | -10% |
| 5 | Baker & Company Construction, LLC | $5,077,561 | +24% | -8.0% |
| 6 | Highway 19 Construction LLC | $5,229,428 | +28% | -5.0% |
| 7 | True Roads Construction, LLC | $5,455,084 | +33% | -1.0% |
| 8 | Longview Bridge and Road, LTD. | $5,591,437 | +36% | +1.0% |
| 9 | Garret Shields Infrastructure | $5,689,734 | +39% | +3.0% |
| 10 | East Texas Bridge, Inc. | $5,765,449 | +41% | +5.0% |
| 11 | Lakey, Inc. | $6,549,548 | +60% | +19% |
| 12 | Altus Construction LLC | $7,187,199 | +75% | +30% |
| 13 | Reynolds & Kay, LTD. | $8,377,420 | +104% | +52% |
Engineer's estimate: $5,515,548.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. 3LW Civil LLC | 2. Skyline Bridge LLC | 3. THK Construction LLC | 4. L. S. Equipment Co., Inc. | 5. Baker & Company Construction, LLC | 6. Highway 19 Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 611 | $2,000.00 | $150.00 | $625.00 | $1,500.00 | $1,750.00 | $2,065.00 | $1,500.00 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 1,368 | $10.00 | $11.67 | $20.00 | $10.00 | $6.25 | $25.00 | $10.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 127 | $30.00 | $30.00 | $25.00 | $25.00 | $18.00 | $67.00 | $25.00 |
| 4 | Removing concrete (miscellaneous) (104-7047) | CY | 6 | $150.00 | $300.00 | $250.00 | $50.00 | $15.00 | $707.00 | $500.00 |
| 5 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 2,623 | $20.00 | $11.50 | $12.00 | $8.00 | $6.25 | $16.00 | $15.00 |
| 6 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 11,869 | $20.00 | $38.33 | $26.00 | $20.00 | $20.00 | $25.00 | $30.00 |
| 7 | Backfill (type A) (134-7001) | STA | 8 | $350.00 | $1,500.00 | $1,000.00 | $200.00 | $190.00 | $1,660.00 | $500.00 |
| 8 | Blading (150-7001) | STA | 126 | $300.00 | $1.00 | $600.00 | $150.00 | $150.00 | $540.00 | $250.00 |
| 9 | Furn & place topsoil (4") (160-7002) | SY | 47,686 | $3.00 | $4.25 | $3.00 | $3.50 | $2.75 | $0.95 | $2.00 |
| 10 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 23,844 | $0.20 | $0.01 | $0.35 | $0.15 | $0.18 | $0.20 | $0.25 |
| 11 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 47,686 | $0.85 | $0.01 | $0.75 | $0.58 | $0.60 | $0.85 | $0.75 |
| 12 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 23,844 | $0.60 | $0.01 | $0.75 | $0.56 | $0.60 | $0.70 | $0.75 |
| 13 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 23,844 | $0.60 | $0.01 | $0.75 | $0.57 | $0.60 | $0.70 | $0.75 |
| 14 | Vegetative watering (168-7001) | TGL | 525 | $15.00 | $0.01 | $1.00 | $10.00 | $0.01 | $10.00 | $10.00 |
| 15 | SP mixes SP-C PG64-22 (344-7009) | TON | 4 | $1,000.00 | $275.00 | $1,000.00 | $400.00 | $400.00 | $718.00 | $500.00 |
| 16 | Cut & restore asphalt paving (400-7008) | SY | 149 | $230.00 | $335.00 | $450.00 | $150.00 | $298.50 | $212.00 | $350.00 |
| 17 | Flowable backfill (401-7001) | CY | 105 | $410.00 | $356.00 | $300.00 | $350.00 | $400.00 | $331.00 | $350.00 |
| 18 | Temporary special shoring (403-7001) | SF | 8,532 | $30.00 | $27.50 | $24.00 | $30.00 | $45.00 | $26.00 | $55.00 |
| 19 | Class C concrete (collar) (420-7061) | EACH | 79 | $1,000.00 | $1,250.00 | $1,400.00 | $1,000.00 | $1,000.00 | $825.00 | $1,000.00 |
| 20 | Riprap (mow strip)(4 in) (432-7013) | CY | 105 | $650.00 | $708.87 | $750.00 | $700.00 | $900.00 | $743.00 | $550.00 |
| 21 | Riprap (mow strip)(5 in) (432-7014) | CY | 88 | $650.00 | $711.87 | $850.00 | $750.00 | $900.00 | $798.00 | $550.00 |
| 22 | Riprap (stone common)(dry)(24 in) (432-7034) | CY | 200 | $200.00 | $229.30 | $200.00 | $200.00 | $200.00 | $172.00 | $180.00 |
| 23 | Riprap (stone protection)(18 in) (432-7043) | CY | 110 | $200.00 | $226.49 | $185.00 | $200.00 | $225.00 | $216.00 | $180.00 |
| 24 | Riprap (stone protection)(24 in) (432-7045) | CY | 71 | $215.00 | $229.30 | $225.00 | $200.00 | $225.00 | $222.00 | $180.00 |
| 25 | Rail (type T631) (450-7020) | LF | 200 | $95.00 | $130.75 | $100.00 | $101.32 | $92.00 | $88.00 | $99.00 |
| 26 | Concrete box culvert (6 FT X 6 FT)(extend) (462-7069) | LF | 92 | $1,200.00 | $1,060.68 | $1,400.00 | $1,200.00 | $1,400.00 | $798.00 | $800.00 |
| 27 | Concrete box culvert (8 FT X 6 FT)(extend) (462-7078) | LF | 44 | $1,200.00 | $1,403.04 | $2,000.00 | $1,500.00 | $1,600.00 | $963.00 | $850.00 |
| 28 | Concrete box culvert (9 FT X 6 FT)(extend) (462-7083) | LF | 16 | $2,500.00 | $1,500.00 | $2,200.00 | $1,500.00 | $1,800.00 | $1,073.00 | $1,000.00 |
| 29 | Concrete box culvert (9 FT X 7 FT)(extend) (462-7084) | LF | 40 | $2,800.00 | $1,529.40 | $2,800.00 | $1,600.00 | $4,500.00 | $1,100.00 | $1,100.00 |
| 30 | Concrete box culvert (5 FT X 6 FT) (extend) (462-7113) | LF | 19 | $905.00 | $968.58 | $1,400.00 | $1,150.00 | $1,500.00 | $715.00 | $700.00 |
| 31 | RC pipe (CL III)(18 in) (464-7003) | LF | 1,921 | $70.00 | $63.56 | $80.00 | $65.00 | $58.00 | $50.00 | $53.00 |
| 32 | RC pipe (CL III)(24 in) (464-7005) | LF | 372 | $120.00 | $83.68 | $90.00 | $95.00 | $70.00 | $87.00 | $75.00 |
| 33 | RC pipe (CL III)(30 in) (464-7007) | LF | 8 | $160.00 | $106.94 | $150.00 | $150.00 | $125.00 | $342.00 | $110.00 |
| 34 | RC pipe (CL III)(36 in) (464-7009) | LF | 12 | $200.00 | $139.19 | $180.00 | $200.00 | $150.00 | $284.00 | $186.00 |
| 35 | RC pipe (CL III)(48 in) (464-7011) | LF | 24 | $300.00 | $214.08 | $300.00 | $350.00 | $190.00 | $356.00 | $246.00 |
| 36 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 2 | $20,000 | $47,348 | $38,000 | $30,000 | $49,900 | $38,280 | $27,000 |
| 37 | Wingwall (PW - 2) (HW=8 FT) (466-7192) | EACH | 12 | $20,000 | $37,276 | $41,000 | $40,000 | $29,500 | $36,930 | $27,000 |
| 38 | Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305) | EACH | 16 | $1,700.00 | $950.30 | $750.00 | $1,000.00 | $650.00 | $880.00 | $685.00 |
| 39 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 25 | $1,500.00 | $986.05 | $815.00 | $1,100.00 | $700.00 | $855.00 | $712.00 |
| 40 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 128 | $1,900.00 | $1,093.30 | $900.00 | $850.00 | $800.00 | $1,017.00 | $850.00 |
| 41 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 17 | $1,904.55 | $1,236.30 | $1,200.00 | $1,500.00 | $1,050.00 | $1,255.00 | $1,005.00 |
| 42 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 9 | $2,000.00 | $1,307.80 | $1,275.00 | $1,500.00 | $1,100.00 | $1,297.00 | $1,060.00 |
| 43 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 8 | $1,300.00 | $1,522.33 | $1,500.00 | $1,200.00 | $1,175.00 | $1,560.00 | $1,350.00 |
| 44 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 1 | $2,350.00 | $1,844.05 | $1,775.00 | $2,500.00 | $1,800.00 | $2,400.00 | $2,072.00 |
| 45 | Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365) | EACH | 2 | $2,400.00 | $2,308.80 | $3,250.00 | $2,500.00 | $2,500.00 | $2,850.00 | $2,430.00 |
| 46 | Set (type II) (48 in) (RCP) (4: 1) (C) (467-7390) | EACH | 1 | $8,575.50 | $8,500.00 | $9,000.00 | $10,000 | $7,500.00 | $10,345 | $8,847.00 |
| 47 | Set (type II) (48 in) (RCP) (6: 1) (P) (467-7392) | EACH | 2 | $9,000.00 | $10,500 | $15,500 | $10,000 | $8,100.00 | $12,200 | $12,087 |
| 48 | Clean existing culverts (480-7001) | EACH | 27 | $2,000.00 | $750.00 | $1,000.00 | $2,000.00 | $1,000.00 | $1,570.00 | $2,500.00 |
| 49 | Removing structure (pipe) (496-7037) | EACH | 46 | $535.00 | $1,220.33 | $300.00 | $250.00 | $10.00 | $370.00 | $500.00 |
| 50 | Mobilization (500-7001) | LS | 1 | $556,474 | $363,250 | $400,000 | $450,000 | $350,000 | $239,050 | $500,000 |
| 51 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $7,500.00 | $6,074.97 | $4,000.00 | $1,349.05 | $5,000.00 | $3,906.00 | $5,000.00 |
| 52 | Portable changeable message sign (503-7001) | DAY | 420 | $175.00 | $85.00 | $110.00 | $100.00 | $75.00 | $50.00 | $100.00 |
| 53 | TMA (stationary) (505-7001) | DAY | 203 | $250.00 | $85.00 | $250.00 | $250.00 | $50.00 | $363.00 | $250.00 |
| 54 | TMA (mobile operation) (505-7003) | DAY | 28 | $140.00 | $0.01 | $50.00 | $350.00 | $200.00 | $2,488.00 | $500.00 |
| 55 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,640 | $36.00 | $43.78 | $45.00 | $41.93 | $55.00 | $31.00 | $65.00 |
| 56 | Rock filter dams (install) (type 3) (506-7003) | LF | 120 | $65.00 | $55.00 | $55.00 | $69.88 | $66.00 | $113.00 | $120.00 |
| 57 | Rock filter dams (remove) (506-7011) | LF | 1,760 | $11.00 | $19.80 | $5.00 | $13.98 | $9.00 | $10.00 | $10.00 |
| 58 | Earthwork (erosion & sediment control, in vehicle) (506-7029) | CY | 200 | $50.00 | $15.00 | $75.00 | $40.00 | $25.00 | $8.00 | $50.00 |
| 59 | Backhoe work (erosion & sediment control) (506-7030) | HR | 60 | $125.00 | $50.00 | $85.00 | $150.00 | $50.00 | $128.00 | $50.00 |
| 60 | Temporary sediment control fence (install) (506-7039) | LF | 8,915 | $3.85 | $4.29 | $3.75 | $4.11 | $3.90 | $3.30 | $4.00 |
| 61 | Temporary sediment control fence (remove) (506-7041) | LF | 8,915 | $1.00 | $1.10 | $1.00 | $0.27 | $0.50 | $1.10 | $1.25 |
| 62 | Trackhoe work (erosion & sediment control) (506-7051) | HR | 60 | $125.00 | $50.00 | $150.00 | $200.00 | $100.00 | $129.00 | $50.00 |
| 63 | Driveways (concrete) (hes) (530-7007) | SY | 127 | $150.00 | $140.97 | $225.00 | $100.00 | $180.00 | $248.00 | $120.00 |
| 64 | Driveways (ACP) (530-7010) | SY | 2,623 | $100.00 | $55.00 | $70.00 | $50.00 | $60.00 | $80.00 | $65.00 |
| 65 | Turnouts (ACP) (530-7018) | SY | 1,551 | $100.00 | $55.00 | $70.00 | $60.00 | $70.00 | $118.00 | $85.00 |
| 66 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,788 | $34.50 | $27.88 | $31.00 | $28.76 | $27.25 | $26.50 | $32.00 |
| 67 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 63 | $100.00 | $112.00 | $100.00 | $97.83 | $98.00 | $88.00 | $85.00 |
| 68 | Remove metal beam guard fence (542-7001) | LF | 1,075 | $3.00 | $1.50 | $5.00 | $2.15 | $2.20 | $2.20 | $3.00 |
| 69 | Guardrail end treatment (install) (544-7001) | EACH | 12 | $3,250.00 | $2,900.00 | $3,500.00 | $3,225.00 | $3,500.00 | $3,080.00 | $2,850.00 |
| 70 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $275.00 | $250.00 | $500.00 | $215.00 | $210.00 | $220.00 | $250.00 |
| 71 | Wire fence (type A) (552-7001) | LF | 200 | $25.00 | $35.00 | $27.50 | $40.00 | $32.00 | $32.00 | $15.00 |
| 72 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 9 | $400.00 | $605.00 | $600.00 | $591.25 | $690.00 | $682.00 | $350.00 |
| 73 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 51 | $250.00 | $325.00 | $295.00 | $236.50 | $310.00 | $253.00 | $450.00 |
| 74 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 10 | $300.00 | $350.00 | $300.00 | $268.75 | $350.00 | $297.00 | $750.00 |
| 75 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 147 | $100.00 | $516.45 | $725.00 | $671.88 | $690.00 | $720.00 | $750.00 |
| 76 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $1,150.00 | $680.31 | $800.00 | $752.50 | $825.00 | $897.00 | $1,000.00 |
| 77 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 6 | $950.00 | $983.56 | $1,000.00 | $967.50 | $1,125.00 | $1,250.00 | $750.00 |
| 78 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,125.00 | $927.59 | $1,000.00 | $967.50 | $1,250.00 | $1,250.00 | $1,500.00 |
| 79 | Remove SM RD SN sup&AM (644-7073) | EACH | 160 | $75.00 | $125.00 | $125.00 | $107.50 | $112.50 | $105.00 | $100.00 |
| 80 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 42 | $35.00 | $30.00 | $50.00 | $26.88 | $26.50 | $33.00 | $35.00 |
| 81 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 58 | $65.00 | $75.00 | $80.00 | $64.50 | $102.50 | $68.00 | $25.00 |
| 82 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 5,695 | $1.50 | $0.50 | $1.00 | $1.00 | $1.45 | $2.50 | $2.00 |
| 83 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 410 | $7.59 | $6.60 | $8.00 | $6.45 | $6.50 | $6.60 | $7.75 |
| 84 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 110,277 | $0.81 | $0.88 | $1.00 | $0.86 | $0.86 | $0.90 | $0.90 |
| 85 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 2,360 | $0.84 | $2.20 | $2.50 | $2.15 | $2.10 | $2.20 | $1.00 |
| 86 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 300 | $10.00 | $16.50 | $20.00 | $16.13 | $16.00 | $16.50 | $10.00 |
| 87 | Reflectorized pavement marker type I-A (672-7001) | EACH | 128 | $4.34 | $6.60 | $10.00 | $6.45 | $6.50 | $6.60 | $5.25 |
| 88 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,481 | $4.40 | $4.95 | $6.00 | $4.84 | $4.60 | $5.00 | $5.25 |
| 89 | Eliminating existing PM & markers (4") (677-7001) | LF | 112,637 | $1.00 | $0.25 | $0.35 | $0.24 | $0.25 | $0.25 | $2.00 |
| 90 | Full - width mowing (730-7019) | CYC | 2 | $5,000.00 | $3,500.00 | $5,000.00 | $10,000 | $5,000.00 | $5,000.00 | $5,000.00 |
| 91 | Litter removal (734-7002) | CYC | 2 | $2,500.00 | $1.00 | $5,000.00 | $5,000.00 | $1,000.00 | $1,500.00 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.