TxDOT contract A00196862 bid tabulation

Hazard Elimination & Safety, FM 855 (US 175 to US 69). Let by Texas DOT on August 8, 2025, Cherokee, Tyler District. 13 bids received; low bid $4,101,439 by 3LW Civil LLC, -26% against the engineer's estimate of $5,515,548.

Owner
Texas DOT
Letting
08 AUG 2025
Pay items
91
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
13LW Civil LLC$4,101,439Low-26%
2Skyline Bridge LLC$4,685,132+14%-15%
3THK Construction LLC$4,790,166+17%-13%
4L. S. Equipment Co., Inc.$4,986,544+22%-10%
5Baker & Company Construction, LLC$5,077,561+24%-8.0%
6Highway 19 Construction LLC$5,229,428+28%-5.0%
7True Roads Construction, LLC$5,455,084+33%-1.0%
8Longview Bridge and Road, LTD.$5,591,437+36%+1.0%
9Garret Shields Infrastructure$5,689,734+39%+3.0%
10East Texas Bridge, Inc.$5,765,449+41%+5.0%
11Lakey, Inc.$6,549,548+60%+19%
12Altus Construction LLC$7,187,199+75%+30%
13Reynolds & Kay, LTD.$8,377,420+104%+52%
TxDOT contract A00196862: bids by rank

Engineer's estimate: $5,515,548.

Bid tabulation

LinePay itemUnitQuantityEstimate1. 3LW Civil LLC2. Skyline Bridge LLC3. THK Construction LLC4. L. S. Equipment Co., Inc.5. Baker & Company Construction, LLC6. Highway 19 Construction LLC
1Preparing row (100-7002)STA611$2,000.00$150.00$625.00$1,500.00$1,750.00$2,065.00$1,500.00
2Removing concrete (mowstrip) (104-7005)LF1,368$10.00$11.67$20.00$10.00$6.25$25.00$10.00
3Removing concrete (driveways) (104-7011)SY127$30.00$30.00$25.00$25.00$18.00$67.00$25.00
4Removing concrete (miscellaneous) (104-7047)CY6$150.00$300.00$250.00$50.00$15.00$707.00$500.00
5Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY2,623$20.00$11.50$12.00$8.00$6.25$16.00$15.00
6Embankment (vehicle)(OC)(type C) (132-7017)CY11,869$20.00$38.33$26.00$20.00$20.00$25.00$30.00
7Backfill (type A) (134-7001)STA8$350.00$1,500.00$1,000.00$200.00$190.00$1,660.00$500.00
8Blading (150-7001)STA126$300.00$1.00$600.00$150.00$150.00$540.00$250.00
9Furn & place topsoil (4") (160-7002)SY47,686$3.00$4.25$3.00$3.50$2.75$0.95$2.00
10Broadcast seed (permanent_rural_sand) (164-7001)SY23,844$0.20$0.01$0.35$0.15$0.18$0.20$0.25
11Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076)SY47,686$0.85$0.01$0.75$0.58$0.60$0.85$0.75
12Bond fiber MTRX seed (temporary)(warm) (164-7077)SY23,844$0.60$0.01$0.75$0.56$0.60$0.70$0.75
13Bond fiber MTRX seed (temporary)(cool) (164-7078)SY23,844$0.60$0.01$0.75$0.57$0.60$0.70$0.75
14Vegetative watering (168-7001)TGL525$15.00$0.01$1.00$10.00$0.01$10.00$10.00
15SP mixes SP-C PG64-22 (344-7009)TON4$1,000.00$275.00$1,000.00$400.00$400.00$718.00$500.00
16Cut & restore asphalt paving (400-7008)SY149$230.00$335.00$450.00$150.00$298.50$212.00$350.00
17Flowable backfill (401-7001)CY105$410.00$356.00$300.00$350.00$400.00$331.00$350.00
18Temporary special shoring (403-7001)SF8,532$30.00$27.50$24.00$30.00$45.00$26.00$55.00
19Class C concrete (collar) (420-7061)EACH79$1,000.00$1,250.00$1,400.00$1,000.00$1,000.00$825.00$1,000.00
20Riprap (mow strip)(4 in) (432-7013)CY105$650.00$708.87$750.00$700.00$900.00$743.00$550.00
21Riprap (mow strip)(5 in) (432-7014)CY88$650.00$711.87$850.00$750.00$900.00$798.00$550.00
22Riprap (stone common)(dry)(24 in) (432-7034)CY200$200.00$229.30$200.00$200.00$200.00$172.00$180.00
23Riprap (stone protection)(18 in) (432-7043)CY110$200.00$226.49$185.00$200.00$225.00$216.00$180.00
24Riprap (stone protection)(24 in) (432-7045)CY71$215.00$229.30$225.00$200.00$225.00$222.00$180.00
25Rail (type T631) (450-7020)LF200$95.00$130.75$100.00$101.32$92.00$88.00$99.00
26Concrete box culvert (6 FT X 6 FT)(extend) (462-7069)LF92$1,200.00$1,060.68$1,400.00$1,200.00$1,400.00$798.00$800.00
27Concrete box culvert (8 FT X 6 FT)(extend) (462-7078)LF44$1,200.00$1,403.04$2,000.00$1,500.00$1,600.00$963.00$850.00
28Concrete box culvert (9 FT X 6 FT)(extend) (462-7083)LF16$2,500.00$1,500.00$2,200.00$1,500.00$1,800.00$1,073.00$1,000.00
29Concrete box culvert (9 FT X 7 FT)(extend) (462-7084)LF40$2,800.00$1,529.40$2,800.00$1,600.00$4,500.00$1,100.00$1,100.00
30Concrete box culvert (5 FT X 6 FT) (extend) (462-7113)LF19$905.00$968.58$1,400.00$1,150.00$1,500.00$715.00$700.00
31RC pipe (CL III)(18 in) (464-7003)LF1,921$70.00$63.56$80.00$65.00$58.00$50.00$53.00
32RC pipe (CL III)(24 in) (464-7005)LF372$120.00$83.68$90.00$95.00$70.00$87.00$75.00
33RC pipe (CL III)(30 in) (464-7007)LF8$160.00$106.94$150.00$150.00$125.00$342.00$110.00
34RC pipe (CL III)(36 in) (464-7009)LF12$200.00$139.19$180.00$200.00$150.00$284.00$186.00
35RC pipe (CL III)(48 in) (464-7011)LF24$300.00$214.08$300.00$350.00$190.00$356.00$246.00
36Wingwall (PW - 1) (HW=8 FT) (466-7178)EACH2$20,000$47,348$38,000$30,000$49,900$38,280$27,000
37Wingwall (PW - 2) (HW=8 FT) (466-7192)EACH12$20,000$37,276$41,000$40,000$29,500$36,930$27,000
38Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305)EACH16$1,700.00$950.30$750.00$1,000.00$650.00$880.00$685.00
39Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH25$1,500.00$986.05$815.00$1,100.00$700.00$855.00$712.00
40Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH128$1,900.00$1,093.30$900.00$850.00$800.00$1,017.00$850.00
41Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH17$1,904.55$1,236.30$1,200.00$1,500.00$1,050.00$1,255.00$1,005.00
42Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH9$2,000.00$1,307.80$1,275.00$1,500.00$1,100.00$1,297.00$1,060.00
43Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH8$1,300.00$1,522.33$1,500.00$1,200.00$1,175.00$1,560.00$1,350.00
44Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH1$2,350.00$1,844.05$1,775.00$2,500.00$1,800.00$2,400.00$2,072.00
45Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365)EACH2$2,400.00$2,308.80$3,250.00$2,500.00$2,500.00$2,850.00$2,430.00
46Set (type II) (48 in) (RCP) (4: 1) (C) (467-7390)EACH1$8,575.50$8,500.00$9,000.00$10,000$7,500.00$10,345$8,847.00
47Set (type II) (48 in) (RCP) (6: 1) (P) (467-7392)EACH2$9,000.00$10,500$15,500$10,000$8,100.00$12,200$12,087
48Clean existing culverts (480-7001)EACH27$2,000.00$750.00$1,000.00$2,000.00$1,000.00$1,570.00$2,500.00
49Removing structure (pipe) (496-7037)EACH46$535.00$1,220.33$300.00$250.00$10.00$370.00$500.00
50Mobilization (500-7001)LS1$556,474$363,250$400,000$450,000$350,000$239,050$500,000
51Barricades, signs and traffic handling (502-7001)MO14$7,500.00$6,074.97$4,000.00$1,349.05$5,000.00$3,906.00$5,000.00
52Portable changeable message sign (503-7001)DAY420$175.00$85.00$110.00$100.00$75.00$50.00$100.00
53TMA (stationary) (505-7001)DAY203$250.00$85.00$250.00$250.00$50.00$363.00$250.00
54TMA (mobile operation) (505-7003)DAY28$140.00$0.01$50.00$350.00$200.00$2,488.00$500.00
55Rock filter dams (install) (type 2) (506-7002)LF1,640$36.00$43.78$45.00$41.93$55.00$31.00$65.00
56Rock filter dams (install) (type 3) (506-7003)LF120$65.00$55.00$55.00$69.88$66.00$113.00$120.00
57Rock filter dams (remove) (506-7011)LF1,760$11.00$19.80$5.00$13.98$9.00$10.00$10.00
58Earthwork (erosion & sediment control, in vehicle) (506-7029)CY200$50.00$15.00$75.00$40.00$25.00$8.00$50.00
59Backhoe work (erosion & sediment control) (506-7030)HR60$125.00$50.00$85.00$150.00$50.00$128.00$50.00
60Temporary sediment control fence (install) (506-7039)LF8,915$3.85$4.29$3.75$4.11$3.90$3.30$4.00
61Temporary sediment control fence (remove) (506-7041)LF8,915$1.00$1.10$1.00$0.27$0.50$1.10$1.25
62Trackhoe work (erosion & sediment control) (506-7051)HR60$125.00$50.00$150.00$200.00$100.00$129.00$50.00
63Driveways (concrete) (hes) (530-7007)SY127$150.00$140.97$225.00$100.00$180.00$248.00$120.00
64Driveways (ACP) (530-7010)SY2,623$100.00$55.00$70.00$50.00$60.00$80.00$65.00
65Turnouts (ACP) (530-7018)SY1,551$100.00$55.00$70.00$60.00$70.00$118.00$85.00
66Metal W-beam guard fence (steel post) (540-7002)LF1,788$34.50$27.88$31.00$28.76$27.25$26.50$32.00
67Metal W - beam guard fence (low fill culvert) (540-7018)LF63$100.00$112.00$100.00$97.83$98.00$88.00$85.00
68Remove metal beam guard fence (542-7001)LF1,075$3.00$1.50$5.00$2.15$2.20$2.20$3.00
69Guardrail end treatment (install) (544-7001)EACH12$3,250.00$2,900.00$3,500.00$3,225.00$3,500.00$3,080.00$2,850.00
70Guardrail end treatment (remove) (544-7003)EACH6$275.00$250.00$500.00$215.00$210.00$220.00$250.00
71Wire fence (type A) (552-7001)LF200$25.00$35.00$27.50$40.00$32.00$32.00$15.00
72Mailbox install-M (TWG-post) type 1 (560-7001)EACH9$400.00$605.00$600.00$591.25$690.00$682.00$350.00
73Mailbox install-S (TWG-post) type 2 (560-7002)EACH51$250.00$325.00$295.00$236.50$310.00$253.00$450.00
74Mailbox install-D (TWG-post) type 2 (560-7003)EACH10$300.00$350.00$300.00$268.75$350.00$297.00$750.00
75Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH147$100.00$516.45$725.00$671.88$690.00$720.00$750.00
76Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH2$1,150.00$680.31$800.00$752.50$825.00$897.00$1,000.00
77Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH6$950.00$983.56$1,000.00$967.50$1,125.00$1,250.00$750.00
78Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,125.00$927.59$1,000.00$967.50$1,250.00$1,250.00$1,500.00
79Remove SM RD SN sup&AM (644-7073)EACH160$75.00$125.00$125.00$107.50$112.50$105.00$100.00
80Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH42$35.00$30.00$50.00$26.88$26.50$33.00$35.00
81Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH58$65.00$75.00$80.00$64.50$102.50$68.00$25.00
82Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH5,695$1.50$0.50$1.00$1.00$1.45$2.50$2.00
83Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF410$7.59$6.60$8.00$6.45$6.50$6.60$7.75
84Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF110,277$0.81$0.88$1.00$0.86$0.86$0.90$0.90
85Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF2,360$0.84$2.20$2.50$2.15$2.10$2.20$1.00
86PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF300$10.00$16.50$20.00$16.13$16.00$16.50$10.00
87Reflectorized pavement marker type I-A (672-7001)EACH128$4.34$6.60$10.00$6.45$6.50$6.60$5.25
88Reflectorized pavement marker type II-A-A (672-7004)EACH1,481$4.40$4.95$6.00$4.84$4.60$5.00$5.25
89Eliminating existing PM & markers (4") (677-7001)LF112,637$1.00$0.25$0.35$0.24$0.25$0.25$2.00
90Full - width mowing (730-7019)CYC2$5,000.00$3,500.00$5,000.00$10,000$5,000.00$5,000.00$5,000.00
91Litter removal (734-7002)CYC2$2,500.00$1.00$5,000.00$5,000.00$1,000.00$1,500.00$5,000.00
TxDOT contract A00196862: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy