Lakey, Inc.: TxDOT bid record
Lakey, Inc. submitted 51 bids on Texas DOT contracts in the data, from 07 JAN 2025 to 17 SEP 2025, and was the low bidder on 8 of them (16%). When it was not low, its total sat a median +29% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $14,114,803
- Latest bid
- 17 SEP 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 51 | 8 | 16% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lufkin District | 11 | 2 | 18% |
| San Antonio District | 7 | 0 | 0% |
| Atlanta District | 6 | 1 | 17% |
| Paris District | 5 | 1 | 20% |
| Bryan District | 4 | 2 | 50% |
| Beaumont District | 4 | 1 | 25% |
| Tyler District | 3 | 0 | 0% |
| Waco District | 3 | 0 | 0% |
| Yoakum District | 3 | 1 | 33% |
| Brownwood District | 2 | 0 | 0% |
| Austin District | 1 | 0 | 0% |
| Abilene District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 41 | 10 (24%) | $205.00 | $230.00 |
| Mobilization (callout) | 500-7002 | EACH | 15 | 10 (67%) | $500.00 | $688.00 |
| Tree removal (4" - 12" diameter) | 752-7005 | EACH | 12 | 8 (67%) | $40.00 | $150.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 13 | 5 (38%) | $29.00 | $27.00 |
| Tree removal (12" - 18" diameter) | 752-7006 | EACH | 10 | 5 (50%) | $74.50 | $193.43 |
| Guardrail end treatment (remove) | 544-7003 | EACH | 11 | 4 (36%) | $300.00 | $275.00 |
| Work zone pavement marking SHT terminal (tab)type Y-2 | 662-7114 | EACH | 9 | 4 (44%) | $1.22 | $1.41 |
| Portable changeable message sign | 503-7001 | DAY | 8 | 4 (50%) | $93.28 | $100.00 |
| Replace timber post W/O concrete FND | 770-7006 | EACH | 5 | 4 (80%) | $5.50 | $65.00 |
| Replace timber post W/ concrete FND | 770-7008 | EACH | 5 | 4 (80%) | $5.50 | $70.00 |
| Vegetative watering | 168-7001 | TGL | 19 | 3 (16%) | $34.50 | $37.73 |
| Preparing row | 100-7002 | STA | 16 | 3 (19%) | $3,650.00 | $2,750.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rhino Equity, LLC | 17 | 12 of 17 |
| BK Field Operations LLC | 10 | 9 of 10 |
| Icos Management, LLC | 9 | 3 of 9 |
| Aad Contracting Inc. | 9 | 6 of 9 |
| Garret Shields Infrastructure | 8 | 4 of 8 |
| Cross Plus Construction, LLC | 8 | 3 of 8 |
| Catocon, Inc. | 7 | 3 of 7 |
| Cehand Services LLC | 7 | 3 of 7 |
| Beck-Reit & Sons, LTD. | 6 | 5 of 6 |
| Grey Sky Construction LLC | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2025 | A00214053 | Lufkin District | CULVERT REPAIR, US0096 (WITHIN THE LUFKIN DISTRICT to WITHIN THE LUFKIN DISTRICT) | 5 of 7 | $753,379 | +22% |
| 04 SEP 2025 | A00194530 | Lufkin District | Bridge Replacement, FM 2610 (FM 2610 to At Menard Creek.) | 4 of 7 | $2,843,814 | +15% |
| 04 SEP 2025 | A00134791 | Yoakum District | Bridge Replacement, COUNTY ROAD 177 (CR 177 at BOGGY CREEK to STR# AA01-32-001) | 7 of 10 | $1,721,092 | +14% |
| 08 AUG 2025 | A00196862 | Tyler District | Hazard Elimination & Safety, FM 855 (US 175 to US 69) | 11 of 13 | $6,549,548 | +60% |
| 07 AUG 2025 | A00185701 | Lufkin District | Bridge Replacement, COUNTY ROAD 3689 (CR 3689 at Cypress Creek to .) | 7 of 8 | $2,052,166 | +26% |
| 19 MAR 2025 | A00214127 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, SH0021 (SABINE COUNTY to VARIOUS LOCATIONS) | 4 of 7 | $308,338 | +19% |
| 19 MAR 2025 | A00214202 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, FM0357 (TRINITY COUNTY to VARIOUS LOCATIONS) | 3 of 7 | $279,800 | +26% |
| 05 MAR 2025 | A00184051 | Beaumont District | Hazard Elimination & Safety, US 190 (0.1 MI W OF FM 777, EAST to 0.1 MI E OF FM 777) | 3 of 5 | $278,751 | +16% |
| 05 MAR 2025 | A00210443 | Waco District | Highway Improvement, FM 933 (Patton Lake Rd to FM 1133) | 8 of 8 | $2,330,877 | +151% |
| 05 MAR 2025 | A00193322 | Abilene District | Widen Road - Add Shoulders, FM 382 (FM 604 to RUNNELS COUNTY) | 4 of 6 | $2,596,954 | +46% |
| 05 MAR 2025 | A00140131 | Lufkin District | Bridge Maintenance, Various (Various Locations Districtwide to .) | 2 of 14 | $821,374 | 0.0% |
| 05 MAR 2025 | A00209768 | Paris District | Hazard Elimination & Safety, Various (Various Locations (off-system) to .) | 8 of 9 | $132,391 | +53% |
| 05 MAR 2025 | A00210821 | Tyler District | Hazard Elimination & Safety, Various (VARIOUS LOCATIONS IN to THE TYLER DISTRICT) | 7 of 7 | $3,920,086 | +96% |
| 05 MAR 2025 | A00193914 | Yoakum District | Bridge Replacement, BAGBY RD (AT BRUSHY CREEK to STR# AA01-21-001 (BAGBY RD)) | 1 of 6 | $1,929,627 | Low, 1.0% under the second |
| 05 MAR 2025 | A00187704 | Waco District | Bridge Replacement, SH 317 (at BNSF Railroad to .) | 4 of 5 | $7,773,923 | +18% |
| 04 MAR 2025 | A00180383 | Bryan District | Drainage Improvements, SH 30 (CR 171 to 0.1 Mi E of FM 244) | 2 of 9 | $1,166,334 | +22% |
| 04 MAR 2025 | A00203665 | Austin District | Bridge Maintenance, FM 2571 (AT GAZLEY CREEK to .) | 16 of 19 | $339,098 | +88% |
| 04 MAR 2025 | A00195148 | Paris District | Widen Road - Add Lanes, FM 697 (Mill Creek Bridge to US 69) | 1 of 5 | $5,014,608 | Low, 11% under the second |
| 04 MAR 2025 | A00133339 | Fort Worth District | Bridge Replacement, COUNTY ROAD 270 (CR 270 AT TRIBUTARY TO NORTH BOSQUE to .) | 8 of 8 | $1,860,950 | +31% |
| 04 MAR 2025 | A00194210 | Yoakum District | Bridge Replacement, COUNTY ROAD 404 (At Mud Creek to STR# AA04-18-001) | 2 of 9 | $3,134,164 | +1.0% |
| 04 MAR 2025 | A00197896 | Beaumont District | Hazard Elimination & Safety, FM 1131 (JASPER COUNTY LINE, SOUTH to FM 105 S) | 1 of 3 | $5,072,329 | Low, 11% under the second |
| 20 FEB 2025 | A00189581 | San Antonio District | EROSION REPAIR, FM0306 (AT SUCHE CREEK to AND AT POTTER CREEK) | 8 of 13 | $226,613 | +67% |
| 20 FEB 2025 | A00210463 | San Antonio District | EROSION REPAIR, SH0041 (SH 41 AT UNNAMED DRAW to AND SH 16 AT DREAN CREEK) | 10 of 11 | $126,826 | +83% |
| 20 FEB 2025 | A00185435 | San Antonio District | EROSION REPAIR, IH0035 (IH 35 AT YORK CRK BRANCH, FM 3009 AT BRA to AND US90A AT UNNAMED DRAW) | 7 of 12 | $180,351 | +80% |
| 20 FEB 2025 | A00212635 | Atlanta District | METAL BEAM GUARD FENCE REPAIR, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 1 of 4 | $715,078 | Low, 2.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.