TxDOT contract A00203665 bid tabulation
Bridge Maintenance, FM 2571 (AT GAZLEY CREEK to .). Let by Texas DOT on March 4, 2025, Bastrop, Austin District. 19 bids received; low bid $180,204 by Taylor Contracting LLC, -35% against the engineer's estimate of $277,476.
- Owner
- Texas DOT
- Letting
- 04 MAR 2025
- Pay items
- 14
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Taylor Contracting LLC | $180,204 | Low | -35% |
| 2 | Beck-Reit & Sons, LTD. | $182,924 | +2.0% | -34% |
| 3 | BK Field Operations LLC | $195,344 | +8.0% | -30% |
| 4 | Garret Shields Infrastructure | $226,250 | +26% | -18% |
| 5 | Dalrymple Gravel and Contracting Company, Inc. | $228,735 | +27% | -18% |
| 6 | Premier Contractors LLC | $232,414 | +29% | -16% |
| 7 | Icos Management, LLC | $238,204 | +32% | -14% |
| 8 | Structural Integrity Group LLC | $238,490 | +32% | -14% |
| 9 | Restek, Inc. | $250,273 | +39% | -10% |
| 10 | Rhino Equity, LLC | $252,700 | +40% | -9.0% |
| 11 | MB Western Industrial Contracting Co. | $256,293 | +42% | -8.0% |
| 12 | Aad Contracting Inc. | $267,595 | +48% | -4.0% |
| 13 | Dan Williams Company | $274,545 | +52% | -1.0% |
| 14 | Blacksmith Ventures LLC | $294,675 | +64% | +6.0% |
| 15 | Aaron Concrete Contractors, LLC | $338,640 | +88% | +22% |
| 16 | Lakey, Inc. | $339,098 | +88% | +22% |
| 17 | Apm Infrastructure, LLC | $340,820 | +89% | +23% |
| 18 | Built Right Construction of Oklahoma, LLC | $341,180 | +89% | +23% |
| 19 | Cross Plus Construction, LLC | $399,135 | +121% | +44% |
Engineer's estimate: $277,476.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Taylor Contracting LLC | 2. Beck-Reit & Sons, LTD. | 3. BK Field Operations LLC | 4. Garret Shields Infrastructure | 5. Dalrymple Gravel and Contracting Company, Inc. | 6. Premier Contractors LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 0.60 | $10,000 | $7,500.00 | $10,000 | $25,000 | $8,000.00 | $20,000 | $10,000 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 375 | $65.00 | $20.00 | $55.00 | $110.00 | $40.00 | $90.00 | $60.00 |
| 3 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 40 | $450.00 | $900.00 | $220.00 | $140.00 | $200.00 | $375.00 | $250.00 |
| 4 | Riprap (stone protection)(24 in) (432-7045) | CY | 555 | $247.24 | $180.00 | $201.00 | $194.00 | $250.00 | $195.00 | $250.00 |
| 5 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 144 | $55.00 | $45.00 | $55.00 | $40.00 | $50.00 | $30.00 | $100.00 |
| 6 | Mobilization (500-7001) | LS | 1 | $39,000 | $18,000 | $18,800 | $15,000 | $25,000 | $23,000 | $20,000 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $7,500.00 | $1.00 | $1.00 | $1.00 | $5,000.00 | $5,500.00 | $1.00 |
| 8 | Construction exits (install) (type 3) (506-7022) | SY | 60 | $40.00 | $12.00 | $50.00 | $1.00 | $10.00 | $50.00 | $50.00 |
| 9 | Construction exits (remove) (506-7024) | SY | 60 | $17.62 | $1.00 | $10.00 | $1.00 | $1.00 | $10.00 | $20.00 |
| 10 | Temporary sediment control fence (install) (506-7039) | LF | 40 | $4.55 | $5.00 | $3.00 | $2.00 | $5.00 | $5.00 | $2.00 |
| 11 | Temporary sediment control fence (remove) (506-7041) | LF | 40 | $8.49 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 |
| 12 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 160 | $4.50 | $4.00 | $5.00 | $1.00 | $8.00 | $7.50 | $20.00 |
| 13 | Biodegradable erosion control logs (remove) (506-7046) | LF | 160 | $1.65 | $1.00 | $1.00 | $1.00 | $2.00 | $2.50 | $20.00 |
| 14 | Driftwood removal (735-7061) | LS | 1 | $10,000 | $6,000.00 | $4,500.00 | $4,500.00 | $5,000.00 | $5,000.00 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.