Dalrymple Gravel and Contracting Company, Inc.: TxDOT bid record
Dalrymple Gravel and Contracting Company, Inc. submitted 19 bids on Texas DOT contracts in the data, from 06 MAY 2020 to 22 JUL 2026, and was the low bidder on 3 of them (16%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $321,500
- Latest bid
- 22 JUL 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 0 | 0% |
| 2021 | 8 | 2 | 25% |
| 2022 | 1 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2025 | 2 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Yoakum District | 8 | 3 | 38% |
| Austin District | 5 | 0 | 0% |
| Bryan District | 3 | 0 | 0% |
| San Antonio District | 2 | 0 | 0% |
| Corpus Christi District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 6 | 1 (17%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Touchstone Resources, LLC | 7 | 2 of 7 |
| Digg Commercial, LLC | 6 | 3 of 6 |
| FNH Construction, LLC | 4 | 1 of 4 |
| Relmco, Inc. | 3 | 2 of 3 |
| SJ&J Construction, LLC | 3 | 3 of 3 |
| Beck-Reit & Sons, LTD. | 3 | 3 of 3 |
| Knife River Corporation - South | 3 | 3 of 3 |
| Aaron Concrete Contractors, L.P. | 2 | 1 of 2 |
| Dean Word Company, LTD. | 2 | 1 of 2 |
| Crackseal of Texas, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JUL 2026 | A00220027 | San Antonio District | EROSION REPAIR, FM2673 (FM 2673 to AT DRAW) | 4 of 4 | $121,765 | +109% |
| 22 JUL 2026 | A00219576 | San Antonio District | EROSION REPAIR, UA0090 (US90A to at Darst Creek) | 3 of 4 | $218,230 | +24% |
| 22 APR 2026 | A00218663 | Yoakum District | ROCK/RIPRAP, US0059 (Victoria, Jackson, and Calhoun Counties to .) | 2 of 3 | $89,250 | +2.0% |
| 12 MAR 2025 | A00210095 | Austin District | ROCK/RIPRAP, SH0021 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | 2 of 4 | $187,500 | +5.0% |
| 04 MAR 2025 | A00203665 | Austin District | Bridge Maintenance, FM 2571 (AT GAZLEY CREEK to .) | 5 of 19 | $228,735 | +27% |
| 22 FEB 2023 | 02231311 | Yoakum District | US0077 Rock/riprap from DEWITT, LAVACA, FAYETTE, AND GONZAL to COUNTIES | 1 of 3 | $101,500 | Low, 14% under the second |
| 15 NOV 2022 | 11221603 | Corpus Christi District | US0059 Bridge scour repair from US 59 SB @ COLETO CR RES to 1.80 MI E OF FM 2987 | 6 of 8 | $323,580 | +15% |
| 02 SEP 2021 | 09214201 | Austin District | FM0020 Scour and erosion control from PLUM CREEK to PLUM CREEK | 5 of 8 | $801,045 | +19% |
| 16 JUN 2021 | 06211339 | Yoakum District | IH0010 Rock/riprap (material only) from FAYETTE, LAVACA, DEWITT, AND GONZAL to COUNTIES | 1 of 3 | $100,000 | Low, 30% under the second |
| 16 JUN 2021 | 06211340 | Yoakum District | US0059 Rock/riprap (material only) from WHARTON, ETC. | 1 of 2 | $120,000 | Low, 24% under the second |
| 08 JUN 2021 | 06211701 | Bryan District | SH0036 Rock/riprap from VARIOUS to VARIOUS | 4 of 5 | $214,200 | +21% |
| 08 JUN 2021 | 06211702 | Bryan District | SH0006 Rock/riprap from VARIOUS to VARIOUS | 5 of 6 | $239,700 | +41% |
| 08 JUN 2021 | 06211703 | Bryan District | IH0045 Rock/riprap from VARIOUS to VARIOUS | 4 of 4 | $394,400 | +81% |
| 05 MAR 2021 | 03214218 | Yoakum District | IH0010 Bpm project from DISTRICT WIDE | 8 of 10 | $941,635 | +50% |
| 05 FEB 2021 | 02213222 | Yoakum District | CR Embankment stabilization from INTERCOSTAL DRIVE | 8 of 10 | $136,050 | +135% |
| 04 SEP 2020 | 09204207 | Austin District | SH0080 Bridge preventative maintenance from SAN MARCOS RIVER BRIDGE ON SH 80 to DRAW ON SH 80 | 4 of 7 | $414,450 | +32% |
| 08 MAY 2020 | 05203232 | Austin District | SH 71 Intersection improvements from 0.18 MI WEST OF VISTA VIEW TRAIL to 0.39 MI EAST OF VISTA VIEW TRAIL | 5 of 7 | $849,823 | +12% |
| 06 MAY 2020 | 05201303 | Yoakum District | IH0010 Rock/riprap (material only) from FAYETTE, LAVACA, GONZALES, AND to DEWITT COUNTIES | 2 of 2 | $122,000 | +16% |
| 06 MAY 2020 | 05201307 | Yoakum District | US0059 Rock/riprap (material only) from WHARTON, MATAGORDA, AUSTIN, AND to COLORADO COUNTIES | 2 of 2 | $156,250 | +7.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.