TxDOT contract A00187704 bid tabulation
Bridge Replacement, SH 317 (at BNSF Railroad to .). Let by Texas DOT on March 5, 2025, Bosque, Waco District. 5 bids received; low bid $6,597,547 by Orion Construction, LLC, -3.2% against the engineer's estimate of $6,814,396.
- Owner
- Texas DOT
- Letting
- 05 MAR 2025
- Pay items
- 87
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Orion Construction, LLC | $6,597,547 | Low | -3.0% |
| 2 | MP Heavy Construction Inc | $6,697,725 | +2.0% | -2.0% |
| 3 | James Construction Group, LLC | $7,119,281 | +8.0% | +4.0% |
| 4 | Lakey, Inc. | $7,773,923 | +18% | +14% |
| 5 | Altus Construction LLC | $7,812,561 | +18% | +15% |
Engineer's estimate: $6,814,396.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Orion Construction, LLC | 2. MP Heavy Construction Inc | 3. James Construction Group, LLC | 4. Lakey, Inc. | 5. Altus Construction LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 18.48 | $5,857.62 | $10,000 | $12,000 | $29,400 | $3,650.00 | $41,863 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 624 | $20.00 | $14.00 | $21.05 | $15.63 | $24.50 | $21.25 |
| 3 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 175 | $52.08 | $6.50 | $19.64 | $7.41 | $11.00 | $9.35 |
| 4 | Removing concrete (appr slab) (104-7030) | SY | 223 | $95.00 | $26.00 | $24.00 | $8.44 | $165.00 | $318.71 |
| 5 | Removing concrete (flume) (104-7041) | SY | 104 | $150.00 | $18.00 | $30.60 | $15.44 | $31.31 | $26.61 |
| 6 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 6,767 | $6.32 | $6.00 | $5.40 | $1.75 | $40.00 | $3.26 |
| 7 | Excavation (roadway) (110-7001) | CY | 1,817 | $15.00 | $25.00 | $25.70 | $15.00 | $23.80 | $15.91 |
| 8 | Embankment (final)(DC)(type C) (132-7006) | CY | 6,849 | $37.65 | $42.00 | $23.48 | $25.44 | $26.00 | $41.25 |
| 9 | Furn & place topsoil (4") (160-7002) | SY | 9,168 | $2.09 | $2.50 | $5.90 | $0.31 | $19.25 | $3.40 |
| 10 | Drill seed (permanent_rural_clay) (164-7010) | SY | 9,168 | $0.14 | $0.38 | $0.46 | $0.55 | $0.40 | $0.34 |
| 11 | Drill seed (temporary_warm_cool) (164-7015) | SY | 9,168 | $0.09 | $0.38 | $0.40 | $0.50 | $0.28 | $0.25 |
| 12 | Vegetative watering (168-7001) | TGL | 150 | $80.00 | $50.00 | $50.14 | $36.89 | $34.50 | $31.09 |
| 13 | Soil ret BLKT(SL_steep_clay_short) (169-7005) | SY | 788 | $1.17 | $2.75 | $2.40 | $2.00 | $37.70 | $45.33 |
| 14 | FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188) | CY | 2,265 | $70.00 | $95.00 | $47.09 | $62.75 | $50.00 | $39.96 |
| 15 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 215 | $348.18 | $355.00 | $251.10 | $316.28 | $360.90 | $312.51 |
| 16 | Lime TRT (existing material)(12") (260-7009) | SY | 7,957 | $3.50 | $8.00 | $5.25 | $6.95 | $3.80 | $3.59 |
| 17 | Emuls asphalt (BS or subgr TRT)(CSS-1H) (314-7004) | GAL | 9,548 | $2.35 | $4.75 | $3.35 | $5.00 | $14.00 | $11.20 |
| 18 | Fog seal (CSS-1H) (315-7004) | GAL | 796 | $3.00 | $6.60 | $6.52 | $5.00 | $2.88 | $3.40 |
| 19 | Asphalt (CRS-2) (316-7011) | GAL | 2,387 | $4.58 | $6.60 | $4.97 | $5.00 | $4.76 | $4.53 |
| 20 | Aggregate (type-D or L, GR-4) (316-7253) | CY | 59 | $218.29 | $450.00 | $367.43 | $350.00 | $197.50 | $255.12 |
| 21 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 1,750 | $120.60 | $210.00 | $139.21 | $155.00 | $135.50 | $228.91 |
| 22 | Tack coat (344-7077) | GAL | 680 | $2.60 | $6.75 | $3.73 | $5.00 | $4.48 | $3.81 |
| 23 | Cem stabil BKFL (400-7010) | CY | 224 | $232.50 | $220.00 | $274.34 | $194.14 | $300.00 | $247.30 |
| 24 | Temporary special shoring (403-7001) | SF | 6,057 | $37.50 | $10.50 | $28.76 | $71.10 | $60.00 | $32.02 |
| 25 | Drilled shaft (18 in) (416-7002) | LF | 114 | $151.19 | $200.00 | $179.64 | $132.01 | $375.00 | $162.87 |
| 26 | Drilled shaft (36 in) (416-7006) | LF | 602 | $324.08 | $265.00 | $248.30 | $189.46 | $550.00 | $237.34 |
| 27 | Drilled shaft (48 in) (416-7008) | LF | 240 | $949.50 | $500.00 | $737.83 | $357.77 | $534.30 | $451.80 |
| 28 | Class B concrete (flume) (420-7010) | CY | 44 | $909.18 | $750.00 | $420.00 | $569.58 | $1,214.37 | $1,032.09 |
| 29 | Class C concrete (abutment)(HPC) (420-7013) | CY | 61.80 | $1,711.33 | $1,900.00 | $1,450.00 | $780.00 | $1,767.75 | $1,188.86 |
| 30 | Class C concrete (cap)(HPC) (420-7023) | CY | 19.40 | $1,650.00 | $2,500.00 | $1,349.62 | $1,605.31 | $1,724.63 | $3,187.12 |
| 31 | Class C concrete (cap)(HPC)(mass) (420-7025) | CY | 134.30 | $1,500.00 | $1,350.00 | $1,955.00 | $773.31 | $1,724.63 | $1,040.79 |
| 32 | Class C concrete (column)(HPC) (420-7039) | CY | 110.40 | $1,988.51 | $1,600.00 | $1,615.00 | $985.83 | $1,724.63 | $1,221.12 |
| 33 | Reinforced concrete slab (422-7001) | SF | 15,750 | $29.50 | $35.00 | $27.00 | $35.00 | $35.00 | $33.91 |
| 34 | Approach slab (422-7013) | CY | 64.20 | $658.02 | $1,000.00 | $1,064.65 | $593.36 | $750.00 | $1,011.16 |
| 35 | Retaining wall (MSE) (423-7001) | SF | 5,407 | $94.25 | $90.00 | $86.48 | $58.79 | $70.50 | $127.90 |
| 36 | Prestressed concrete girder (TX46) (425-7004) | LF | 1,117.95 | $190.00 | $290.00 | $238.32 | $307.00 | $200.00 | $267.07 |
| 37 | Riprap (concrete)(4 in) (432-7001) | CY | 346 | $1,119.00 | $950.00 | $642.14 | $568.12 | $1,000.00 | $386.07 |
| 38 | Riprap (concrete)(6 in) (432-7003) | CY | 24 | $384.00 | $950.00 | $435.23 | $568.09 | $594.07 | $1,019.88 |
| 39 | Riprap (mow strip)(4 in) (432-7013) | CY | 77 | $643.75 | $1,100.00 | $649.68 | $665.49 | $700.00 | $560.36 |
| 40 | Riprap (stone type R)(dry)(18 in) (432-7024) | CY | 41 | $171.88 | $320.00 | $250.00 | $225.53 | $100.00 | $280.47 |
| 41 | Riprap (stone common)(dry)(6 in) (432-7029) | CY | 14 | $300.00 | $400.00 | $244.67 | $263.77 | $115.00 | $97.74 |
| 42 | Elastomeric bearing (F3) (434-7033) | EACH | 7 | $6,600.00 | $3,500.00 | $4,135.20 | $3,213.60 | $4,000.00 | $1,699.80 |
| 43 | Sliding elastomeric bearing (ES 3) (434-7043) | EACH | 7 | $5,000.00 | $3,500.00 | $2,804.40 | $4,427.29 | $5,000.00 | $1,699.80 |
| 44 | STR steel (plate girder) (442-7001) | LB | 419,200 | $3.08 | $2.75 | $2.37 | $3.50 | $2.86 | $2.94 |
| 45 | Rail (type SSTR) (450-7024) | LF | 814 | $232.50 | $125.00 | $126.31 | $95.00 | $101.97 | $109.23 |
| 46 | Rail (CLF-RO) (450-7049) | LF | 814 | $102.30 | $175.00 | $142.50 | $151.89 | $162.00 | $142.78 |
| 47 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 198 | $166.25 | $350.00 | $252.18 | $211.56 | $246.71 | $275.54 |
| 48 | RC pipe (CL III)(24 in) (464-7005) | LF | 57 | $115.00 | $125.00 | $114.00 | $81.14 | $127.30 | $162.65 |
| 49 | RC pipe (CL III)(30 in) (464-7007) | LF | 30 | $195.00 | $180.00 | $148.00 | $128.84 | $138.80 | $122.81 |
| 50 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $1,775.00 | $2,000.00 | $4,088.00 | $1,610.63 | $2,137.85 | $1,817.93 |
| 51 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 2 | $2,650.00 | $4,200.00 | $5,702.00 | $4,233.92 | $3,946.35 | $3,353.99 |
| 52 | Removing structure (pipe) (496-7007) | LF | 35 | $18.00 | $20.00 | $36.93 | $39.82 | $31.40 | $26.69 |
| 53 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $69,495 | $150,000 | $265,830 | $350,000 | $127,725 | $212,554 |
| 54 | Mobilization (500-7001) | LS | 1 | $600,000 | $150,000 | $1,013,641 | $602,615 | $995,222 | $777,544 |
| 55 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $8,000.00 | $6,000.00 | $3,500.00 | $3,975.32 | $10,000 | $21,247 |
| 56 | Portable changeable message sign (503-7001) | DAY | 180 | $143.26 | $100.00 | $120.33 | $132.31 | $100.00 | $80.23 |
| 57 | Portable changeable message sign (503-7002) | EACH | 3 | $9,331.67 | $25,000 | $11,000 | $17,509 | $9,500.00 | $8,169.33 |
| 58 | TMA (stationary) (505-7001) | DAY | 180 | $183.21 | $250.00 | $261.05 | $717.87 | $401.00 | $188.91 |
| 59 | TMA (mobile operation) (505-7002) | HR | 40 | $43.69 | $200.00 | $90.00 | $177.24 | $73.95 | $62.85 |
| 60 | Rock filter dams (install) (type 2) (506-7002) | LF | 40 | $20.00 | $70.00 | $47.20 | $45.00 | $54.30 | $46.15 |
| 61 | Rock filter dams (remove) (506-7011) | LF | 40 | $10.00 | $10.00 | $13.94 | $10.00 | $17.03 | $14.47 |
| 62 | Construction exits (install) (type 1) (506-7020) | SY | 159 | $39.10 | $55.00 | $28.93 | $34.00 | $34.00 | $28.90 |
| 63 | Construction exits (remove) (506-7024) | SY | 159 | $14.90 | $10.00 | $9.29 | $12.00 | $12.66 | $10.76 |
| 64 | Temporary sediment control fence (install) (506-7039) | LF | 3,421 | $9.50 | $6.00 | $3.30 | $3.50 | $4.57 | $3.88 |
| 65 | Temporary sediment control fence (remove) (506-7041) | LF | 3,421 | $4.13 | $1.00 | $1.08 | $1.50 | $1.25 | $1.17 |
| 66 | Concrete curb & gutter (type II) (529-7009) | LF | 60 | $75.00 | $70.00 | $41.66 | $84.01 | $62.50 | $53.12 |
| 67 | Driveways (ACP) (530-7010) | SY | 744 | $45.00 | $95.00 | $62.10 | $63.64 | $91.16 | $77.47 |
| 68 | Metal W-beam guard fence (steel post) (540-7002) | LF | 925 | $31.50 | $36.00 | $21.89 | $29.00 | $33.00 | $29.75 |
| 69 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,850.00 | $2,800.00 | $1,894.75 | $2,250.00 | $2,370.00 | $2,124.74 |
| 70 | Remove metal beam guard fence (542-7001) | LF | 958 | $2.81 | $3.25 | $4.95 | $2.50 | $3.00 | $2.74 |
| 71 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,075.00 | $3,800.00 | $2,503.08 | $2,950.00 | $3,331.54 | $2,831.47 |
| 72 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $350.00 | $325.00 | $600.00 | $250.00 | $300.00 | $271.97 |
| 73 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 11 | $305.00 | $400.00 | $424.63 | $385.00 | $340.20 | $436.28 |
| 74 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 8 | $1,025.00 | $1,000.00 | $373.32 | $720.00 | $1,075.00 | $815.90 |
| 75 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 2 | $675.00 | $1,700.00 | $627.91 | $935.00 | $1,000.00 | $1,059.54 |
| 76 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 9 | $20.00 | $50.00 | $46.20 | $38.00 | $50.00 | $22.10 |
| 77 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 13 | $42.50 | $50.00 | $46.20 | $38.00 | $45.00 | $24.36 |
| 78 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 3,280 | $0.79 | $1.80 | $0.76 | $0.43 | $0.19 | $0.18 |
| 79 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 3,280 | $0.48 | $1.78 | $0.77 | $0.42 | $0.19 | $0.19 |
| 80 | Pavement sler 6" (666-7347) | LF | 6,560 | $0.80 | $0.10 | $0.54 | $0.35 | $1.00 | $0.39 |
| 81 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 3,280 | $0.68 | $2.84 | $1.01 | $1.25 | $2.25 | $0.68 |
| 82 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 3,280 | $0.94 | $2.84 | $0.99 | $1.25 | $2.25 | $0.66 |
| 83 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 47 | $5.91 | $21.00 | $6.90 | $8.90 | $6.50 | $4.67 |
| 84 | Eliminating existing PM & markers (4") (677-7001) | LF | 7,192 | $1.55 | $1.05 | $1.51 | $0.76 | $1.63 | $0.64 |
| 85 | Pavement surface preparation for marking (6") (678-7002) | LF | 6,560 | $0.40 | $0.43 | $0.24 | $0.04 | $1.00 | $0.17 |
| 86 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 47 | $6.54 | $4.25 | $1.51 | $1.60 | $0.44 | $1.03 |
| 87 | Anti-graffiti coatng (permnent-type III) (740-7006) | SF | 2,416 | $2.00 | $2.50 | $2.04 | $2.85 | $3.00 | $1.94 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.